• Title/Summary/Keyword: Risk management system

Search Result 2,384, Processing Time 0.031 seconds

On the Application of Risk Management by Levels of Project Management Maturity (프로젝트관리 성숙도별 리스크관리 적용)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.2
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Study on Cybersecurity Risk Assessment in Maritime Sector (해상분야 사이버보안 위험도 분석)

  • Yoo, Yun-Ja;Park, Han-Seon;Park, Hye-Ri;Park, Sang-Won
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.134-136
    • /
    • 2019
  • The International Maritime Organization (IMO) issued 2017 Guidelines on maritime cyber risk management. In accordance with IMO's maritime cyber risk management guidelines, each flag State is required to comply with the Safety Management System (SMS) of the International Safety Management Code (ISM) that the cyber risks should be integrated and managed before the first annual audit following January 1, 2021. In this paper, to identify cyber security management targets and risk factors in the maritime sector and to conduct vulnerability analysis, we catagorized the cyber security sector in management, technical and physical sector in maritime sector based on the industry guidelines and international standards proposed by IMO. In addition, the Risk Matrix was used to conduct a qualitative risk assessment according to risk factors by cyber security sector.

  • PDF

An Analysis of the Applicability of Technical Risk Index in the Weapons System Research & Development Projects (무기체계 연구개발사업에서 기술적 위험지표 적용 가능성 분석)

  • Lee, Sunhun;Kim, Minjun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.6
    • /
    • pp.835-843
    • /
    • 2017
  • The Technology Readiness Assessment(TRA) has the advantage of identifying immature technologies in promoting weapon system research and development project. However, a more diverse set of information is required for the determination of phase shift and technical risk management for weapons system R&D projects. In this paper, we investigate the various indexes the various indexes proposed to overcome the limitations of the Technology Readiness Level(TRL) and analyze the possibility of applying to the actual weapons system R&D projects. Based on the analysis, it was possible to provide additional information that could not be presented in TRA using technical risk indexes other than TRL, confirming that it could be used for technical risk management for weapons system R&D projects.

글로벌 SCM 에서의 위험관리 프레임웍에 관한 연구: A 기업 사례를 중심으로

  • Park, Dae-Hyeon;Cheon, Se-Hak
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.254-263
    • /
    • 2008
  • 기업의 경영활동이 글로벌화되면서 이를 둘러싸고 있는 경영환경도 급변하게 되었다. 이로 인하여 기업이 처한 위험(Risk)의 유형도 더욱 다양해지고, 그 빈도 또한 증가하게 되었다. 특히 인터넷 환경하의 보다 진보된 정보시스템은 기업의 경영 효율성을 증가시키는 반면에 위험(Risk)의 발생 정도와 그 파급 효과를 더욱 더 증가시키고 있다. 위험(Risk)을 인식하고 이를 분석하고 평가하여 관리하는 능력이 뛰어난 기업은 위험(Risk)에 따른 피해의 확산을 조기에 차단하고 오히려 이를 기회로 이용할 수도 있다. 위험관리(Risk Management)는 주로 재무관리 또는 보험관리 분야에서 다루어왔다. 즉, 일반적으로 자금의 조달이나 투자업무에 있어서 불확실성을 제거하고 분산 투자를 실행하고 미래의 불확실한 상황에 대비하여 보험을 준비하는 등의 내용들이 기존 연구에서의 위험관리(Risk management)와 관련된 것이었다. 본 연구에서는 위험관리를 정보시스템 분야에 적용하여 정보시스템의 위험관리에 관한 인식을 고취하고, 나아가 보다 체계적인 Global SCM 의 구축하여 글로벌 경쟁환경하에서 기업의 경쟁우위를 제고하고자 한다. 특히 기업위험관리(Enterprise Risk Management)관점에서 Global SCM 의 위험관리체계의 프레임웍(Framework)을 제시하여 지금까지 정립되지 않았던 SCM 의 Risk Management 에 대한 연구의 기초를 마련하려고 한다.

  • PDF

An Application Study of Accident Analysis Method Based on Epidemiological Model to Improve Occupational Safety and Health Management System (사업장 안전보건관리체계 향상을 위한 역학모형 기반의 사고분석기법 활용 방안 연구)

  • Kyunghwan Kim;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.9-15
    • /
    • 2023
  • The Severe Disaster Punishment Act had recently been established in order to promote safety and health (OSH) management system for severe accident prevention. OSH management system is primarily designed based on risk assessments; however, companies in industries have been experiencing difficulties in hazard identification and selecting proper measures for risk assessments and accident prevention. This study intended to introduce an accident analysis method based on epidemiological model in finding hazard and preventive measures. The accident analysis method employed in this study was proposed by the U.S. Department of Energy. To demonstrate the effectiveness of the accident analysis method, this study applied it to two accident cases occurred in construction and manufacturing industries. The application process and results of this study can be utilized in improving OSH management system and preventing severe accidents.

A Study on Intellgence Emergency Guide Line System (지능형 피난유도선 시스템에 대한 연구)

  • Park, Yong-Gyu;Kim, Suk-Eun;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.107-116
    • /
    • 2010
  • Government and company are unfolding greenhouse gas reduction activity to prevent the effects of global warming. Also, verification business through greenhouse gas inventory construction is spreaded variously. Greenhouse gas verification proceeds by document examination, risk analysis, field survey. Document investigates emission information, calculation standard, emission report, data management system. And through risk assessment result, establish field verification plan. Through study on risk assessment of greenhouse gas inventory verification, wish to reduce risk of verification.

  • PDF

The Factors Affecting the Implementation of Risk Management Systems: The Case of ALM Systems (국내 금융기관의 위험관리시스템 도입에 영향을 미치는 요인: ALM시스템을 중심으로)

  • Hahm, Yu-Kun
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.211-227
    • /
    • 1998
  • The process of implementing risk management systems for the organizations in financial service industry can be viewed as a diffusion of innovation since the introduction of the risk management systems changes the decision making process on risks faced by the organizations. The purpose of the reported research is to examine the factors that affect the successful implementation of ALM(asset & liability management) systems, the risk management systems managing interest rate risk. Specifically, this paper presents an investigation of three factors from the diffusion of innovation studies; internal factors, external factors, and time. A field survey was conducted for Korean banks that have implemented ALM systems. The results suggest that the perceived uncertainty of market, system supports, and management supports be most significantly related to the successful implementation of the risk management systems. The findings of the current study also suggest a certain amount of time should be passed to diffuse the risk management systems in organizations.

  • PDF

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.

A Study on the Efficient Management of University Laboratories through Differential Designation of Chemical Substances and Classification of Management System (관리대상 화학물질의 지정 및 관리체계 차등화를 통한 효율적 대학 연구실 관리에 대한 연구)

  • Duk-Han, Kim;Min-Seon, Kim;Ik-Mo, Lee
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.4
    • /
    • pp.61-70
    • /
    • 2022
  • In spite of lab safety act for over 10 years, over 100 safety accidents in the laboratory have been constantly occurring. The ideal safety management system is to prevent accidents by differential classifying and managing laboratory regulatory materials according to the risk level. In order to approach this system, in-depth interviews with safety managers were first conducted to identify the current status of safety management in domestic university laboratories. And then through comparative analysis of safety management systems in domestic and foreign laboratories, a new regulatory substance classification standard based on the analysis of the hazards and the classification of risk grades, and a safety management system are proposed. From this study, it will contribute to the creation of a safe laboratory environment by differential classification and management laboratory regulatory materials based on the risk level.