Journal of the Korean Operations Research and Management Science Society
/
v.28
no.2
/
pp.17-33
/
2003
The explosive growth of the internet-based transactions requires not only a secure payment system but also an appropriate trust measuring methodology and secure transaction protocols to guarantee the minimal risk for the transacting entities involved in specific transactions. Especially, in internet auction systems where either buyers or sellers or both can be more than one in one transaction, providing those systems that make sure no one transacting entity takes a major risk becomes critical. In this paper, an improved trust measuring method using a relationship-based internet community for an auction system is proposed. The proposed system incorporates fuzzy set and calculation concepts to help build trust matrices and models, which is used to measure the level of risk involved in a specific auction trade concerned. Also, to optimize the auction trade process in terms of cost and time, the proposed system recommends a differentiated trade protocol according to the risk level involved in each auction trade. To test the appropriateness of the proposed trusted auction system, a prototype system has been developed under a Windows-NT environment.
Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
Safety and Health at Work
/
v.2
no.2
/
pp.105-121
/
2011
Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.
HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
International conference on construction engineering and project management
/
2009.05a
/
pp.1260-1265
/
2009
Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.
The function failure of present major facilities is likely to lead to failure of related systems and/or whole facilities, increasing the necessity for protection of infrastructures, main structures, and major industrial facilities. In addition, safe and efficient management for urban infrastructure (waterworks and sewerage facilities, electricity, telecommunications, roads, etc) installed in the basement or on large cities grounds at various public areas is required. Recently in response to this demand, efforts for vitalizing asset management are being made such as enacting related laws and developing asset management system in the U.S., Australia, Europe and other advanced countries with the concept for a new maintenance. In our county, identifying maintenance system problems such as aging and rapid increasing of existing infrastructures and decision-making about updating maintenance is required for systematic and organizational maintenance. In this study, by comparing and observing the LOS(Level of Service) of each countries' waterworks and risk-based LOS, we suggest the direction of future urban water infrastructure management systems for more effective management.
Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.
All activities relate to railway traffic involve risk and that these arise from a combination of the nature of operating activities. Proper management system is required to provide the organizational capability to reveal, analyse and address these weaknesses over time and in reasonably practicable ways, which will determine the rate at which risks can be further reduced. This paper presents a systematic risk analysis approach to safety planning and decision making, informed by a range of risk assessment techniques. An railway organization's safety management system is also presented that shows the approaches taken to minimize the external risks, and identify the shared risks and explain how they will be controlled through collaboration with others.
International conference on construction engineering and project management
/
2022.06a
/
pp.245-252
/
2022
Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.
We investigate whether the association between management overconfident tone and the level of audit effort measured by audit fees and hours differs depending on the level of earnings management. Prior studies suggest that firms led by overconfident managers are likely to initiate risky investments, report low quality financial statements, and have material weaknesses in internal control system. These characteristics, combined together, result in higher audit risk. At the same time, auditors assess audit risk based on the quality of financial reporting, measured by level of earnings management. As a result, the assess audit risk is likely to reflect the combined effect of management overconfidence and the level of earnings management. In this paper, we investigate whether auditors differentiate the effects of real earnings management (REM) and accrual-based earnings management (AEM) when they assess the audit risk related management overconfident. Using the CEO's letter published in 2018, we measure the CEO's tone representing the degree of overconfidence (i.e., activity). Based on this measure, we find that the positive association between managerial overconfident tone and audit effort is more pronounced as the level of REM is higher. However, we find that the baseline association does not vary depending on the level of AEM. These results suggest that auditors consider the managerial overconfident severer when such characteristic accompany the higher level of REM, which can be outcome of aggressive business decisions possibly leading to the higher audit risks. We further find that these results are stronger for Big 4 auditors and continuing auditors. This paper contributes to the literature and practice as follows. First, we provide contextual evidence on how auditors reflect managerial characteristics in the audit process by documenting that auditors actively increase their audit efforts only when overconfident managerial characteristics are highly likely to lead to audit risk. This result suggests that auditors conduct external auditing considering both the efficiency and effectiveness of the audit process. Second, we suggest that auditors use information obtained from a wide range of sources to identify audit risks. Our results provide evidence of how the auditing standards, which do not provide detailed guidelines for audit risk assessment, are being applied in practice. Finally, our results also enhance the understanding of how audit fees are determined. Combined with the studies related to audit pricing, we provide the important reference for discussion between the auditor and the auditee about the audit fee that has created acute tension after the enforcement of the new External Audit Act.
Ministry of Environment developed ‘Emergency Response Information System (ERIS)’ in 2001, which is in operation. As a next step, currently National Emergency Response Information System (NERIS) is being developed. The main difference among ERIS and NERIS is to enhance the system in the national level, including transportation of hazardous materials. This paper introduces concepts and methods applied to NERIS, especially HAZMAT, and the information system, operating strategies. Based on GIS and transportation-network data, the best route can be offered using Risk Analysis. Strategies for reporting and first-response information systems are also designed for emergencies in the paper.
Recently in Korean Society, risk and safety has become a central discourse in not only the social and natural science but also political decision making. The efficient organizational management contributes to controlling the risk factors in the workplace. For the management is influenced and improved by the organizational culture, the alternatives more than simply improving the work environment or enforcing the education of safety on each workers are required. This study was the status of safety culture in organizational members(managers and workers, and specialist) including the attitude on the safety atmosphere and risk perception, and experiences, knowledges, motivation etc. For this part, the method of questionnaire and statistical analysis are mobilized. The degree of safety commitment of organization members appears relatively high (3.97 in five scale estimation), but there are variations in this results according to socio-demographic characteristics. At the same time, managers and professionals actively participation in the program related to safety than workers in production/sales. The higher income level and career is the more attention to the safety is. Based on this survey, we make an rough suggestion of several tasks to the policy -makers: improvement of communication on the risk and safety is required and in particular, the workers in the relatively low level in production/sales. The education system about safety which is, with one-side, provided by government or managers turns out to be inefficient. Rather, small group performance of the organizational members which they participate in the communication with interaction in the various discourse are able to provoke the safety mood in workplace.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.