• Title/Summary/Keyword: River Management Plan

Search Result 214, Processing Time 0.028 seconds

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

Review and Discussion on Policy and Legal System for River Environments Management in Korea (국가 하천환경관리 체계의 검토와 고찰)

  • Chun, Seung-Hoon
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.6
    • /
    • pp.431-444
    • /
    • 2017
  • This study was carried out to review the guidelines being used by law and national policy concerned on river environments management and suggest the applicability of newly developed river environment assessment system. In the current legal system, the national river environment management system is insufficient in securing an independent status in the legal institutional system which is separated to the Ministry of Land, Transport and Infrastructure and the Ministry of Environment. And the river environment assessment system of the national standard, which is a core matter, has not been established yet. In particular, there is a lack of integrated approach between the upper and lower plan or related plans on water resources, water quality, river environment and aquatic ecosystem management. In addition, the consistency and effectiveness as the process of planning and design according to the current status and comprehensive analysis and evaluation of the river environment were not secured either. To integrate national river environment management system and improve efficiency, I proposed the establishment of hierarchy and connection between national river plans, and the adoption and application of developed assessment system based on characteristics of river environment in Korea. Finally, I proposed the separated application with dividing the developed assessment system including the naturalness of river environment and suitability of water friendly activity into both assessment method for management plan of water resources of river basins & basic river plan respectively.

Policy case study for urban waterfront regeneration -Focused on Han River management foundation plan and London Thames gateway regeneration project- (도시 수변공간 재생을 위한 정책 사례연구 -한강변 관리 기본계획과 런던 템즈 게이트웨이 광역 재생사업을 중심으로-)

  • Hong, Soon-Jai;Kim, Seung-In
    • Journal of Digital Convergence
    • /
    • v.14 no.8
    • /
    • pp.479-485
    • /
    • 2016
  • In 2007, London Thames Gateway delivery plan was started, and it was in progress to solve climate change, population density, housing problems, green space, regional imbalances, and transportation issues from east London and Kent to Essex. The plan was carried out faithfully local autonomy enlargement of local governments. This case is evaluated as a successful case of waterfront regeneration with well balanced on development and conservation. This study concludes as follows by comparing with this case and a new Han River management foundation plan. First, Seoul's new plan needs to change to diffuse thinking on comprehensively understanding. Second, local and central government, which are adjacent to Han River, need management scheme in cooperation. Third, the countermeasures for solving traffic problems in Seoul are required through the provision of transportation method to take advantage of the waterfront.

A Study on the Landscape Change and Management Plan for Seomjin River Chimsil Wetland through Aerial Photograph and Sediment Analysis (항공사진 및 퇴적물 분석을 통한 섬진강 침실습지 경관변화와 관리방안)

  • Lee, Seong-Ho;JANG, Dong-Ho
    • Journal of The Geomorphological Association of Korea
    • /
    • v.27 no.3
    • /
    • pp.25-39
    • /
    • 2020
  • This study analyzed the management plan of Seomjin River Chimsil Wetland by identifying landscape changes through aerial photographs analysis and concentrations of sedimentation. Geophysical Landscape Change Analysis showed that vegetation accounts for more than half of the total area. The Barren land and water body was somewhere repeatedly increased and decreased and made an irregular form in the study area. The soil was acidic, and no eurtophication was shown, but it was potential to form wetland. In addition, the research area has been terrestrification of sand bar for a long period of time, forming a soil layer. Although the characteristics of river deposits were shown in the study area, the grain size was a particulate matter, and the sorting was 'very poorly sorted'. In some areas of Seomjin River Chimsil Wetland, sand bars were formed, but most areas were undergoing to terrestrification. Therefore, in order to preserve the riverine area and to serve by a bridge between the land ecosystem and the underwater ecosystem, it is very necessary to remove some vegetation, create a proper waterway, and restore the wetland.

Balancing Multiple Needs in Conflicts for an Urbanized River Basin

  • Yoshitani, Junichi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.53-57
    • /
    • 2007
  • Tsurumi River Basin successfully started to prepare a Water Master Plan though a series of discussions by gathering all stakeholders in a hall. It began with setting five management targets namely, flood, low flow, natural environment, emergency use, and recreational use, followed by setting management goals by target as well as a one-sentence catchphrase for the Water Master Plan using a bottom-up approach. The author reviews this process and discusses the background of the success.

  • PDF

A Study on the Floodplain Management Plan due to Inundation of Nakdong River Basin (낙동강유역 침수범람에 따른 홍수터관리 방안 연구)

  • Seo, Kyu-Woo
    • Journal of Wetlands Research
    • /
    • v.4 no.2
    • /
    • pp.57-66
    • /
    • 2002
  • The local storm occurred Nakdong river basin from August 4 to 11 of the year 2002, resulting in a record 500-600mm rainfall. The heavy rain continued for more than 10 days and especially between 3 to 4 am of August 9, 50mm per hour local storm occurred in Hanrim-myun area, Kimhae. 8 days after the storm, the water level of Nakdong river rose rapidly and the river flowed backward the branches. T he draining of the protected low wetland was unable and the water level of the inner bank area rose suddenly, causing the inundation in several areas. Baeksan bank of Nam river, Gahyun(Samhak) bank of Hwang river, and Kwangam bank of Shinban river, where the draining facilities were under construction or constructed recently, were failed by the piping around the draining culvert. This study analyze the cause of the damage in Nakdong river banks and suggests the countermeasures for future improvement. The damaged spot of the river bank was surveyed, and the rainfall and the fluctuation in the water levels were reviewed. Finally for the flood inundation prevention at the inner bank area, new floodplain management plan as the protect of low wetland established.

  • PDF

EU Water Framework Directive-River Basin Management Planning in Ireland

  • Earle, R.;Almeida, G.
    • Environmental Engineering Research
    • /
    • v.15 no.2
    • /
    • pp.105-109
    • /
    • 2010
  • The European Union (EU) Water Framework Directive (WFD) (2000/60/EC) was transposed into Irish law by Statutory Instrument Nos. 722 of 2003, 413 of 2005 and 218 of 2009, which set out a new strategy and process to protect and enhance Ireland's water resources and water-dependent ecosystems. The Directive requires a novel, holistic, integrated, and iterative process to address Ireland's natural waters based on a series of six-year planning cycles. Key success factors in implementing the Directive include an in-depth and balanced treatment of the ecological, economic, institutional and cultural aspects of river basin management planning. Introducing this visionary discipline for the management of sustainable water resources requires a solemn commitment to a new mindset and an overarching monitoring and management regime which hitherto has never been attempted in Ireland. The WFD must be implemented in conjunction with a myriad of complimentary directives and associated legislation, addressing such key related topics as flood/drought management, biodiversity protection, land use planning, and water/wastewater and diffuse pollution engineering and regulation. The critical steps identified for river basin management planning under the WFD include: 1) characterization and classification of water bodies (i.e., how healthy are Irish waters?), 2) definition of significant water pressures (e.g., agriculture, forestry, septic tanks), 3) enhancement of measures for designated protected areas, 4) establishment of objectives for all surface and ground waters, and 5) integrating these critical steps into a comprehensive and coherent river basin management plan and associated programme of measures. A parallel WFD implementation programme critically depends on an effective environmental management system (EMS) approach with a plan-do-check-act cycle applied to each of the evolving six-year plans. The proactive involvement of stakeholders and the general public is a key element of this EMS approach.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

Plan for Flood Control Linked with Dam and River Basin (댐과 하천유역을 연계한 홍수 대응 방안 - 2020년 섬진강 홍수사상을 대상으로 -)

  • Kyong Oh Baek;Dong Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.81-86
    • /
    • 2023
  • In this study, a one-dimensional numerical model was constructed to propose a flood control plan linked with the dam and river basin for the flood events of the Seomjin River in 2020. The flood level reduction of the downstream river was tested based on a scenario operation of the Seomjingang Dam and was also analyzed when a storage pocket was newly constructed as one of the river basin measures. It was confirmed that Seomjingang Dam's flood control capacity would be increased if the flood limit level was drastically lowered from the current EL. 196.5 m to EL. 188.0 m. In addition, if the upper area of the (old) Geumgok Bridge (which suffered great damage due to the loss of the levee) is used as a storage pocket, it would be effective in preventing floods in the lower area of it. In the era of the climate crisis, more integrated flood management is needed and basic river management must be observed.

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF