• 제목/요약/키워드: Risk Management Plan

검색결과 583건 처리시간 0.022초

통신탑재체 개발 위험관리 Case Study (Case Study of Risk Management on Communication Payload System Development)

  • 정철오;은종원
    • 항공우주시스템공학회지
    • /
    • 제5권2호
    • /
    • pp.8-11
    • /
    • 2011
  • The scope of this paper is to show a risk management plan including how to perform risk assessment and to make a mitigation plan aspects of the communication payload system development. According to system engineering management guide of DoD of USA and risk management plan of satellite communication system, risk assessment and mitigation plan of communication payload system were performed. In this paper, it is indicated the process of risk management and risk assessment procedures as well as mathematical model for risk assessment of DoD guide. It is shown how risk assessment and mitigation plan have implemented in communication payload system development through case study.

LEARNING FROM THE SOUTH KOREAN RISK MANAGEMENT PLAN FOR THE SHIPBUILDING INDUSTRY DURING THE DIFFICULT 2004-2005 YEARS

  • Seng-Kiong Ting;Mengqiong Wang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.990-994
    • /
    • 2009
  • With the world in financial recession, the general trend of global trade is declining. As a result, the world leading shipbuilding industries are confronted with an even more difficult task of mitigating various risks associated with the industries. How well the three shipbuilding industries, Japan, Korea and China, can adapt and manage the risks will be crucial. As the youngest of the top three, the Chinese industry faces greater risks. As it happens to share many factors with that of South Korea in 2004-2005, it is necessary to review and evaluate the risk management plan used by South Korea. This paper presents an evaluation of the risk management plan for shipbuilding industry in South Korea during 2004-2005, considering the financial and political environments at that time. This will help us to structure a plan of risk management for the future.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

노인요양시설의 위험관리시스템 구축활동에서 액션 플랜의 수립과 실행에 따른 성과와 시사점 (Outcome and Implication of Establishment and Practice of Action Plan for the Elderly Care Facility in Establishing Risk Management System)

  • 윤기혁;박경일;권진아
    • 한국콘텐츠학회논문지
    • /
    • 제16권11호
    • /
    • pp.308-320
    • /
    • 2016
  • 본 연구의 목적은 노인요양시설에서 위험의 예방과 대응을 위해 구축한 위험관리시스템의 실제 수행 활동인 액션 플랜의 실행 과정과 성과를 제시하는 경험적 사례 연구이다. 이를 위해 국내 최초로 위험 예방 및 대응을 위해 위험관리시스템을 구축하여 수행 활동을 해온 A노인요양시설이 2년간 실시(2014년~2015년)한 액션 플랜 실행 과정과 성과를 분석하였다. 본 연구의 결과 첫째 위험관리시스템 액션 플랜은 위험관리시스템 구축 4단계 과정 중 세 번째 단계인 위험 예방 및 대응처리 방법의 선택과 수행 단계에서 수립이 되었다. 둘째 위험관리시스템 액션 플랜 실행에 따른 성과로서 2년간(2014년~2015년)의 위험의 변화를 조사를 파악한 결과 2014년에 비해 2015년에 위험이 28% 감소하여 액션 플랜에 수행에 따른 위험관리 활동이 효과가 있는 것으로 나타났다. 이러한 결과를 바탕으로 노인요양시설에서 효과적인 액션 플랜 수립과 실행을 위해 액션 플랜은 독자적으로 수립되는 것이 아니라 비전과 전략을 바탕으로 전략, 성취목표와 성취과제 등이 잘 연계될 수 있도록 체계적인 추진일정을 수립해야 하고, 책임소재를 분명히 해야 하며, 간트 도표 등의 기법을 활용하여 실행되어야 할 모든 내용들이 한눈에 쉽게 알아 볼 수 있도록 도식화하여 구체적으로 작성하는 것이 중요하다.

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제11권2호
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

위기관리 시스템 활성화를 위한 시뮬레이터 개발에 관한 연구 (Study on Developing Simulator for Activating Company Risk Management System)

  • 기재석
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2006년도 춘계공동학술대회
    • /
    • pp.237-249
    • /
    • 2006
  • Critical incident can be happened at any time, any places without any pre-notification. For minimizing the loss of the life safety, financial and so on caused by the risk, most of company needs a system what can activate the critical incident management plan to prevent, plan for and respond to events that become critical incident. But a lot of company still don't have such a detailed system in our country and almost company has no effective training way for to boot. This paper shows the way to activate the risk management system to work efficiently the plan. The training way, proposed by this paper, is a incident command simulator based on virtual reality and scenario generation software.

  • PDF

위기관리 시스템 활성화를 위한 시뮬레이터 개발에 관한 연구 (Study on Developing Simulator for Activating Company Risk Management System)

  • 기재석
    • 대한안전경영과학회지
    • /
    • 제8권4호
    • /
    • pp.25-37
    • /
    • 2006
  • Critical incident can be happened at any time, any places without any pre-notification. For minimizing the loss of the life safety, financial and so on caused by the risk, most of company needs a system what can activate the critical incident management plan to prevent, plan for and respond to events that become critical incident. But a lot of company still don't have such a detailed system in our country and almost company has no effective training way for to boot. This paper shows the way to activate the risk management system to work efficiently the plan. The training way, proposed by this paper, is a incident command simulator based on virtual reality and scenario generation software.

공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구 (A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation)

  • 서병석;신도형
    • 대한안전경영과학회지
    • /
    • 제17권2호
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review

Sampling Plans Based on Truncated Life Test for a Generalized Inverted Exponential Distribution

  • Singh, Sukhdev;Tripathi, Yogesh Mani;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • 제14권2호
    • /
    • pp.183-195
    • /
    • 2015
  • In this paper, we propose a two-stage group acceptance sampling plan for generalized inverted exponential distribution under truncated life test. Median life is considered as a quality parameter. Design parameters are obtained to ensure that true median life is longer than a given specified life at certain level of consumer's risk and producer's risk. We also explore situations under which design parameters based on median lifetime can be used for other percentile points. Tables and specific examples are reported to explain the proposed plans. Finally a real data set is analyzed to implement the plans in practical situations and some suggestions are given.

건설현장 공사주체간 위험성관리의식의 중요도 설정에 관한 연구 (Weighting Factor of Consciousness between Main and Sub Contractor for Establishing an Effective Risk Management in Construction Industry)

  • 손기상;은남권
    • 한국안전학회지
    • /
    • 제28권4호
    • /
    • pp.72-80
    • /
    • 2013
  • Accident prevention plan it a construction site should be analyzed and made with risk evaluation and management, from recent year, in Korea. Accidents occurred in construction site are related to all parties such as owner, main and subcontractor, labour. But analyzing some relationship between main and subcontractor is very important to estimate what risk between then are existed in a site. There are some different aspects concerning with risk management between them. Everywork has its own risk in there, This is the reason why everywork which are made by subcontractor himself should be evaluated for risk level. And main contractor should provide for subcontractor to prevent each risk at the work, all the time.