• Title/Summary/Keyword: Riverbed dredging

Search Result 14, Processing Time 0.01 seconds

Hazard Evaluation of Levee by Two-Dimensional Hydraulic Analysis (2차원 수리해석에 의한 하천 제방 위험도 평가분석)

  • Park, Jun Hyung;Kim, Tae Hyung;Han, Kun Yeun
    • Journal of Wetlands Research
    • /
    • v.18 no.1
    • /
    • pp.45-57
    • /
    • 2016
  • Levee safety is being evaluated using one of the several failure causes including overtopping, infiltration and erosion or 1D hydraulic analysis considering physical characteristics of levee in practical engineering works. However, mentioned evaluation methods are not able to consider various failure causes of levee at the same time and to get reliable results where requires the accurate topographic information. This study proposed the flood hazard index which is able to consider several hazard factors involving overtopping, infiltration and erosion risk simultaneously. The index was generated from results of 2D hydraulic analysis reflecting accurate topographic information. The study areas are the confluences of the Nakdong River and two streams(Gamcheon and Hoecheon). Levee safety was evaluated using results based on 2D hydraulic analysis considering riverbed changes of before and after dredging work in the study area. This study will contribute to estimate the reliable safety evaluation of levee where may have hazards during extreme flood events.

Analysis on the sediment sluicing efficiency by variation of operation water surface elevation at flood season (홍수기 운영수위 변화에 따른 배사 효율 분석)

  • Jeong, Anchul;Kim, Seongwon;Kim, Minseok;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.12
    • /
    • pp.971-980
    • /
    • 2016
  • In general, efficient operation of sediment sluicing is important in economical aspect. In this study, the efficiency of sediment sluicing by various operation at water surface elevation on multi-functional weirs were analyzed using Nays2DH, and we focused on the Dalsung weir at Nakdong river. The results of this study shows that, the same number of flushing channels and water gates were developed due to sediment sluicing, and sediment deposition occurred in upstream region of flushing channels. Also, the sediment sluicing efficiency increased by approximately 4.6% and sedimentation decreased by approximately 4.5% at EL. 14.5 m for operations on water surface elevation exceeding EL. 14.0 m. The mitigation of reservoir sedimentation and extension of maintenance dredging period are possible if the variation of sediment sluicing efficiency in various operation at water surface elevation during flood season are considered.

A Study on morphological characteristics of large river channel based on bathymetry and near-river survey (하천측량을 통한 대하천 유로의 형태학적 특성에 관한 연구)

  • Ko, Joo Suk;Kwak, Sunghyun;Lee, Kyungsu;Lyu, Siwan
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.2
    • /
    • pp.163-172
    • /
    • 2019
  • The linear and cross-sectional shapes of the natural river channel are subjected to continuous changes in time and space due to the interaction with the flow of water and sediment transport. This study aims to investigate the morphological characteristics and change patterns of river channel quantitatively for the middle reach of Nakdong River, which has undergone large scale riverbed dredging and construction work, as Four Major River Restoration Project. A series of bathymetry and near-river survey has been conducted to obtain the detailed terrain information for the study area. The properties related to the linear and cross-sectional characteristics of river channel have been calculated based on the filed survey data and analyzed with comparing the survey data obtained in 2012 for the project completion. Since there has not been enough time for meaningful terrain change to take place, it was not possible to extract special tendency in the degree and aspect of terrain change. However, it is necessary to make regular examinations to the patterns and degree of river channel change using the proposed methodology.

A Study on the Installation of Groyne using Critical Movement Velocity and Limiting Tractive Force (이동한계유속과 한계소류력을 활용한 수제 설치에 관한 연구)

  • Kim, Yeong Sik;Park, Shang Ho;An, Ik Tae;Choo, Yeon Moon
    • Journal of Wetlands Research
    • /
    • v.22 no.3
    • /
    • pp.194-199
    • /
    • 2020
  • Unlike in the past, the world is facing water shortages due to climate change and difficulties in simultaneously managing the risks of flooding. The Four Major Rivers project was carried out with the aim of realizing a powerful nation of water by managing water resources and fostering the water industry, and the construction period was relatively short compared to the unprecedented scale. Therefore, the prediction and analysis of how the river environment changes after the Four Major Rivers Project is insufficient. Currently, part of the construction section of the Four Major Rivers Project is caused by repeated erosion and sedimentation due to the effects of sandification caused by large dredging and flood-time reservoirs, and the head erosion of the tributaries occurs. In order to solve these problems, the riverbed maintenance work was installed, but it resulted in erosion of both sides of the river and the development of new approaches and techniques to keep the river bed stable, such as erosion and excessive sedimentation, is required. The water agent plays a role of securing a certain depth of water for the main stream by concentrating the flow so much in the center and preventing levee erosion by controlling the flow direction and flow velocity. In addition, Groyne products provide various ecological environments by forming a natural form of riverbeds by inducing local erosion and deposition in addition to the protection functions of the river bank and embankment. Therefore, after reviewing the method of determining the shape of the Groyne structure currently in use by utilizing the mobile limit flow rate and marginal reflux force, a new Critical Movement Velocity(${\bar{U}}_d$) and a new resistance coefficient formula considering the mathematical factors applicable to the actual domestic stream were developed and the measures applicable to Groyne installation were proposed.