• Title/Summary/Keyword: Road Tunnel Fire

Search Result 120, Processing Time 0.023 seconds

A fundamental study on the jet fan capacity for smoke control considering thermal buoyancy force in tunnel fires (터널 화재 시 열부력을 고려한 제연용 제트팬 용량산정에 관한 기초 연구)

  • Lee, Ho-Hyung;Choi, Pan-Gyu;Jo, Jong-Bok;Lee, Seung-Chul;Lee, Chang-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.501-511
    • /
    • 2018
  • As a result of the recent revision of the 'Guideline for Installation and Management of Fire Prevention Facility in Road Tunnels', the thermal buoyancy has to be taken into account when calculating the capacity of jet fans for smoke control in tunnel fires. However, there is no detailed methodologies for considering thermal buoyancy, so further study is needed. In this study, the thermal buoyancy in the tunnel is calculated by 3-D numerical simulation to consider the thermal buoyancy in case of fire in tunnels, and the relationship between heat buoyancy and vehicle drag, And the method of calculating the capacity of the jet fan for smoke control in tunnels. According to the analysis results, heat buoyancy acts as a resistance force in the case of a down-slope tunnel, and the pressure rise of jet fan for smoke control is not simply determined by the value of heat buoyancy at the entrance of the tunnel and the value of the vehicle drag at the exit. And it is analyzed that it is necessary to carry out a comprehensive review according to the location of the fire vehicle in tunnels.

A study on practical use of remote automatic fire extinguishing equipment through test bed in road tunnel (도로터널용 원격 자동소화 설비의 test bed 적용을 통한 실용화 방안 연구)

  • Park, Sang-Heon;An, Sung-Joo;Kim, Jae-Hoon;Kim, Kyung-soo;Yun, Jun-Su;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.837-847
    • /
    • 2019
  • Korea's long underground roads are being promoted around the metropolitan city center to realize advanced transportation networks. Many disaster prevention facilities are applied to secure fire safety of the closed and long-distance underground roads. As the facility response and fire suppression subjects are unclear, additional human and material damages from fire spread are inevitable. Therefore, in this study, we developed a remote automatic fire extinguishing system that uses the fire extinguishing water inside the fire hydrant to monitor the CCTV in the management room and sprays it directly to the fire site through automatic control. The design application method was studied through the performance improvement that can be put into practical use.

A Study on the Standardization of Operation System for Road Tunnels (터널운영시스템 표준화 연구)

  • Kim, Tae-Hyung;Kim, Jin;Keum, Jae-Sung;Tae, Jae-Ho;Kim, Sun-Hong;Hong, Dae-Hie
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

A Study on Smoke Extract Vents in a Subway with Screen door by Evacuation Performance Evaluation through RSET vs. ASET based on Computer Simulations (스크린도어가 설치된 지하철 승강장의 대피안전성 평가를 통한 제연환기구의 방재성능 개선방안 연구)

  • Park, Hyung-Joo;Lee, Young-Jae;Shin, Dong-Cheol;Baek, Dong-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.511-519
    • /
    • 2007
  • This study provides comprehensive design improvements covering technical issues concerning life safety matter In case of fire train stoppage in the middle of a tunnel. Recently Government announced that most of subway platforms will have screen doors in 3 years. Therefore, many fire safety engineers considered that they may contribute on life safety on train stoppage in tunnel. Especially The screen door can protect platform from smoke along tunnel ceiling when fire train stopped in tunnel. The study showed that platform ventilation ducts and the a tunnel ventilation chimney in the middle of tunnel in exiting subway tunnel could not guarantee life safety ability in terms of RSET vs. ASET comparison. Furthermore during evacuation process many peoples may be threatened from the smoke spread from the origin of fire. Although only additional vertical route can be installed in tunnels In order to decrease RSET, it will costs high or no spaces remains in outside on the road. The study suggested that increase of ASET can be best solution without additional escape route, therefore alternative design methods suggested on the base of simulation results. Finally the study shows alternative methods can give good result in terms of evacuation performance evaluation. The evacuation performance evaluation helps the decision-maker to determine the preferred alternatives or upgrades to existing tunnel infrastructure and other measure to meet safety objectives. Finally, the study details the effectiveness of measures the can be taken to reduce the risk of incidents in subway tunnels.

Experimental Studies on PSC Airpit-Slab with Fire Resistance Panel under Static and Dynamic Loads (내화패널이 부착된 프리캐스트 PSC 풍도슬래브의 정적/동적하중에 관한 실험연구)

  • Kim, Tae Kyun;Bae, Jeong;Choi, Heon;Min, In Gi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4A
    • /
    • pp.245-253
    • /
    • 2012
  • In the longway tunnel and underground traffic road, the structure of transverse ventilation system is constructed by the airpit slab. In this study, the full scale specimens of the PSC airpit slab that attached fire resistance panel are performed the static and dynamic loading tests for evaluation of bending capacity. The first of all, it confirmed the evaluations about the fundamental efficiency of the fire resistance panel and PSC slab by the 3-point bending test and pull-off test. The tests are performed for evaluation of the bending resistance under ultimate static load and the bonded capacity under dynamic fatigue load. A fatigue test is performed for an investigation of the effect on wind pressure that is developed by transit of traffic. The damage or debonding on surface between fire resistance panel and PSC slab was not developed in dynamic fatigue load test, also the behavior of the specimens is very stable and the debonding of the fire resistance panel attached at the bottom surface of PSC slab was not developed in static load test, too. Therefore, the crack or debonding of the fire resistance panel will be not developed by external loads during the construction or completion of the precast fire resistance system.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

Water Jet Experiment of Automatic Fire-tracking Water Cannon Facility combined with Indoor Hydrant Facility in Road Tunnels (도로터널의 옥내소화전설비 겸용 자동화점추적 방수총설비의 방수실험)

  • Kim, Chang-Yong;Kong, Ha-Sung
    • Fire Science and Engineering
    • /
    • v.33 no.1
    • /
    • pp.92-98
    • /
    • 2019
  • To determine if water-jet nozzle moves and water jetting are effective according to the location of the fire, this study examined the automatic fire-tracking water cannon system and aan indoor hydrant system, such as water jet centered directivity, water jet range maintainability and water jet shape uniformity. First, an examination to find the center of fire accurately from this system design showed that the water jet centered test was accurate. Second, the water jet range test results showed that when water is jetted at the maximum water jet radius, the water jet shows an inaccurate result but within the allowable tolerance range. Finally, the water-jet shape test result confirmed that there are no problems in setting the block from the algorithm design.

Flow and smoke behavior of a longitudinal ventilation tunnel with various velocities using computational fluid dynamics (팬의 운전조건에 따른 종류식환기터널 내의 연기거동에 관한 전산유체역학연구)

  • Lee, J.H.;Kwon, Y.J.;Kim, D.E.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.1
    • /
    • pp.105-115
    • /
    • 2014
  • A numerical analysis on the smoke behavior and evacuee safety has been performed with computational fluid dynamics. The purpose of this study is to build computational processes for an evacuation and prevention of a fire disaster of a 3 km-length tunnel in Korea. To save computational cost, 1.5 km of the tunnel that can include a few cross-passing tunnels is considered. We are going to assess the fire safety in a road tunnel according to the smoke level, which consists of the smoke density and the height from the floor. The smoke density is obtained in detail from three-dimensional unsteady CFD analysis. To obtain proper temperature distributions on the tunnel wall, one-dimensional conduction equation is considered instead of an adiabatic wall boundary or a constant heat flux. The tunnel considered in this study equips the cross passing tunnels for evacuees every 250 m. The distance is critical in both safety and economy. The more cross passing tunnels, the more safe but the more expensive. Three different jet fan operations can be considered in this study; under- and over-critical velocities for normal traffic condition and 0-velocoty operation for the traffic congestion. The SE (smoke environment) level maps show a smoke environment and an evacuating behavior every moment.

A numerical study on effects of drag coefficient of vehicle on jet fans in case of fire in road tunnels (도로터널 화재시 차량의 항력계수가 제연용 제연팬에 미치는 영향에 대한 해석적 연구)

  • Yoo, Yong-Ho;Yoo, Ji-Oh;Kim, Hyo Gyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.553-560
    • /
    • 2014
  • The road tunnel install a vent for the purpose of ventilation and smoke control. Ventilation equipment capacity(number of jet fans) depends on from the condition that of the pressure and ventilation resistance. Pressure and the resistance under operating vehicle have affected on the drag coefficient. The drag coefficient of the tunnel have affected by the blockage effect and slipstream effects. However, when calculating the ventilation fan, are not properly consider taking into account such effects. Therefore, ventilation force may have been slightly overestimated. This paper describes the drag coefficient through a numerical analysis to calculate the equivalent resistance area that reflects the vehicle distance, and examined the equivalent resistance area. The ventilation coefficient corresponding to the result heavy vehicle mixing ratio of the present study was not clear. Equivalent resistance area had reduced by about 86% compared to the road design handbook current standards. Also it had analyzed and reduced to 62.2% compared to Korea Highway Corporation ventilation design criteria ratio, which is the old standard.

A Study on the Development of Model and Application Case of Water Screen Effect for Fire Behavior Simulation in Road Tunnel (도로터널 화재성상 시뮬레이션을 위한 워터스크린 효과 모델개발 및 적용사례)

  • Han, Jung-Chul;Kim, Se-Jong;Kim, Dong-Eun;Kurioka, Hitishi;Ootuki, Masato;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.83-88
    • /
    • 2011
  • 워터스크린(이하 W/S)에 의한 화재방화시스템은 도로터널에 화재가 발생시, 공간에 수막을 사용하여 구획화하고, 열 연기의 확산을 억제하며 유해 부유입자를 세정함으로서 인간의 안전을 확보 및 구조물의 피해를 극소화 하는 시스템이다. 이 W/S에 의한 구획의 성능을 평가하기 위해, 1/2의 터널 모형에 의한 공간 내 열 성장 파악을 위한 화재 실험을 분석하였고, 그 결과, 천정 근방 온도 및 방사수열량으로서는 발열 속도의 크기, 풍속의 대소에 의하지 않고 약 80%의 저감율을 나타냈다. 또, 발생한 유해 부유입자 농도에 대해서는 약 60%, 화원 성질과 상태로서 발열 속도는 약30%의 W/S에 의한 저감 효과를 나타내었다.

  • PDF