• Title/Summary/Keyword: Road bed

Search Result 81, Processing Time 0.03 seconds

A Comparative Study on Productivity Analysis of Automated Pavement Crack Sealing Machines (도로면 크랙실링 자동화 장비의 작업 생산성 분석에 관한 비교 연구)

  • Seo, Won-Jung;Yoo, Hyun-Seok;Kim, Young-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1289-1298
    • /
    • 2014
  • Pavement crack sealing method, which is one of the methods to maintain and repair the road, prevents the extending of cracks by repairing cracks in its early occurrence and has already been applied to many roadworks in advanced foreign country for a long time. But in the conventional crack sealing method, traffic accidents occur frequently during the repair because it's commonly performed on the heavy traffic road or highway. It also has some difficulties in securing the safety of workers from the risk of burns caused by heated sealant. In an effort to solve these problems, automated pavement crack sealing machines such as ARMM, OCCSM, TTLS have been developed in advanced foreign country since early 1990s. Also APCS in 2004 and ACSTM in 2013 were already developed domestically. However, since these automated crack sealers developed from a number of research institutions have different test-bed conditions and productivity measurement models, it's difficult to compare and evaluate them objectively. In this study, the image processing time of the respective machines and the movement time of each motion on the work process were estimated by using fully autonomous mapping and semi-automatic mapping in order to measure the productivity in the same environmental conditions. In addition, the productivity measurement test-bed reflected domestic road characteristics was designed to estimate and compare the productivity of the automated crack sealing machines.

Comparative studies of adaptive filters for active noise barriers (능동방음벽을 위한 적응필터 비교연구)

  • Choi, Jeong-Il;Park, Kyung-Won;Cho, Hyun-Gi;Nam, Hyun-Do;Shin, Eun-Woo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.301-306
    • /
    • 2011
  • In this paper, active noise barriers for attenuation of road noise are proposed. multi-channel audio systems, DAQ part and high performance DSP H/W were designed. Active noise control firmware programs were implemented for multi-channel off-line/on-line estimation methods for secondary path transfer functions and FIR/IIR filter structure are used main noise control algorithms. To evaluate performance of proposed systems, the experiments were performed in an active noise barrier test bed for various noise cases.

  • PDF

A Study on the Mechanical Behavior of Resilient Sleeper in Concrete Bed by Connection (콘크리트 도상 방진 침목의 연결재 유·무에 대한 역학적 거동 고찰)

  • Kim, Sung-Chil;Lee, Ki-Sung;Kim, Jun-Hung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.1
    • /
    • pp.121-128
    • /
    • 1998
  • The rail, which supports the train road, distributes the wheel loads to the tie by rail stiffness. Subway sleeper on concrete ballast is construction of PC or RC sleeper. The present, PC sleeper is constructed of line 1, 2, 3, 4 Seoul Subway and RC sleeper is planing construction for the STEDEF system on concrete ballast of the line 5, Seoul, Taegu, and Kwangju Subway. The major purpose of this study is to check influence of the angle with analysising the behavior of sleeper according to the existent or non-existent of angle. And the study is carried to check static analysis by manufacture of same model.

  • PDF

Deterioration Evaluation of Railway Line Segments for Budget Distribution (예산배분을 위한 철도선로구간의 노후도 평가)

  • Kim, Seong-Ho;Choi, Chan-Yong;Na, Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1802-1809
    • /
    • 2011
  • A distribution method of limited budget for rail line facility improvement is to use investment priorities of rail line segments based on their deterioration. In this paper we present an evaluation method of rail line segment deterioration which can be used to distribute limited budget. Rail line facilities include rail track, crossing, road bed, bridge, tunnel. These facilities deterioration and line shape can affect line segment deterioration. Deterioration evaluation method we present is a weighted sum of each component deterioration scores. The component weight can be obtained from experts using analytic hierarchy process.

  • PDF

A Study on Removal of Harmful, Heavy Metals in Fly Ash from Municipal Incinerator

  • Nakahiro, Yoshitaka
    • Proceedings of the IEEK Conference
    • /
    • 2001.10a
    • /
    • pp.489-493
    • /
    • 2001
  • Big cities in Japan have serious problems due to the shortage of new reclaimed land for municipal wastes. If harmful heavy metals such as cadmium, lead, copper and etc. are contained in the municipal waste combustion residues, they are not able to fill up according to the environmental law in Japan. In this study, the removal of heavy metals in the fly ash (EP ash) was dealt with chloridizing vaporization method. EP ash as a non-hazardous materials is utilized as covering materials, road bed, and building materials.

  • PDF

Evaluation of Side-ditch Erosion Factors and Judgment of Side-ditch Stability in Forest Road (임도(林道) 옆도랑의 침식요인(浸蝕要因) 평가(評價)와 안정성(安定性) 판별(判別)에 관(關)한 연구(硏究))

  • Lee, Hae-Joo;Ji, Byoung-Yun;Jung, Do-Hyun;Kim, Jong-Yoon;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.3
    • /
    • pp.397-404
    • /
    • 2000
  • This study was carried out to investigate the influence of the road structure and site conditions on side-ditch stability of forest road. For experimental purposes, the forest road in the Kwangrung Experimental Forest, Korea Forestry Research Institute, was chosen as a study site. A total of 556 plots wes set up as every longitudinal gradient changing points by belt-transect method. Data of 10 road structural characteristics and side-ditch stability were collected from each plot and analysed by Quantification II. The main factors in order of partial correlation coefficient were longitudinal gradient, road position, inclination of cut-slope, constituent material of cut-slopes, distance of surface flow, cross-sectional shape of road, pavement material, vegetation of cut-slopes and length of cut-slope. The erosion of side-ditch of forest road occurred in the following cases; more than 8% of the longitudinal gradient, road position of hill under side and foot hill, more than $50^{\circ}$ of inclination of cut-slope, constituent material of cut-slopes of hard soil and gravel soil, more than 80m of distance of surface flow, pavement material with earth or gravel, more than medium covered of vegetation of cut-slopes, and the straight and convex form of road-bed.

  • PDF

Optimal Geophysical Exploration Performance Method for Common Detection Behind a Sewer (하수관로 배면 공동 탐지를 위한 최적 물리탐사 방법)

  • Kim, Jinyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.8
    • /
    • pp.11-17
    • /
    • 2018
  • Recently, road subsidence has been increasing in urban areas, threatening the safety of citizens. In the lower part of the road, various road facilities such as water supply and drainage pipelines and telecommunication facilities are buried, and the deterioration of the facilities causes the road subsidence. Especially, in the case of old sewer which are attracting attention as a main cause of ground subsidence, the risk of subsidence is calculated indirectly through CCTV exploration. Currently, we are finding cavity through GPR exploration. However, it is difficult to find the sewer back cavity because it is explored from the surface of the road. Thus, the nondestructive cavity exploration techniques was investigated in this study and we confirmed the applicability through experiments on the test-bed. In this study a new quantitative method is proposed to detect the cavity around sewer.

A Comparative Study on Skid Resistance Performance Evaluation Methods for Maintenance of Skid Resistance Pavement (미끄럼방지포장 유지관리를 위한 미끄럼저항 성능평가방법 비교 연구)

  • Hyun-Woo Cho;Sang-Kyun Noh;Bong-Chun Lee;Yoon-Seok Chung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.79-85
    • /
    • 2023
  • Skid resistance pavement is an accessory to the road and is a facility for the safe driving of cars by increasing the skid resistance of road pavement. In particular, in bad weather conditions such as snow, rain, and black ice, the skid resistance performance of skid resistance pavement greatly affects the safety of road traffic and drivers. However, BPT(British Pendulum Tester) has a test area of only 0.009 m2, making it difficult to represent the overall packaging surface. A reliable method of evaluating slip resistance performance is needed for maintaining non-slip packaging. In this study, the conventional BPT test and the skid resistance performance evaluation method of the PFT(Pavement Friction Tester) and µGT(Micro Grip Tester) tests were compared through guidelines and standard investigations and applied to the field skid resistance performance evaluation. In addition, skid resistance pavement with different skid resistance performance was installed at the test-bed and actual road demonstration sites to compare BPN(British Pendulum Number), SN(Skid Number), GN(Grip Number), and to derive correlations for each performance evaluation method. As a result of the experiment, SN and GN showed similar skid resistance performance, and the GN value was derived similar to BPN × 0.01.

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.

A Sudy on the Underground Condition of Road Using 3D-GPR Exploration (3D-GPR탐사를 이용한 도로하부 지반상태에 대한 연구)

  • Lee, Sung-Ho;Jang, Il-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.2
    • /
    • pp.49-58
    • /
    • 2019
  • A study on the analysis of underground ground condition using 3D-GPR exploration was carried out in this paper. The test bed was constructed similar to the field, and the detection analysis was carried out for each depth of cavity and underground burial. Through this, we were able to know the permittivity of the ground by inversion, and we could confirm the depth of detection for the joint by accurate calculation. We confirmed the signal waveforms in the cavity under the road through 3D-GPR exploration, analyzed more quantitatively in subjective and empirical analysis. The subsidence and depth of the subsurface settlement can be observed through 3D-GPR survey, and ground condition change after the ground reinforcement can be confirmed through the exploration section.