• Title/Summary/Keyword: Road pavement design

Search Result 254, Processing Time 0.02 seconds

Cost Analysis of Modified Asphalts using a Performance Based Fracture Criterion (공용성에 근거한 파괴기준을 이용한 개질 아스팔트 포장의 비용 효과 분석)

  • Kim, Boo-Il
    • International Journal of Highway Engineering
    • /
    • v.7 no.4 s.26
    • /
    • pp.49-56
    • /
    • 2005
  • The effect of modified asphalts is evaluated by simple comparison of a single parameter (i.e., tensile strength, stiffness, etc.) between modified asphalt mixture and unmodified mixture. The use of a single parameter to evaluate the effect of modified asphalt must be questioned. Rather, a single unified framework that accounts for changes in key mixture properties is needed to effectively evaluate the modified asphalt mixtures. This study used a new performance-based fracture parameter as a single unified framework, the Energy Ratio (ER), for quantifying the effect of modified asphalts oil the fracture resistance of mixtures. The Energy Ratio was then used as a performance criterion for calculating the construction cost of two modified asphalt pavements (SBS and Crumb Rubber) and unmodified asphalt pavement. The results showed that the Energy Ratio of SBS modified asphalt was higher than those of crumb rubber and unmodified asphalt. Cost analyses indicated that the construction cost of the AC layer would be reduced by up to 24% by SBS modification. Based on the results, the Energy Ratio is capable of evaluating the effect of modified mixtures, and may form the basis of a promising fracture criterion for performance-based thickness design in asphalt pavements.

  • PDF

A Experimental Study on the Proper Particle Gradation of Sub-base to Consider the Recent Climate Change (기후변화를 고려한 포장 보조기층의 적정입도분포에 관한 실험연구)

  • Choi, Jaesoon;Han, Nuri
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.7
    • /
    • pp.51-56
    • /
    • 2013
  • Recently, a top record of hourly-based rainfall has been changed annually and flood damages of road have increased. To solve this problem, pavements for drainage were developed and practically constructed but there was no considerations on sub-base. In this research, we proposed standard for distribution of particle size of sub-base to consider strength characteristic and drainage property. We focused to compare coefficients strength and permeability by laboratory tests. Prior to tests, 4 samples were selected under the consideration on the international or domestic design guideline. In the tests, strength characteristics were compared with resilient modulus. Also, permeability characteristics were compared with coefficient of upward and downward permeability. Resilient modulus was determined with MR test using cyclic triaxial testing system. Two permeability tests were carried out. One is variable head permeability test for downward drainage and the other is Rowe Cell test for upward drainage. In the case of Rowe Cell test, middle-sized sampler with 150mm diameter was used for this study. Consequentially, we tried to find the optimum distribution of particle size to satisfy both of strength and permeability characteristics for sub-base.

Modeling and Simulation for Predicting the Impact of Hydraulic Breaker (유압 브레이커의 충격량 예측을 위한 모델링과 해석)

  • Kim, Sung-Hyun;Chung, Jaeho;Baek, Dong-Cheon;Park, Jong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.741-749
    • /
    • 2019
  • A hydraulic breaker attached to an excavator is a kind of constructuion equipment which is used for the disassembling of buildings, crashing road pavement, breaking rocks at quarry and etc. Therefore, the performance of the hydraulic breaker is mainly evaluated by the impact quantity and impact efficiency, which is an important factor for both the manufacturer and the user. In this paper, modeling and simulation for the prediction of the impact of the hydraulic breaker was conducted according to hydraulic pressure area and operating conditions of the hydraulic valve and piston using the commercial tools SimulationX for the 20ton hydraulic breaker which is mainly used in construction site. In order to verify the reliability of modeling and simulation, the results of previous experimental studies were compared and verified. The results of this study are expected to be useful for predicting the impact of the hydraulic breaker at the design stage before manufacturing and for studying parameters for improving the impact quantity. In addition, the manufacturer predicts that the development time and cost will be reduced through trial and error prevention by predicting the impact of the hydraulic breaker through the results of this paper.

A Study on the Yousang-Dae Goksuro(Curve-Waterway) in Gangneung, Yungok-Myun, Yoodung Ri (강릉 연곡면 유등리 '유상대(流觴臺)' 곡수로(曲水路)의 조명(照明))

  • Rho, Jae-Hyun;Shin, Sang-Sup;Lee, Jung-Han;Huh, Jun;Park, Joo-Sung
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.30 no.1
    • /
    • pp.14-21
    • /
    • 2012
  • The object of the study, Yousang-Dae(流觴臺) and engraved Go broad text on the flat rock in Gangneung-si Yungok-myun Yoodung-ri Baemgol, reveals that the place was for appreciating arts like Yusang Goksu and Taoist hermit's games. three times of detail reconnaissance survey brought about the results as follows. There is a the text, Manwolsan(滿月山) Baegundongcheon(白雲洞天), engraved on the rock in Baegunsa(白雲寺) that had been built by Doun at the first year of King Hungang(in 875) of the United Shilla, became in ruins in the middle of Joseon, and then was rebuilt in 1954. The text is an invaluable evidence indicating that the tradition of Taoist hermit and Sunbee(classical scholars) culture has been generated in Baemgol Valley. According to the 2nd vol. of Donghoseungram(東湖勝覽), the chronicle of Gangneung published by Choi Baeksoon in 1934, there is a record saying that 'Baegunsa in Namjeonhyeon is the classroom where famous teachers like Yulgok Lee Yi or Seongje Choi Ok were teaching' that verifies the historic property of the place. In addition, the management of Nujeong(樓亭) and Dongcheon can be traced through Baegunjeong(白雲亭) constructed by Kim Yoonkyung(金潤卿) in Muo year, the 9th year of Cheoljong(1858) according to Donghoseungram and the completed version of Jeungboyimyoungji(增補臨瀛誌). Also, Baegundongdongcheon(白雲亭洞天), the text engraved on the standing stone across the stream from Yousang-Dae stone, was created 3 years after the Baegunjeong construction in the 12th year of Cheoljong(1861), which refers a symbolic sign closely related with Yousang-Dae. Based on this premise and circumstance, with careful studying the remains of 'Yusang-dae' Goksuro, we discovered that the Sebun-seok(細分石) controling the amount and the speed of moving water and the remains of furrows of Keumbae-soek(擒盃石) and Yubae-gong(留盃孔) containing water stream with cups through the mountain stream and rocks around Yusang-Dae. In addition, as 21 people's names engraved under the statement of 'Oh-Seong(午星)' were discovered on the bottom of the rock, this clearly confirms that the place was one of the main cultural footholds of tasting the arts which have characteristics of Yu-Sang-Gok-Su-Yeon(流觴曲水宴) until the middle of the 20th century. It implies that the arts tasting culture of Sunbees had been inherited centering on Yusang-dae in this particular place until the middle of the 20th century. It is necessary to be studied in depth because the place is a historic and unique cultural place where 'Confucianism, Buddhism, and Zen'were combined together. Based on the result of the study, the identification of 23 people as well as the writer of Yusang-Dae text should be carefully studied in depth in terms of the characteristics of the place through gathering data about appreciation of arts like Yusanggoksu. Likewise, we should make efforts to discover the chess board engraved on the rock described on the documents, thus we should consider to establish plans to recover the original shape of the place, for example, breaking the cement pavement of the road, additional excavation, changing the existing route, and so fourth.