Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.2
/
pp.34-43
/
2007
To investigate the restoration procedure on soil physical properties and vegetation at the surface of strip road affected by timber harvesting operation. This study was carried out at strip roads constructed between 1989 and 1994 in Mt. Baekun, Kwangyang, Chollanam-Do. Soil hardness of the surface layer was improved with change of time after strip road construction, but that of 7.6~15 cm depth from the surface was not improved. According to linear regression analysis, it was estimated 16.6 years in 0~7.5 cm and 16.9 years in 7.6~15 cm soil depth to be restored to natural forest lands. The amount of surface soil erosion was 0.045$m^3$/km/yr on strip roads constructed in 1989 and 1990, and road constructed in 1994 showed the highest value (4.5$m^3$/km/yr). Vegetation coverage rates of road surface were 96.7% in strip roads constructed in 1990. Those of cutslope and fillslope were highest in roads constructed in 1990. The results indicated that strip roads were restored with change of time after road construction.
Proceedings of the Computational Structural Engineering Institute Conference
/
2008.04a
/
pp.184-189
/
2008
In this study, an artificial wheel load generation method is proposed to assist practical engineers performing dynamic analysis with simple procedure. To generate an artificial wheel loads from running vehicle, PSD(Power Spectrum Density) profiles of actual wheel load were sampled in terms of various road roughnesses. A detailed truck and bridge models were used for sampling actual wheel load to represent the real motion of moving vehicle. These wheel load profiles were simplified for the artificial wheel load. The simplification of actual wheel load profiles was performed by regression analysis. The result showed that the artificial wheel load well represents the real profiles of wheel load.
The development of idyllic housings, is in increasing growth in the suburban areas of Seoul, presents some critical problems such as in sufficient common open space and poor living condition, which are mainly caused by disorderly designed. Through comparing planning indices of idyllic housing, this paper aims to diagnose the condition and causes of those problems and to present some basic issues on improvement direction. The causes of problems can be summarized as the blind point in regulation system, the shortness of planning elements of a housing block which includes road systems and public facilities, and the mismatch of housing type with density, on which includes road systems and public facilities, and the mismatch of housing type with density, on which hereafter improvement suggestion should be focused. And this study suggest the simulation models on an ideal idyllic housing to be applied in our forthcoming idyllic housing of Korea, which can indeed become a generalized alternative to the livable idyllic housing.
A time domain method for solving nonstationary random vibration caused by vehicle acceleration is first proposed in which a time changing model is established for representing nonstationary excitation of a rough road. Furthermore a novel frequency domain method called the transient power spectral density with spatial frequency (TPSD) is presented to obtain a response of vehicle system in frequency domain. This method has been proved to be valid by comparing numerical results with the exact solution.
Management of the existing traffic network and understanding current traffic conditions is the most important and effective way to solve traffic congestion. This research investigates the status of Korea expressway through the Speed-Flow-Density diagram and finds the best suitable queueing model for each area. Dynamic structure in the queueing model enables us to reflect the structural change of the road in case of traffic congestion. To find the best model and estimate the parameters, we use the Newton-Raphson method. Finally, we examine the road efficiency in view of the optimal speed and density using the conditional distribution of speed and density of a S-F-D diagram.
The negative impacts of roads on wildlife mortality have been well documented, and one of the most significant impact is wildlife-vehicle collisions (WVCs) in most countries throughout the world. While road impacts on wildlife are a truly global concern with a large socio-economic cost, few researches in Korea have been quantified road-kill occurrence on highways or identified extensively seasonal and geographic patterns of this phenomenon. Therefore, we analyzed highway mortality of wild mammals in Korea using database from five years of nation-wide data on WVCs, and estimated road-kill density by standardizing on per km and per $10^3$ vehicle basis. During 2008 through 2012, a total of 10,940 wildlifes were reported killed on highways, with an average of 2,188 cases per year. There were 2,376 road-kills in 2012, and this equates to 0.01 road-kills per km per week or one road-kill every 88.5 km per week. For time of day, road-kills occurred more frequently in the early morning (05:00-08:00, 38.3%), and day of week did not have a significant influence in any individual year. The road-kill was highest in the spring (March- May, 33.0%) and least in the winter (December-February, 16.1%), and the most frequently killed native species were of Korean water deer (79.7%), raccoon dog (12.7%), Korean hare (3.1%), and leopard cat (1.2%). The overall standardized kill-rate (number/10 km/1,000 vehicles/month) in 2012 was 0.057 with highest on Dangjinyeongdeok highway (0.476), followed by Yeongdong (0.274), Sooncheonwanju (0.233), Iksanpohang (0.187), and Joongang (0.150). This study highlights that the frequency of WVCs are prevalent throughout the highways in Korea. Further work is needed to determine whether such a level of mortality is sustainable from an ecological point of view.
This study tested the usefulness of landscape indices for quantifying forest fragmentation due to linear development projects. Research was carried out in the middle-upper Nakdong River watershed, which has been affected by the expressway building, or national road-widening. Landscape indices were calculated from the forest cover maps before and after road-building using FRAGSTATS 3.1. We could successfully demonstrate the forest fragmentation based on landscape indices; (1) patch size decreased, and edge density and patch density increased (2) roads simplified patch shapes, especially in the larger patches, (3) patch core area size decreased, and core area density increased, (4) the distance increased between the focal patch and each of the other patches within the search radius (=1km) as a result of roads. We suggest several important needs for future researches, including continued investigation of scaling issues, development of indices that measure specific components of spatial pattern, and study of the relationships between forest fragmentation and ecological processes.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.16
no.11
/
pp.1035-1043
/
2004
For a long road tunnel, a tunnel ventilation system may be used in order to reduce the pollution level below the required level. To control the tunnel pollution level, a closed loop control algorithm may be used. The feedforward prediction algorithm and the cascade control algorithm were developed to regulate the CO level in a tunnel. The feedforward prediction algorithm composed of the traffic estimation algorithm and the CO density prediction algorithm, and the cascade control algorithm composed of the jet fan control algorithm and the air velocity setpoint algorithm. The verification of control algorithms was carried out by dynamic models developed from the actual tunnel data. The simulation results showed that control algorithms developed for this study were effective for the control of the tunnel ventilation system.
Journal of the Korean Association of Geographic Information Studies
/
v.25
no.4
/
pp.94-106
/
2022
In order to increase timber self-sufficiency, Korea's 6th Basic Forest Plan aims to increase the density of forest roads to 12.8 m ha-1 by 2037. However, due to rapid re-forestation, current management infrastructure is insufficient, with just 4.8 m ha-1 of forest roads in 2017. This is partly due to time and cost limitations on the process of forest road feasibility evaluation, which considers factors such as topography and forest conditions. To solve this problem, we propose an eco-friendly and efficient forest road network planning method using a geographic information system (GIS), which can evaluate a potential road site remotely based on spatial information. To facilitate such planning, this study identifies forest road construction priorities that can be evaluated using spatial information, such as topography, forest type and forest disasters. A method of predicting the optimal route to connect a forest road with existing roads is also derived. Overlapping analysis was performed using GIS-MCE (which combines GIS with multi-criteria evaluation), targeting the areas of Cheongsong-gun and Buk-gu, Pohang-si, which have a low forest-road density. Each factor affecting the suitability of a proposed new forest road site was assigned a cost, creating a cost surface that facilitates prioritization for each forest type. The forest path's optimal route was then derived using least-cost path analysis. The results of this process were 30 forestry site recommendations in Cheongsong-gun and one in Buk-gu, Pohang-si; this would increase forest road density for the managed forest sites in Cheongsong-gun from 1.58 m ha-1 to 2.55 m ha-1. This evaluation method can contribute to the policy of increasing timber self-sufficiency by providing clear guidelines for selecting forest road construction sites and predicting optimal connections to the existing road network.
Journal of Korean Society for Geospatial Information Science
/
v.5
no.2
s.10
/
pp.131-144
/
1997
Traffic jam densified day by day is phenomenon to occur lack of the road capacity in comparison with traffic density, but lack of the road cannot be concluded by main cause of traffic ism. Because the central function of a city would be concentrated upon the downtown and traffic demand would not be evenly distributed by the classification of an hour. Therefore, this study based on the fact that each driver will select the route generating traffic delay very low when path choice from origin to destination in travel plan estimating the quality of passage could be maintained the speed he want will approach to a characteristic grasp of a road, traffic, driver changing every moment by traffic-demand of road increased as a geometrical series with analysis a classification of a street, a intersection along the path on traffic density and highway capacity analysis the path using GIS techniques about complex street network, also will get the path of actual optimum for traffic delay trend creating under various condition the classification per a hour, a day of week and an incident through network such as analysis for traffic generation zone adjacent about street, intersection, afterward will expect the result increasing efficiency of the road-use through a good distribution of traffic by optimum-path choice, accordingly will prepare the scientific, objective, appropriate basis to decide the reasonable time of a road-widen and expansion through section analysis along a rate of traffic volume vs. road capacity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.