• Title/Summary/Keyword: River Plan

Search Result 530, Processing Time 0.022 seconds

Uncertainty of Evaluating Design Flood and Mitigation Plan at Downstream of Imjin River (감조하천 홍수위 계산의 불확실성과 저감 대안 - 임진강 하류를 대상으로)

  • Baek, Kyong Oh;Kwon, Hyek Won
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.132-137
    • /
    • 2018
  • Compared with general rivers, fluctuations of the water level and the river bed are severe in the tidal river. In hydro-dynamic aspect, such fluctuation gives different river-bed data to us according to observing period. The time-dependent river-bed data and pre-estimation of the Manning's roughness coefficient which is the key factor of numerical modelling induces uncertainty of evaluating the design flood level. Thus it is necessary to pay more attention to calculate the flood level at tidal rivers than at general rivers. In this study, downstream of the Imjin River where is affected by tide of the West Sea selected as a study site. From the numerical modelling, it was shown that the unsteady simulation gave considerable mitigation of the water level from the starting point to 15 km upstream compared to the steady simulation. Either making a detention pond or optional dredging was not effective to mitigate the flood level at Gugok - Majung region where is located in the downstream of the Imjin River. Therefore, a more sophisticated approach is required to evaluate the design flood level estimation before constructive measures adopted in general rivers when establishing the flood control plan in a tidal river.

A Study on the Exterior Color Palette of the Apartment Buildings around Han River in Seoul for Environmental Color Plan (환경색채계획을 위한 서울시 한강변 아파트 외장 색채팔레트에 관한 연구)

  • 최희승;박영순
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2002.04a
    • /
    • pp.154-158
    • /
    • 2002
  • The object of this study is to find out our present exterior color palette of the apartment buildings by Han River, which represents the visual image of Seoul, to reveal how well it is harmonized with its surroundings along with the last 10 years researches, and to compare its correspondence with the city plan of Seoul. Furthermore, it is the ultimate purpose to prepare source materials for desirable color plan of the city.

  • PDF

Prediction of River-bed Change Using River Channel Characteristics and A Numerical Model (하도특성량과 수치모형에 의한 하상변동 예측)

  • Yoon, Yeo Seung;Ahn, Kyeong Soo
    • Journal of Wetlands Research
    • /
    • v.9 no.3
    • /
    • pp.51-61
    • /
    • 2007
  • In natural river, river-bed change is greatly influenced by the various factors such as river improvement, change of watershed land use, construction of dam and reservoir, gravel mining, and so on. The knowledge about river-bed change in the river is essential in the river modification, wetlands plan, and maintaining stable alluvial rivers. In this study, river-bed change in the future was predicted by investigating river channel characteristics which play dominant role in the formation of channel and based on the numerical model through river survey and the grain size analysis. The Proposed investigation and model was applied to the Geum river and the Miho stream which have been experienced river degradation due to river aggregate dredging and now seams to be stable. The result of potential river-bed change which was estimated by investigating channel characteristic including slope of channel, friction velocity, and so on is similar to that which was estimated based on the numerical model. It was found that the Geum river and the Miho stream will be stable. In the future, if considering the characteristics of river channel which is estimated by the river-bed scour, sediment, and so on, it is possible that river improvement and wetland restoration plan are established stably and naturally.

  • PDF

A Study on the Floodplain Management Plan due to Inundation of Nakdong River Basin (낙동강유역 침수범람에 따른 홍수터관리 방안 연구)

  • Seo, Kyu-Woo
    • Journal of Wetlands Research
    • /
    • v.4 no.2
    • /
    • pp.57-66
    • /
    • 2002
  • The local storm occurred Nakdong river basin from August 4 to 11 of the year 2002, resulting in a record 500-600mm rainfall. The heavy rain continued for more than 10 days and especially between 3 to 4 am of August 9, 50mm per hour local storm occurred in Hanrim-myun area, Kimhae. 8 days after the storm, the water level of Nakdong river rose rapidly and the river flowed backward the branches. T he draining of the protected low wetland was unable and the water level of the inner bank area rose suddenly, causing the inundation in several areas. Baeksan bank of Nam river, Gahyun(Samhak) bank of Hwang river, and Kwangam bank of Shinban river, where the draining facilities were under construction or constructed recently, were failed by the piping around the draining culvert. This study analyze the cause of the damage in Nakdong river banks and suggests the countermeasures for future improvement. The damaged spot of the river bank was surveyed, and the rainfall and the fluctuation in the water levels were reviewed. Finally for the flood inundation prevention at the inner bank area, new floodplain management plan as the protect of low wetland established.

  • PDF

RAUT: An end-to-end tool for automated parsing and uploading river cross-sectional survey in AutoCAD format to river information system for supporting HEC-RAS operation (하천정비기본계획 CAD 형식 단면 측량자료 자동 추출 및 하천공간 데이터베이스 업로딩과 HEC-RAS 지원을 위한 RAUT 툴 개발)

  • Kim, Kyungdong;Kim, Dongsu;You, Hojun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1339-1348
    • /
    • 2021
  • In accordance with the River Law, the basic river maintenance plan is established every 5-10 years with a considerable national budget for domestic rivers, and various river surveys such as the river section required for HEC-RAS simulation for flood level calculation are being conducted. However, river survey data are provided only in the form of a pdf report to the River Management Geographic Information System (RIMGIS), and the original data are distributedly owned by designers who performed the river maintenance plan in CAD format. It is a situation that the usability for other purposes is considerably lowered. In addition, when using surveyed CAD-type cross-sectional data for HEC-RAS, tools such as 'Dream' are used, but the reality is that time and cost are almost as close as manual work. In this study, RAUT (River Information Auto Upload Tool), a tool that can solve these problems, was developed. First, the RAUT tool attempted to automate the complicated steps of manually inputting CAD survey data and simulating the input data of the HEC-RAS one-dimensional model used in establishing the basic river plan in practice. Second, it is possible to directly read CAD survey data, which is river spatial information, and automatically upload it to the river spatial information DB based on the standard data model (ArcRiver), enabling the management of river survey data in the river maintenance plan at the national level. In other words, if RIMGIS uses a tool such as RAUT, it will be able to systematically manage national river survey data such as river section. The developed RAUT reads the river spatial information CAD data of the river maintenance master plan targeting the Jeju-do agar basin, builds it into a mySQL-based spatial DB, and automatically generates topographic data for HEC-RAS one-dimensional simulation from the built DB. A pilot process was implemented.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Effect of Climate Change on Water Quality in Seonakdong River Experimental Catchment (기후변화에 따른 서낙동강 시험유역에서의 수질영향 분석)

  • Kang, Ji Yoon;Kim, Jung Min;Kim, Young Do;Kang, Boo Sik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.2
    • /
    • pp.197-206
    • /
    • 2013
  • Recently, climate change causes climatic anomaly such as global warming, the typhoon and severe rain storm etc. and it brings damage frequently. Climate change and global warming are prevalent all over the world in this century and many researchers including hydrologists have studied on the climate change. In this study, Seonakdong river watershed in the Nakdong river basin was selected as a study area. Real-time monitoring system was used to draw the rating curves, which has 0.78 to 0.96 of $R^2$. To predict runoff change in Seonakdong river watershed caused by climate change, the change in hydrologic runoff were predicted using the watershed model, SWAT. As a result, the runoff from the Seonakdong river watershed was increased by up to 45 % in summer. Because of the non-point sources from the farmland and the urban area, the water quality will be affected by the climate change. In this study, the operating plan of the water gates in Seonakdong river will be suggested by considering the characteristics of the watershed runoff due to the climate change. The optimal watergate opening plan will solve the water pollution problems in the reservoir-like river.

Estimation of Available Permit Water for Considering the Evaporation of Multipurpose Dams in Nakdong River Basin (증발량을 고려한 낙동강유역 다목적댐의 가용허가수량 추정)

  • Kim, Sun Joo;Park, Ki Chun;Park, Hee Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.3
    • /
    • pp.1-7
    • /
    • 2013
  • The dam plan quantity of constructive and water supply quantity of present time are showing a difference with change in climate and augmentation of water demand for multipurpose dams in Nakdong river basin. But revaluates a water supply ability the method or the process is official for is not taking a position, so actual condition applies the plan quantity of dam constructive. Considers various situation of actual multipurpose dam from research sees consequently and in K-WEAP is an integrated water resources evaluation plan model applies as water permit availability multipurpose dam, currently water permit availability comparison, analyzed. In this study, the natural daily flow data and apply the dimensions of the reservoir, and for more than 30 years of the long-term water balance analysis conducted by Date Nakdong river basin can supply reservoirs are large quantity of permits available is presented.

Plan for Flood Control Linked with Dam and River Basin (댐과 하천유역을 연계한 홍수 대응 방안 - 2020년 섬진강 홍수사상을 대상으로 -)

  • Kyong Oh Baek;Dong Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.81-86
    • /
    • 2023
  • In this study, a one-dimensional numerical model was constructed to propose a flood control plan linked with the dam and river basin for the flood events of the Seomjin River in 2020. The flood level reduction of the downstream river was tested based on a scenario operation of the Seomjingang Dam and was also analyzed when a storage pocket was newly constructed as one of the river basin measures. It was confirmed that Seomjingang Dam's flood control capacity would be increased if the flood limit level was drastically lowered from the current EL. 196.5 m to EL. 188.0 m. In addition, if the upper area of the (old) Geumgok Bridge (which suffered great damage due to the loss of the levee) is used as a storage pocket, it would be effective in preventing floods in the lower area of it. In the era of the climate crisis, more integrated flood management is needed and basic river management must be observed.