Architects are facing increasing risks that result from heightened expectations of benefits and performance when designing green buildings compared to traditional buildings. This study aims to explore the possible risk factors for architects in green building projects in South Korea and assess risk mitigation measures. To attain this goal, 14 risk factors and 12 mitigation measures were determined through an extensive literature review. A questionnaire was administered to architects practicing green building design and criticality index was employed to assess major risk factors and mitigation measures. This study identified 'adoption of new technology and process', 'green building certification results', 'building products and materials', and 'energy saving uncertainty' as the major risk factors of green building projects. Additionally, the questionnaire proposed 'contract indicating each party's role, liability, and limitations clearly', 'utilizing integrated design process', and 'understanding client's goal in green building projects' as the three most effective risk mitigation measures in designing green buildings. There are few studies that focus on architects' perceived risks concerning green building projects; this study contributes to a deeper knowledge and attempts to fill the current literature gap, which would benefit South Korea's green building design practice by aiding in the development of better risk management strategies.
Journal of Korean Society of Archives and Records Management
/
v.11
no.2
/
pp.189-215
/
2011
Owing to changing work environment and increasing uncertainty, risk management in records management area is becoming more important to secure work legitimacy and to increase the value of information for future. While risk factors in traditional records management were mainly focused on the preservation function, those in current records management were directly coupled with those of overall work processes which produce, distribute, and utilize records because information technologies make the relationship between works and records closer. This study proposes a set of risk management factors and strategies in records management based on the overall risk management framework of ISO 31000. Moreover, ARMA's works areas and NIST's systems areas were applied to form the risk management processes in records management, and ISO's records management standards were used to suggest the checklists for the processes in both areas, especially with ISO TR 26122 for work processes, and ISO 16175-3 for the context of records.
It is critical to manage risks to complete IS(Information Systems) projects successfully. Identifying risk factors would be the first step for the project risk management. Previous research has discussed the issue with various points of view, such as different risk factors based on project types and roles involved in their projects. This paper empirically explored how people perceive different risk factors by project development methodology, between self-developing IS using programming language like C, Visual Basic and adapting software package already developed by software venders like ERP, CRM packages. There are researches regarding project risk factors for project management in the several point of views. And there are also researches regarding comparison between self-developing and adapting software packages methodology in IS project. However, there are no study on project risk factors comparison between self-developing IS using programming language and adapting software packages already developed by software venders in IS project. This research can be differentiated from previous ones, because it was considered both point of project risk management and development methodology in IS project. This research results implied meaningful messages to enterprise company to be planned IS projects and people who involved in IS projects. They should consider and need to prepare differently according to each development methodology for preventing project risks. It makes them reduce project risks in each case and complete successfully IS projects. Especially, if they have no experiences for implementing software packages, they can forecast the project risks and prepare them in advance.
Kyung-Jin RYU;Su-Hyung KIM;Kyunghun LEE;Sunghun KIM;Sung-Jae WON;Yoo-Won LEE
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.60
no.2
/
pp.152-160
/
2024
We analyzed risk factors of coastal gillnet fishers during fishing process and considered work safety measures to reduce safety accidents during fishing using a UWB (ultra wideband) based positioning system. The static position accuracy of the UWB based positioning system was 45 cm. When entering a port, there is a risk of falling overboard. When casting a net, there was a risk of falling overboard due to being hit by fishing gear or guards, or getting caught in a buoy line or sinker line. When hauling a net, there is a risk of getting caught between fishing gear and net hauler, and the risk of musculoskeletal disorders due to repetitive work over a long period of time. Most safety accidents during work on fishing boats are blamed on human errors of the fisher and skipper, but safety accidents occur due to a mixture of mechanical and equipment factors, work and environmental factors, and management factors in addition to human errors. Therefore, the 4E were presented as countermeasures against the 4M, which are causes of safety accidents, and the proposed measures were used to identify risk factors for operation process, comply with work safety rules, and ensure the wearing of personal protective equipments. We need to reduce safety accidents during work by making it part of our daily routine. These research results can be used in the future for optimal placement of fishing gear and fishing nets in other coastal industries where safety accidents occur frequently.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05b
/
pp.85-89
/
2010
The propose of this research is derive project management factors and evaluate its decision weight in LNG plant EPC phases. In order to research, we studied the demestic and international research trend and analysed expert opinions. Initially we derived nine project management factors in each phase of EPC. Elicited factors in research are project management, design management, cost management, time management, contract and craim management, safety management, environment management, and risk management. Then, we evaluated the weight of project management factors with expert survey method and elicitated. Finally, The remarkable points in the result are that key management factors of EPC project are project management and risk management.
For the continuous growth of firms, the contributions of effective risk management system are required. This research analyzes the impact on the firm's performance related to risk management structure which includes the risk management system, risk management activity and risk management competency. In this research, the structural equation model considering the variable which contains enterprise risk management system, risk management activity and risk management competency was suggested. Also risk management organization and management procedures are identified as in enterprise risk management system. The implementation activity and control activity were the factors related in risk management activity. And risk management competency can be described as the response level of managing risk in outside and inside the firms' environment. Finally this model was analysed empirically for 112 firms in Korea using SPSS 18.0 and Amos 16.0. As the results, the suggested hypothesis were adopted. So as to manage risk performance for their firms, the development of systematic Risk Management Framework is important for their risk management activity and risk management competency. Ultimately, we can conclude that the focusing to the systematic risk management approach could be effective on the firm's risk management performance.
This study aimed to determine relationships among risk factors influencing container port operation using Bayesian network. Risk factors identified from prior studies were classified into five groups: human error, machinery error, environmental risk, security risk, and natural disasters. P anel experts discussed identified risk factors to fulfil conditional probability tables of the interdependence model. The interdependence model was also validated by sensitivity analysis and provided an interrelation of factors influencing the direction of each other. Results of the interdependence model were partially in line with results from prior studies while practices in the global port industry confirmed interrelationships of risk factors. In addition, the relationship between top-ranked risk factors can provide a schematic drawing of the model. Accordingly, results of this study can expand the prior research in the Korean port industry, which may help port authorities improve risk management and reduce losses from the risk.
International conference on construction engineering and project management
/
2007.03a
/
pp.140-149
/
2007
Indian construction companies have only 0.05% market share in the 3-4 trillion dollar global construction business and only two Indian construction companies figure in the ENR "Top 225 Global Contractors 2006" list. Hence, while enormous scope for growth exists, international construction experience is limited. This study explores the risks as perceived by Indian companies venturing abroad since risks in international construction differ from home market risks. Literature survey identified a number of risk factors that were evaluated by the experts, highlighting fourteen important risk factors. Interpretive Structural Modelling (ISM) was used to develop a hierarchical model showing the relationships between the different risk factors, thus helping to focus on the key risks for effective risk management. The study shows that poor project management is a key risk forming the hub of the system, while political instability has maximum influence. The results of the study can be used by managers to visualise the risks in perspective and prioritise the mitigation effort.
Objective: This study aims to suggest different approaches in analyzing risks associated with musculoskeletal disorders (MSDS) for risk assessment. Background: Upon concluding that the changes in the industrial environments have made it hard to regulate diverse risk factors, the government has implemented a policy for risk assessment. Method: This study has proposed a method, creating programs using Excel that perform qualitative or quantitative analysis, for evaluating risk factors in risk assessments and has applied this in manufacture and service industries. Results: To verify the validity of the developed program, risk assessment has been performed on restaurant chefs as an example. For quantitative evaluation, the study has suggested approaches using the results for REBA evaluation and the analysis report on the work scenes of a fitting-shop in a shipbuilding industry. Application: Constructing and adapting a system using Excel in evaluating risk factors for risk assessments as this study suggests, is expected to contribute to revitalizing risk assessments.
Bergh, Linn Iren Vestly;Leka, Stavroula;Zwetsloot, Gerard I.J.M.
Safety and Health at Work
/
v.9
no.1
/
pp.63-70
/
2018
Background: Psychosocial risk management [Psychosocial Risk Management Approach (PRIMA)] has, through the years, been applied in several organizations in various industries and countries globally. PRIMA principles have also been translated into international frameworks, such as PRIMA-EF (European framework) and the World Health Organization Healthy Workplace Framework. Over the past 10 years, an oil and gas company has put efforts into adopting and implementing international frameworks and standards for psychosocial risk management. More specifically, the company uses a PRIMA. Methods: This study explores available quantitative and qualitative risk data collected through the PRIMA method over the past 8 years in order to explore specific and common psychosocial risks in the petroleum industry. Results: The analyses showed a significant correlation between job resources and symptoms of work-related stress, there was a significant correlation between job demands and symptoms of work-related stress, and there were differences in psychosocial risk factors and symptoms of work-related stress onshore and offshore. The study also offers recommendations on how the results can further be utilized in building a robust system for managing psychosocial risks in the industry. Conclusion: The results from the analyses have provided meaningful and important information about the company-specific psychosocial risk factors and their impact on health and well-being.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.