• Title/Summary/Keyword: Road bridges

Search Result 236, Processing Time 0.027 seconds

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

A Study on the Accuracy Comparison of Object Detection Algorithms for 360° Camera Images for BIM Model Utilization (BIM 모델 활용을 위한 360° 카메라 이미지의 객체 탐지 알고리즘 정확성 비교 연구)

  • Hyun-Chul Joo;Ju-Hyeong Lee;Jong-Won Lim;Jae-Hee Lee;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.14 no.3
    • /
    • pp.145-155
    • /
    • 2023
  • Recently, with the widespread adoption of Building Information Modeling (BIM) technology in the construction industry, various object detection algorithms have been used to verify errors between 3D models and actual construction elements. Since the characteristics of objects vary depending on the type of construction facility, such as buildings, bridges, and tunnels, appropriate methods for object detection technology need to be employed. Additionally, for object detection, initial object images are required, and to obtain these, various methods, such as drones and smartphones, can be used for image acquisition. The study uses a 360° camera optimized for internal tunnel imaging to capture initial images of the tunnel structures of railway and road facilities. Various object detection methodologies including the YOLO, SSD, and R-CNN algorithms are applied to detect actual objects from the captured images. And the Faster R-CNN algorithm had a higher recognition rate and mAP value than the SSD and YOLO v5 algorithms, and the difference between the minimum and maximum values of the recognition rates was small, showing equal detection ability. Considering the increasing adoption of BIM in current railway and road construction projects, this research highlights the potential utilization of 360° cameras and object detection methodologies for tunnel facility sections, aiming to expand their application in maintenance.

Texture Mapping of a Bridge Deck Using UAV Images (무인항공영상을 이용한 교량 상판의 텍스처 매핑)

  • Nguyen, Truong Linh;Han, Dongyeob
    • Journal of Digital Contents Society
    • /
    • v.18 no.6
    • /
    • pp.1041-1047
    • /
    • 2017
  • There are many methods for surveying the status of a road, and the use of unmanned aerial vehicle (UAV) photo is one such method. When the UAV images are too large to be processed and suspected to be redundant, a texture extraction technique is used to transform the data into a reduced set of feature representations. This is an important task in 3D simulation using UAV images because a huge amount of data can be inputted. This paper presents a texture extraction method from UAV images to obtain high-resolution images of bridges. The proposed method is in three steps: firstly, we use the 3D bridge model from the V-World database; secondly, textures are extracted from oriented UAV images; and finally, the extracted textures from each image are blended. The result of our study can be used to update V-World textures to a high-resolution image.

The Changes of Adjacent Residential Area after the Restoration of Covered Urban Streams (도시복개하천의 복원사업 이후 인접 주거지의 물리적 특성 변화)

  • Kim, Jun-Yeong;Yang, Woo-Hyun
    • Journal of the Korean housing association
    • /
    • v.25 no.6
    • /
    • pp.133-146
    • /
    • 2014
  • This study aims to analyze the changes of adjacent residential area after the restoration of covered urban streams in seoul. The changes of adjacent residential area after restoration were analyzed by changes of land using, urban structure, individual lot of land and architecture to investigate relationship of the urban stream and residential change. The result as follows: the first one is the change of land use and urban structure in adjacent residential area. This change of infrastructure through stream restoration has transformed land use and urban structure in adjacent residential area. Secondly, there is the changes of the individual lot of land. It seemed that new development by combined lots would be concentrated in stream-side blocks. But, the changes of lots such as combining or dividing lots tend to be concentrated in stream-side, main road and main streets. In stream-side, commercial function of land use has changed to residential one which has restored streams landscape by transformation of lots use without changes of ownership-lots. Finally, there is the change of architecture. It turned out new building in adjacent residential area is similar to general development. However, new building in streamside is related to direction of stream. In addition, remodeling and expansion tend to change in commercial buildings on stream-side bridges of corner lots intensively. As a result, it is related to expectation of architectural activation and improvement of sidewalk environment by stream restoration.

Anti-seismic Capacity Improvement Modelling of Bridge Pier by Nickel -chrome Alloy Bar (니켈-크롬 합금 강바를 이용한 교각부 내진성능향상 모델링에 관한 연구)

  • Jang, Il-young;song, Jae-ho;Song, Seok-min;Lee, Seung-young;Ryu, Jeong-su
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Seismic design of newly built bridges can be considered and carried out during construction process according to the revised road bridge design standard issued recently. While for the existing reinforced concrete bridge priers under service before new standard implements, their resistance capacity against lateral seismic loading is inferior. In this research, seismic reinforcing for existing bridge piers by nickel-chrome alloy bar has been analyzed. Based on the established model by MIDAS program, the behaviors of bridge piers including deformation and stress with and without nickel-chrome alloy reinforcing bars have been compared and discussed under lateral seismic loading. And the advantages of using nickel-chrome alloy bar as seismic reinforcement over other materials, such as good performance, good economy etc. have been demonstrated by comparison with other researches. Also the anti-seismic efficiency of nickel-chrome alloy reinforcing bars has been confirmed by MIDAS modeling analysis.

  • PDF

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Experimental and numerical studies of aerodynamic forces on vehicles and bridges

  • Han, Yan;Hu, Jiexuan;Cai, C.S.;Chen, Zhengqing;Li, Chunguang
    • Wind and Structures
    • /
    • v.17 no.2
    • /
    • pp.163-184
    • /
    • 2013
  • An accurate identification of the aerodynamic characteristics of vehicles and the bridge is the premise for the coupled vibration analysis of a wind-vehicle-bridge system. At present, the interaction of aerodynamic forces between the road vehicles and bridge is ignored in most previous studies. In the present study, an experimental setup was developed to measure the aerodynamic characteristics of vehicles and the bridge for different cases in a wind tunnel considering the aerodynamic interference. The influence of the wind turbulence, the wind speed, the vehicle interference, and the vehicle position on the aerodynamic coefficients of vehicles, and the influence of vehicles on the static coefficients of the bridge were investigated, based on the experimental results. The variations in the aerodynamic characteristics of vehicles and the bridge were studied and the measured results were validated according to the results of surface pressure measurements on the vehicle and the bridge. The measured results were further validated by comparing the measured results with values derived numerically. The measured results showed that the wind turbulence, the vehicle interference, and the vehicle position significantly affected the aerodynamic coefficients of vehicles. However, the influence of the wind speed on the aerodynamic coefficients of the studied vehicle is small. The static coefficients of the bridge were also significantly influenced by the presence of vehicles.

The Prediction of Remaining Life of Concrete Bridge Decks Using The Reliability Analysis (신뢰도 분석을 통한 고속도로 교량의 바닥판 잔존 수명 예측)

  • Park, Jung-Hee;Lee, Sang-Soon;Kim, Ji-Won;Park, Cheol-Woo;Lee, Dong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.71-79
    • /
    • 2011
  • Korean national highway has been increased 2 times more for the past ten years because of many highway geometric improvements and new routes since 2000. According to the reasons, maintenance cost has been increased continuously. Deterioration of concrete bridge decks caused by asphalt pavement deformation occupies a high proportion of overall bridge management budget. The number of current highway bridges has reached over 7,800 in 2011, and It is difficult to determine to some future budget. This study predicted the remaining life of concrete bridge decks using the reliability analysis based on Weibull distribution. and The expected future maintenance cost was estimated.

THE PSANNING, CONSTRUCTION AND ADMINISTRATION OF AUTOMOBILES PARKING LOTS IN SHANGHAI (상해기동차사회정차장(고)적 규화, 건설여관리)

  • GE MING MING
    • Proceedings of the KOR-KST Conference
    • /
    • 1995.05a
    • /
    • pp.239-250
    • /
    • 1995
  • With speeding up the process of being international municipality, the gravity of lacking parking lots in Shanghai urban area, which directly blocks the traffic in the city, has been revealed. This thesis analyses present automobiles parking capability and forecasts the future's needs for the city. To solve the problem, the concept could be to expand parking areas in city center recently to relax the tention and to do thoughtful planning in the near future on the foundation of fully consideration the trend. The municipal government has to set up policy properly, amplify regulations, strenthern the administration and open up a path to raise founds. Berween road system administration which is dynamic and parking lot system administration which is static, there are a knot on macroscopic meaning and an interference as well. The coordination of these two systems would be reflested on the effects of whole municipal traffic adminisration. Basically, public parking lots are city's foundal facilities, just like roads, bridges, etc. The main problems now in Shanghai are large parking space demands, insufficient facilities, cheap parking expenses comparing with the cost of parking lots construcion and poor administration. According to the forecast on social economy development, there will be 580 thousand automobiles in Shanghai by the year 2000, and the amount of private cars will increase greatly. The frequency of automobiles going out will be 1.45 million per day. Public parking lots being able to afford 105 thousand units are needed. To satisfy the demands, the recent aim of planning should be speed up the parking lots construction, the planning objective in next period should be developing reasonably and exceed the demands properly. In order to realize the planning objective, the government has to formulate correct policy and amplify administration regulations. The government has to adopt both administration and economy means, including charging parking people reasonably, collect necessary taxes, bringing the parking lots planning into general municipality planning, opening up an effective path to raise founds, such as set up founds for parking lots construction, issue bonds and stocks, get loans at home and abroad, etc.

  • PDF

A Study on Effect in Demand by a Discounted Charge for Continuous Use on Toll Roads (유료도로 연계이용에 있어서 요금할인이 이용수요에 미치는 영향에 관한 연구)

  • Jeong, Heon-Yeong;Lee, Jeong-Ho;Kim, Jang-Gyu
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.4
    • /
    • pp.77-89
    • /
    • 2009
  • With an increasing number of cars in Korea, the government is constantly providing roads and their related facilities. However the fundamental problems of cities like the structure of cities and the environment of roads make the traffic congestion of downtowns. To solve this problem the construction of toll roads such as tunnels and bridges is increasing but use rates of drivers is low. With more tolls required, less persons will use the roads. Thus this study is to consider offering discounted charges when using the two or more toll roads together. This study analyzes the impact that discounted charges would bring to the demand. In the meantime we looks into what the proper range should be for the discount. The results of this study are expected to be used as basis for the introduction of a discount system in the future.