• Title/Summary/Keyword: Road Network

Search Result 968, Processing Time 0.031 seconds

Geometric Analysis of Fracture System and Suggestion of a Modified RMR on Volcanic Rocks in the Vicinity of Ilgwang Fault (일광단층 인근 화산암 암반사면의 단열계 기하 분석 및 암반 분류 수정안 제시)

  • Chang, Tae-Woo;Lee, Hyeon-Woo;Chae, Byung-Gon;Seo, Yong-Seok;Cho, Yong-Chan
    • The Journal of Engineering Geology
    • /
    • v.17 no.3
    • /
    • pp.483-494
    • /
    • 2007
  • The properties of fracture system on road-cut slopes along the Busan-Ulsan express way under construction are investigated and analyzed. Fracture spacing distributions show log-normal form with extension fractures and negative exponential form with shear fractures. Straight line segments in log-log plots of cumulative fracture length indicate a power-law scaling with exponents of -1.13 in site 1, -1.01 in site 2 and -1.52 in site 3. It is likely that the stability and strength of rock mass are the lowest in site 1 as judged from the analyses of spacing, density and inter-section of fractures in three sites. In contrast, the highest efficiency of the fracture network for conducting fluid flow is seen in site 3 where the largest cluster occupies 73% through the window map. Based on the field survey data, this study modified weighting values of the RMR system using a multiple regression analysis method. The analysis result suggests a modified weighting values of the RMR parameters as follows; 18 for the intact strength of rock; 61 for RQD; 2 for spacing of discontinuities; 2 for the condition of discontinuities; and 17 for ground water.

A Study on the Comparison of Air Pollutants Emissions according to Three Averaging Methods of Vehicular Travel Speed (자동차 평균통행속도 적용방식에 따른 대기오염 배출량 비교 연구)

  • Cho Kyu-Tak
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.21 no.4
    • /
    • pp.401-411
    • /
    • 2005
  • This study was conducted to develop a method to be able to estimate the vehicular emissions according to spatial scales-Seoul province, 25 counties and hundreds of grids $(1km{\times}1km)$. First, the emissions at each spatial scale was calculated by using the road network and the travel volume and speed of each link modeled by travel demand model (TDM). Second, the emission at each spatial scale was calculated on the basis of average speeds estimated by using three kinds of averaging method. These are called the provincial, volume-delay function (VDF) and zonal method, respectively. Third, three kinds of emissions and those by TDM are compared each other at three spatial scales. In Seoul (provincial scale), three kinds of emissions are less than those by TDM, but the differences of TDM from three speed averaging methods (SAMs) are small. The relative ratios of three SAMs to TDM are $88\~90\%\;in\;CO,\;99\~100\%\;in\;NOx,\;84\~85\%$ in VOCs. At county scale, NOx among three pollutants showed the highest correlation between TDM and three SAMs and the zonal method among three SAMs was proven to be the highest correlation with TDM. NOx showed the coefficients $(R^2)$ greater than 0.9 in all three SAMs but CO and VOC showed the coefficients $(R^2)$ greater than 0.9 in only zonal method. Slopes of co..elations of all pollutants showed the values close to '1' in zonal method. In the other two SAMs, slopes of NOx showed the values close to '1', but those of CO and VOC showed the values less than 0.85. At grid scale, correlations between TDM and three SAMs were not high. CO showed $0.68\~0.77\;in\;R^2s\;and\;58\~0.68$ in slopes. NOx showed $0.90\~0.94\;in\;R^2s\;and\;0.86\~0.94$ in slopes. VOC showed $0.56\~0.70\;in\;R^2s\;and\;0.48\~0.57$ in slopes. There are not high correlations between TDM and three SAMs in grid scale. This study showed that there is the most suitable method for calculating the average travel speed at each spatial scale and it is thought that the zonal method is more suitable than the VDF or provincial method.

An Analysis on the Situation of Forestry Mechanization in the Production and Supply of Timber (목재생산 및 공급에서 임업기계화의 현황 분석)

  • Kim, Jae-Hwan;Mun, Ho-Seong;Han, Sang-Yoel;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.607-614
    • /
    • 2015
  • This study aims to analyze the current status of timber production operation and the effects of the forestry mechanization projects on timber production. In order to increase the domestic timber production, it is necessary to propel forestry mechanization project, improve policy and institution, broaden forest-road network, enlarge the number of forest workers, enhance timber production and supply system, provide forestry machines, establish forest operation system, and train forest workers. In addition, the reestablishment of policy goals, the consistency of policy, and the rearrangement of laws and institution are considered more important. To improve the results and effects of forestry mechanization project, it is necessary to drive of forestry mechanization project, the spread of forestry machines, the cultivation of trainer ability, the development of training materials, and the teaching of field skill. In order to meet timber buyersí preference, timber needs to be produced through whole tree logging operation system. Expanding the proportion of domestic timber among total timber demand in Korea requires price competitiveness, and the supply ability of high quality product from the perspective of length and width.

CCTV-Aided Accident Detection System on Four Lane Highway with Calogero-Moser System (칼로게로 모제 시스템을 활용한 4차선 도로의 사고검지 폐쇄회로 카메라 시스템)

  • Lee, In Jeong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.3
    • /
    • pp.255-263
    • /
    • 2014
  • Today, a number of CCTV on the highway is to observe the flow of traffics. There have been a number of studies where traffic data (e.g., the speed of vehicles and the amount of traffic on the road) are transferred back to the centralized server so that an appropriate action can be taken. This paper introduces a system that detects the changes of traffic flows caused by an accident or unexpected stopping (i.e., vehicle remains idle) by monitoring each lane separately. The traffic flows of each lane are level spacing curve that shows Wigner distribution for location vector. Applying calogero-moser system and Hamiltonian system, probability equation for each level-spacing curve is derived. The high level of modification of the signal means that the lane is in accident situation. This is different from previous studies in that it does more than looking for the signal from only one lane, now it is able to detect an accident in entire flow of traffic. In process of monitoring traffic flow of each lane, when camera recognizes a shadow of vehicle as a vehicle, it will affect the accident detecting capability. To prevent this from happening, the study introduces how to get rid of such shadow. The system using Basian network method is being compared for capability evaluation of the system of the study. As a result, the system of the study appeared to be better in performance in detecting the modification of traffic flow caused by idle vehicle.

Study on the Methodology for Extracting Information from SNS Using a Sentiment Analysis (SNS 감성분석을 이용한 정보 추출 방법론에 관한 연구)

  • Hong, Doopyo;Jeong, Harim;Park, Sangmin;Han, Eum;Kim, Honghoi;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.141-155
    • /
    • 2017
  • As the use of SNS becomes more active, many people are posting their thoughts about specific events in their SNS in the form of text. As a result, SNS is used in various fields such as finance and distribution to conduct service satisfaction surveys and consumer monitoring. However, in the transportation area, there are not enough cases to utilize unstructured data analysis such as emotional analysis. In this study, we developed an emotional analysis methodology that can be used in transportation by using highway VOC data, which is atypical data collected by Korea Expressway Corporation. The developed methodology consists of morpheme analysis, emotional dictionary construction, and emotional discrimination of the collected unstructured data. The developed methodology was verified using highway related tweet data. As a result of the analysis, it can be guessed that many information and information about the construction and the accident were related to the highway during the analysis period. Also, it seems that users complain about the delay caused by construction and accident.

Railway Governance and Power Structure in China

  • Lee, Jinjing
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.129-133
    • /
    • 2008
  • Over the last $15{\sim}20$years, many countries have adopted policies of railway privatization to keep up with increasing competition from road and air transport. Although each country and case has its own history, market characteristics, political context as well as administrative process, railway privatizations (including railway restructure, concession etc.) in the west usually are accompanied with the establishment of new regulatory regimes. Therefore, railway governance has been innovating towards an interaction of government, regulator, industry bodies, user groups, trade unions and other interested groups within the regulatory framework. However, it is not the case in China. Although China had seen a partial privatization in some branch lines and is experiencing a much larger-scale privatization by establishing joint-ventures to build and operate high-speed passenger lines and implementing an asset-based securitization program, administrative control still occupies absolutely dominant position in the railway governance in China. Ministry of Railway (MOR) acts as the administrator, operator as well as regulator. There is no national policy that clearly positions railway in the transportation network and clarifies the role of government in railway development. There is also little participation from interested groups in the railway policy making, pricing, service standard or safety matter. Railway in China is solely governed by the mere executive agency. Efficiency-focused economic perspective explanation is far from satisfaction. A wider research perspective from political and social regime is of great potential to better explain and solve the problem. In the west, separation and constrains of power had long been established as a fundamental rule. In addition to internal separation of political power(legislation, execution and jurisdiction), rise of corporation in the 19th century and association revolution in the 20th century greatly fostered the growth of economic and social power. Therefore, political, social and economic organizations cooperate and compete with each other, which leads to a balanced and resonable power structure. While in China, political power, mainly party-controlled administrative power has been keeping a dominated position since the time of plan economy. Although the economic reform promoted the growth of economic power of enterprises, it is still not strong enough to compete with political power. Furthermore, under rigid political control, social organizations usually are affiliated to government, independent social power is still too weak to function. So, duo to the limited and slow reform in political and social regime in China, there is an unbalanced power structure within which political power is dominant, economic power expanding while social power still absent. Totally different power structure in China determines the fundamental institutional environment of her railway privatization and governance. It is expected that the exploration of who act behind railway governance and their acting strength (a power theory) will present us a better picture of railway governance as a relevant transportation mode. The paper first examines the railway governance in China and preliminarily establishes a linkage between railway governance and its fundamental institutional environment, i.e. power structure in a specific country. Secondly, the reason why there is no national policy in China is explored in the view of political power. In China, legislative power is more symbolic while party-controlled administrative power dominates political process and plays a fundamental role in Chinese railway governance. And then, in the part three railway finance reform is analyzed in the view of economic power, esp. the relationship of political power and economic power.

  • PDF

On the Street System of Natural Villages in Seogwipo, Jeju (서귀포시 자연취락지의 도시가로망 구성)

  • 전명택;양성기
    • Journal of Environmental Science International
    • /
    • v.11 no.3
    • /
    • pp.139-148
    • /
    • 2002
  • When the natural villages in Jeju province are incorporated into the district of city planning, they are considered to be a small-scale residential districts. Therefore, a garden city should be planned that considers the characteristics of the villages to implement an appropriate street system, to use the area effectively, and to harmonize the villages with the surrounding communities. There have been an especially large number of problems with the street system in the city of Seogwipo, which was notified as the area of natural settlement. This study analyzes the problems inherent in street planning and the present condition of roads whose construction has been postponed for a long time due to several problems including an inappropriately planned street system. Based on the research of various documents, a practical street system has been investigated. Most of the residents in natural settlement units demand use of the continued the existing roads as well as the implementation of an effective street system. They ask for street planning under which the involved construction would take only a short period of time and would result in only minimal damage to their existing properties. Therefore, the street system should be planned so as to preserve the nature-friendly features of natural settlements, their surroundings and tourism resources. Even after streets hwve been planned and their completion you has been established, the plan should be continuously evaluated, analyzed and compared with other alternatives. The street plan should continuously incorporate improvement measures which would satisfy various aspects of the street system including land use, traffic demand, and future population demands. Both the amount of money to be invested and economical efficiency should be considered for street planning since the street system has a great impact on many industries. Unnecessary costs related to excessive road construction should be avoided. The street network plan should also include the complete evaluation of the natural topography as well as the surrounding. Considering these views, the data concerning the current condition of the city and the related investigation play an important role in establishing a street plan. However, the investigation of future construction plans by the city is as of yet at a very early stage. Therefore, there is an urgent need for the investigational study of the current city development plans. The street system for the natural settlement area should be established only after the thorough investigation of all aspects of street planning. In addition, the plan should be flexible enough to consider the characteristics of Jeju.

The Mechanical Behavior of Jointed Rock Masses by Using PFC2D (PFC2D를 이용한 절리암반의 역학적 물성 평가연구)

  • Park Eui-Seob;Ryu Chang-Ha
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.119-128
    • /
    • 2005
  • Although the evaluation of the mechanical properties and behavior of jointed rock masses is very important for the design of tunnel and underground openings, it has always been considered the most difficult problem. One of the difficulties in describing the rock mass behavior is the selection of the appropriate constitutive model. This limitation may be overcome with the progress in discrete element software such as PFC, which does not need the user to prescribe a constitutive model for rock mass. In this paper, a 30\;m\;\times\;30\;m\;\times\;30\;m m jointed rock mass of road tunnel site was analyzed. h discrete fracture network was developed from the joint geometry obtained from core logging and surface survey. Using the discontinuities geometry from the DFN model, PFC simulations were carried out, starting with the intact rock and systematically adding the joints and the stress-strain response was recorded for each case. With the stress-strain response curves, the mechanical properties of jointed rock masses were determined. As expected, the presence of joints had a pronounced effect on mechanical properties of the rock mass. More importantly, getting the mechanical response of the PFC model doesn't require a user specified constitutive model.

Evaluating Value of Information on Bus-Route Concerning on the User's Individual Value (이용자 개인의 버스 환승 노선정보의 이용가치 평가)

  • Park, Yong-Jin;Kang, Sin-Hwa
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.6
    • /
    • pp.89-99
    • /
    • 2004
  • The purpose of this study is to evaluate the value of information on Bus-Route concerning on the User's Individual value. The value of information is estimated with the price of time saving by using the information. The price of unit time for each user is applied to convert the saving time to the cost. To estimate the user's expense from origin to destination the previous model is modified. Bus-travel cost is estimated with variables such as bus-travel time, bus-interval, bus-fare, and the price of walking distance. In this study, to estimate in-vehicle time the bus-travel time model is developed based on the spatial characteristics distinguished by three types of circular-road in the network of Daegu Metropolitan area. For the case study, a set of the origin and destination is selected as Dalsu-gu District Office and East Daegu Train Station respectively. There are several bus-routes which can be used as direct or transferable bus-routes selected. The study showed that when the value of time for individual users is \1,738/hr, there is no benefit to using information of transferable bus-routes. It also showed that the more discount rates of bus fare is increased, the benefit to using information of transferable bus-routes is increased, and that the lower value of time is, the benefit to using information of transferable bus-routes is increased.

Impacts of Land Use and Urban Design Characteristics on Transit Ridership in the Seoul Rail Station Areas (서울시 역세권에서의 토지이용 및 도시설계특성이 대중교통이용증대에 미치는 영향 분석)

  • Sung, Hyung-Gon;Kim, Dong-Jun;Park, Jee-Hyung
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.135-147
    • /
    • 2008
  • One of the efforts both to prevent urban sprawling development patterns and to promote use of public transportation is known as Transit-Oriented Development (TOD), including such planning elements as the density and diversity of land use and pedestrian-friendly urban design around a transit center. The aim of this study is thus to conduct impact analyses of TOD planning elements on transit ridership in the Seoul rail station areas. First, the authors investigate and draw out various actual elements of TOD planning by using GIS-based data and Smart Card data. Then the authors analyze impacts of TOD planning elements on transit ridership for the Seoul rail station areas. After condensing 34 variables presumably influencing transit ridership into seven factors by using factor analyses, the study utilizes multiple regression modeling methods to identify their impacts on transit ridership. The analysis results demonstrate that transit ridership tends to increase more in rail station areas where there is a non-residential high density, mixed use of land and narrow and small-size road network patterns. The implementation of TODs should be a useful method in inducing a Transit-Oriented City through redevelopment and new development.