• Title/Summary/Keyword: Risk level based management system

Search Result 208, Processing Time 0.034 seconds

Trust Measurement Using Fuzzy Theory and Trade Protocol Recommendation Based on Trust Level in Trusted Auction System (신뢰 기반 경매 시스템에서의 퍼지를 이용한 신뢰도 측정과 신뢰도에 따른 거래 방식 추천)

  • 양근우;허순영
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.2
    • /
    • pp.17-33
    • /
    • 2003
  • The explosive growth of the internet-based transactions requires not only a secure payment system but also an appropriate trust measuring methodology and secure transaction protocols to guarantee the minimal risk for the transacting entities involved in specific transactions. Especially, in internet auction systems where either buyers or sellers or both can be more than one in one transaction, providing those systems that make sure no one transacting entity takes a major risk becomes critical. In this paper, an improved trust measuring method using a relationship-based internet community for an auction system is proposed. The proposed system incorporates fuzzy set and calculation concepts to help build trust matrices and models, which is used to measure the level of risk involved in a specific auction trade concerned. Also, to optimize the auction trade process in terms of cost and time, the proposed system recommends a differentiated trade protocol according to the risk level involved in each auction trade. To test the appropriateness of the proposed trusted auction system, a prototype system has been developed under a Windows-NT environment.

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

  • Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
    • Safety and Health at Work
    • /
    • v.2 no.2
    • /
    • pp.105-121
    • /
    • 2011
  • Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

WEB-BASED GEOGRAPHIC INFORMATION SYSTEM FOR CUT-SLOPE COLLAPSE RISK MANAGEMENT

  • HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1260-1265
    • /
    • 2009
  • Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.

  • PDF

A Comparative Study of risk based LOS(Level of service) of the Regional Water Supply (자산관리 상수도분야 리스크 기반 서비스수준)

  • Cho, Inuh;Lee, Youngjai
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • The function failure of present major facilities is likely to lead to failure of related systems and/or whole facilities, increasing the necessity for protection of infrastructures, main structures, and major industrial facilities. In addition, safe and efficient management for urban infrastructure (waterworks and sewerage facilities, electricity, telecommunications, roads, etc) installed in the basement or on large cities grounds at various public areas is required. Recently in response to this demand, efforts for vitalizing asset management are being made such as enacting related laws and developing asset management system in the U.S., Australia, Europe and other advanced countries with the concept for a new maintenance. In our county, identifying maintenance system problems such as aging and rapid increasing of existing infrastructures and decision-making about updating maintenance is required for systematic and organizational maintenance. In this study, by comparing and observing the LOS(Level of Service) of each countries' waterworks and risk-based LOS, we suggest the direction of future urban water infrastructure management systems for more effective management.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

Safety Management System of Railway Logistics Based on Risk Analysis (리스크분석에 의한 철도물류 운영기관의 안전경영시스템에 관한 연구)

  • Lee, Ik-Seong
    • Journal of Applied Reliability
    • /
    • v.10 no.1
    • /
    • pp.73-91
    • /
    • 2010
  • All activities relate to railway traffic involve risk and that these arise from a combination of the nature of operating activities. Proper management system is required to provide the organizational capability to reveal, analyse and address these weaknesses over time and in reasonably practicable ways, which will determine the rate at which risks can be further reduced. This paper presents a systematic risk analysis approach to safety planning and decision making, informed by a range of risk assessment techniques. An railway organization's safety management system is also presented that shows the approaches taken to minimize the external risks, and identify the shared risks and explain how they will be controlled through collaboration with others.

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

The Auditors' Responses to Management's Overconfident Tone Depending on the Level of Earnings Management (경영자의 자기과신적 어조 및 이익조정에 대한 감사인의 반응)

  • Hee-Yeon Sunwoo;Hyejeong Shin
    • Journal of East Asia Management
    • /
    • v.4 no.1
    • /
    • pp.23-51
    • /
    • 2023
  • We investigate whether the association between management overconfident tone and the level of audit effort measured by audit fees and hours differs depending on the level of earnings management. Prior studies suggest that firms led by overconfident managers are likely to initiate risky investments, report low quality financial statements, and have material weaknesses in internal control system. These characteristics, combined together, result in higher audit risk. At the same time, auditors assess audit risk based on the quality of financial reporting, measured by level of earnings management. As a result, the assess audit risk is likely to reflect the combined effect of management overconfidence and the level of earnings management. In this paper, we investigate whether auditors differentiate the effects of real earnings management (REM) and accrual-based earnings management (AEM) when they assess the audit risk related management overconfident. Using the CEO's letter published in 2018, we measure the CEO's tone representing the degree of overconfidence (i.e., activity). Based on this measure, we find that the positive association between managerial overconfident tone and audit effort is more pronounced as the level of REM is higher. However, we find that the baseline association does not vary depending on the level of AEM. These results suggest that auditors consider the managerial overconfident severer when such characteristic accompany the higher level of REM, which can be outcome of aggressive business decisions possibly leading to the higher audit risks. We further find that these results are stronger for Big 4 auditors and continuing auditors. This paper contributes to the literature and practice as follows. First, we provide contextual evidence on how auditors reflect managerial characteristics in the audit process by documenting that auditors actively increase their audit efforts only when overconfident managerial characteristics are highly likely to lead to audit risk. This result suggests that auditors conduct external auditing considering both the efficiency and effectiveness of the audit process. Second, we suggest that auditors use information obtained from a wide range of sources to identify audit risks. Our results provide evidence of how the auditing standards, which do not provide detailed guidelines for audit risk assessment, are being applied in practice. Finally, our results also enhance the understanding of how audit fees are determined. Combined with the studies related to audit pricing, we provide the important reference for discussion between the auditor and the auditee about the audit fee that has created acute tension after the enforcement of the new External Audit Act.

Development of HAZMAT Information System (수송안전정보시스템 개발)

  • 안승범;김시곤;김용진;홍우식
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.49-65
    • /
    • 2004
  • Ministry of Environment developed ‘Emergency Response Information System (ERIS)’ in 2001, which is in operation. As a next step, currently National Emergency Response Information System (NERIS) is being developed. The main difference among ERIS and NERIS is to enhance the system in the national level, including transportation of hazardous materials. This paper introduces concepts and methods applied to NERIS, especially HAZMAT, and the information system, operating strategies. Based on GIS and transportation-network data, the best route can be offered using Risk Analysis. Strategies for reporting and first-response information systems are also designed for emergencies in the paper.

A Study on the Safety Culture and Effective Management System (안전문화와 효율적 안전경영 방안 연구)

  • Yi Kwan Hyung;Oh Ji Young
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.3
    • /
    • pp.1-15
    • /
    • 2005
  • Recently in Korean Society, risk and safety has become a central discourse in not only the social and natural science but also political decision making. The efficient organizational management contributes to controlling the risk factors in the workplace. For the management is influenced and improved by the organizational culture, the alternatives more than simply improving the work environment or enforcing the education of safety on each workers are required. This study was the status of safety culture in organizational members(managers and workers, and specialist) including the attitude on the safety atmosphere and risk perception, and experiences, knowledges, motivation etc. For this part, the method of questionnaire and statistical analysis are mobilized. The degree of safety commitment of organization members appears relatively high (3.97 in five scale estimation), but there are variations in this results according to socio-demographic characteristics. At the same time, managers and professionals actively participation in the program related to safety than workers in production/sales. The higher income level and career is the more attention to the safety is. Based on this survey, we make an rough suggestion of several tasks to the policy -makers: improvement of communication on the risk and safety is required and in particular, the workers in the relatively low level in production/sales. The education system about safety which is, with one-side, provided by government or managers turns out to be inefficient. Rather, small group performance of the organizational members which they participate in the communication with interaction in the various discourse are able to provoke the safety mood in workplace.