• Title/Summary/Keyword: Road Tunnel Management

Search Result 48, Processing Time 0.023 seconds

Development of Environmental Load Estimating Model for Maintaining NATM Tunnel (NATM 터널 유지보수를 위한 환경부하 산정모델 개발)

  • Kim, Daae;Kim, Sangtae;Kim, Kyoungsu;Lee, Juhyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.86-93
    • /
    • 2018
  • Infrastructure which mandatory in human life causes large environmental loads when they are being installed and maintained. Especially, maintenance is performed over a long period of time. Also, there is a limit to suggest a reliable estimated value because environmental loads are changed according to methods of maintenance and periods. In this study, we developed a Environmental Load Estimating Model to evaluate value and plan as soon as possible in the Early Design Phases while maintaining a tunnel. To estimate environmental loads by using brief design information, we analyze a calculation methodology of environmental loads in maintenance phases. Furthermore, we apply periods of maintenance work and maintenance factors considered a characteristic of long-term maintenance. Finally, a main purpose is that this program makes all users estimate environmental loads in maintenance phases easily and quickly. Accordingly, it is considered that the Environmental Load Estimating Model offer assistance to eco-friendly maintenance of the road and tunnel construction.

A fundamental study on the jet fan capacity for smoke control considering thermal buoyancy force in tunnel fires (터널 화재 시 열부력을 고려한 제연용 제트팬 용량산정에 관한 기초 연구)

  • Lee, Ho-Hyung;Choi, Pan-Gyu;Jo, Jong-Bok;Lee, Seung-Chul;Lee, Chang-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.501-511
    • /
    • 2018
  • As a result of the recent revision of the 'Guideline for Installation and Management of Fire Prevention Facility in Road Tunnels', the thermal buoyancy has to be taken into account when calculating the capacity of jet fans for smoke control in tunnel fires. However, there is no detailed methodologies for considering thermal buoyancy, so further study is needed. In this study, the thermal buoyancy in the tunnel is calculated by 3-D numerical simulation to consider the thermal buoyancy in case of fire in tunnels, and the relationship between heat buoyancy and vehicle drag, And the method of calculating the capacity of the jet fan for smoke control in tunnels. According to the analysis results, heat buoyancy acts as a resistance force in the case of a down-slope tunnel, and the pressure rise of jet fan for smoke control is not simply determined by the value of heat buoyancy at the entrance of the tunnel and the value of the vehicle drag at the exit. And it is analyzed that it is necessary to carry out a comprehensive review according to the location of the fire vehicle in tunnels.

Development of Network Level Management System of Road Facilities Based on the Asset Management Concept (자산관리개념을 접목한 네트워크 방식의 도로시설물 유지관리시스템 개발)

  • Ji, Seung Gu;Seo, Jong Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.146-154
    • /
    • 2011
  • Recently, the paradigm of social infrastructure investment has been changed from new construction to maintenance and management. As a consequence, the management and maintenance system of existing highway facilities needed an innovation involving the concept of asset management. This paper discusses the new facility management system suitable to local highway agencies. The new system incorporates asset management concept so that it can analyze the network level facility management solution and it can also improve the budget efficiency for local government. This paper also presents systematic method to integrate various facilities for management system.

Decision Making Methodology on Ventilation System for Road Tunnels Based on Multi-Attribute Utility Theory (다속성 효용이론을 활용한 터널환기방식 선정)

  • Lee, Hye-Jin;Kang, Sang-Hyeok;Park, Won-Young;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.106-115
    • /
    • 2007
  • The size and length of road tunnels have been gradually expanded as industry developed. Consequently, the risk has been increased. The decision making process for ventilation system for road tunnels involves a large amount of information on economic feasibility, construction methods, and safety etc. In situation where systematically structured decision making process is unavailable, almost decisions about ventilation systems are made based on engineers' private knowledge and experiences. Procedure and criteria to choose the best optimized ventilation system among many alternatives are proposed, breaking away from the economic dependency-oriented decision making. This paper presents a Multi-Attribute Utility Theory and AHP based function with which planners can calculate overall utility of each alternative. It is anticipated that the effective use of the proposed methodology for decision making on ventilation systems ould be able to reduce the likelihood of the occurrence of potential safety risks as well as increase the overall ventilation performance.

An Algorithm for Collecting Traffic Information by Vehicle Tracking Method from CCTV Camera Images on the Highway (고속도로변 폐쇄회로 카메라 영상에서 트래킹에 의한 교통정보수집 알고리즘)

  • Lee In Jung;Min Joan Young;Jang Young Sang
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.4
    • /
    • pp.169-179
    • /
    • 2004
  • There are many inductive loop detectors under the highways in Korea. Among the other detectors, some are image detectors. Almost all image detectors are focused one or two lane of the road and are measuring traffic information. This paper proposes to an algorithm for detecting traffic information automatically from CCTV camera images installed on the highway. The information which is counted in one lane or two contains some critical errors by occlusion frequently in case of passing larger vehicles. In this paper, we use a tracking algorithm in which the detection area include all lanes, then the traffic informations are collected from the vehicles individually using difference images in this detection area. This tracking algorithm is better than lane by lane detecting algorithm. The experiment have been conducted two different real road scenes for 20 minutes. For the experiments, the images are provided with CCTV camera which was installed at Kiheung Interchange upstream of Kyongbu highway, and video recording images at Chungkye Tunnel. For image processing, images captured by frame-grabber board 30 frames per second, 640${\times}$480 pixels resolution and 256 gray-levels to reduce the total amount of data to be Interpreted.

  • PDF

Development of Mobile Equipment for Local Risk Factors Detecting of Road Slope (도로사면의 국부적 위험요인 검지를 위한 이동형 장비 개발)

  • Kim, Yong-Soo;Jung, Soo-Jung;Ahn, Sang-Ro
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.938-945
    • /
    • 2008
  • Rockfall and landslide bring about a great social loss with loss of property such as obstruction of traffic and damage of the crops as well as casualty. The purpose of this study is to develop a mobile equipment for local risk factors detecting of road slope. The mobile equipment is designed to receive the sensing data from the measurement sensors, which are installed to detect the dangerous signs from the slopes, as loaded on a vehicle which is moving around to the places where the sensors are installed. In general, more than one mandatory data logger, which is very expensive, must be installed at each slope for the automatic measuring system, but in case of this developmental system, the inexpensive routine measurement can be performed regardless of the number of slopes due to the single unit of information gathering vehicle. This study is going to develop technologies that are expected to be applied to not only slope but also tunnel and bridges which might have the partial risk and need measuring.

  • PDF

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel (개착식 터널 프리캐스트 아치 구조물의 변형 거동 연구)

  • Kim, Hak Joon;Lee, Gyu-Phil;Lim, Chul Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.93-113
    • /
    • 2019
  • The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Standards for Ground Settlement Management when Reinforcing Ground in the Abandoned Mine (폐광지역 지반공사시 지반침하 관리를 위한 기준)

  • Yang, In Jae;Lee, Seung Ah;Baik, Dong Ho
    • Tunnel and Underground Space
    • /
    • v.27 no.5
    • /
    • pp.295-302
    • /
    • 2017
  • In this study, a new quantitative instrumentation and measurement standards applicable to the field of mining has been proposed to improve the problems of the current measurement practices that apply the measuring standards of the civil engineering field (road, railway, etc.). With the data coordination of the mine reclamation corporation, we collected data on ground subsidence in the abandoned mine area, and studied various techniques for establishing a new management reference value based on the manual measurement data measured in the field. As a result, new instrumentation and measurement standards is set up and proposed by using statistics like the average value, the third quartile, the 95% confidence, and the maximum value.

Development and Application of Tunnel Design Automation Technology Using 3D Spatial Information : BIM-Based Design for Namhae Seomyeon - Yeosu Shindeok National Highway Construction (3D 공간정보를 활용한 터널 설계 자동화 기술 개발 및 적용 사례 : 남해 서면-여수 신덕 국도 건설공사 BIM기반 설계를 중심으로)

  • Eunji Jo;Woojin Kim;Kwangyeom Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.209-227
    • /
    • 2023
  • The government continues to announce measures to revitalize smart construction technology based on BIM for productivity innovation in the construction industry. In the design phase, the goal is design automation and optimization by converging BIM Data and other advanced technologies. Accordingly, in the basic design of the Namhae Seomyeon-Yeosu Sindeok National Road Construction Project, a domestic undersea tunnel project, BIM-based design was carried out by developing tunnel design automation technology using 3D spatial information according to the tunnel design process. In order to derive the optimal alignment, more than 10,000 alignment cases were generated in 36hr using the generative design technique and a quantitative evaluation of the objective functions defined by the designer was performed. AI-based ground classification and 3D Geo Model were established to evaluate the economic feasibility and stability of the optimal alignment. AI-based ground classification has improved its precision by performing about 30 types of ground classification per borehole, and in the case of the 3D Geo Model, its utilization can be expected in that it can accumulate ground data added during construction. In the case of 3D blasting design, the optimal charge weight was derived in 5 minutes by reviewing all security objects on the project range on Dynamo, and the design result was visualized in 3D space for intuitive and convenient construction management so that it could be used directly during construction.