• Title/Summary/Keyword: Risk Level

Search Result 5,637, Processing Time 0.03 seconds

Formulation for Producing Risk Level of Each Construction Work (전문 건설업 재해분석과 위험도 산정방안)

  • Son, Ki-Sang;Gal, Won-Mo;Choi, Jea-Nam
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.141-147
    • /
    • 2010
  • Risk level for each construction work can be very important factors to establish advanced preventionmeasures. But it is important how to produce it. There are three different methods to set it up for consturuction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.

  • PDF

Study on Measurement of Flood Risk and Forecasting Model (홍수 위험도 척도 및 예측모형 연구)

  • Kwon, S.H.;Oh, H.S.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.1
    • /
    • pp.118-123
    • /
    • 2015
  • There have been various studies on measurements of flood risk and forecasting models. For river and dam region, PDF and FVI has been proposed for measurement of flood risk and regression models have been applied for forecasting model. For Bo region unlikely river or dam region, flood risk would unexpectedly increase due to outgoing water to keep water amount under the designated risk level even the drain system could hardly manage the water amount. GFI and general linear model was proposed for flood risk measurement and forecasting model. In this paper, FVI with the consideration of duration on GFI was proposed for flood risk measurement at Bo region. General linear model was applied to the empirical data from Bo region of Nadong river to derive the forecasting model of FVI at three different values of Base High Level, 2m, 2.5m and 3m. The significant predictor variables on the target variable, FVI were as follows: ground water level based on sea level with negative effect, difference between ground altitude of ground water and river level with negative effect, and difference between ground water level and river level after Bo water being filled with positive sign for quantitative variables. And for qualitative variable, effective soil depth and ground soil type were significant for FVI.

Formulation for Producing Risk Level of Each Construction Work (전문 건설업종별 위험도 산정 방법에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Song, In-Yong;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.13-19
    • /
    • 2010
  • Risk level for each construction work can be very important factors to establish advanced prevention measures. But it is important how to produce it. There are three different methods to set it up for construction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.

Ecological Correlates of Cardiovascular Disease Risk in Korean Blue-collar Workers: A Multi-level Study (다수준 분석을 이용한 한국 생산직 근로자의 심혈관질환 위험에 대한 생태학적 요인)

  • Hwang, Won Ju;Park, Yunhee
    • Journal of Korean Academy of Nursing
    • /
    • v.45 no.6
    • /
    • pp.857-867
    • /
    • 2015
  • Purpose: The purpose of this study was to investigate individual and organizational level of cardiovascular disease (CVD) risk factors associated with CVD risk in Korean blue-collar workers working in small sized companies. Methods: Self-report questionnaires and blood sampling for lipid and glucose were collected from 492 workers in 31 small sized companies in Korea. Multilevel modeling was conducted to estimate effects of related factors at the individual and organizational level. Results: Multilevel regression analysis showed that workers in the workplace having a cafeteria had 1.81 times higher CVD risk after adjusting for factors at the individual level (p =.022). The explanatory power of variables related to organizational level variances in CVD risk was 17.1%. Conclusion: The results of this study indicate that differences in the CVD risk were related to organizational factors. It is necessary to consider not only individual factors but also organizational factors when planning a CVD risk reduction program. The factors caused by having cafeteria in the workplace can be reduced by improvement in the CVD-related risk environment, therefore an organizational-level intervention approach should be available to reduce CVD risk of workers in small sized companies in Korea.

A Study on Risk Perception and Policy Implication : A Psychometric Analysis of Korean Perception for Technological Risks (위험인식의 특성과 의미: 한국인의 기술위험 인지도에 대한 Psychometric 분석)

  • Chung, Ik Jae
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.80-85
    • /
    • 2014
  • A survey of risk perception in South Korea was conducted in 2007 to evaluate relative riskiness of typical industrial and technological risks. This article summarizes the characteristics of risk perception using psychometric analyses. The survey with a sample size of 1,194 reviews the perceived level of 25 risk items in the areas of transportation, chemicals, environment, industry, nuclear power generation, and newly-introduced risks. Six categories of risk identified by a factor analysis show that the level of perceived risk does not correspond to the statistical level. Psychometric analyses including voluntariness, severity, effect manifestation, exposure pattern, controllability, familiarity, benefit and necessity demonstrate that voluntary, familiar and immediate risks are perceived as less risky than involuntary, unfamiliar and delayed ones. Risk communication is critical in reducing the discrepance between objective and subjective level of risk. However, the amount of risk information does not always justify a successful risk communication. A safety policy, risk communication strategy in particular, should take into account diverse dimensions of risk reviewed by psychometric analyses in the study. Social policy toward safety can be improved by integrating policy, human, and social factors as well as technological advances.

Analysis on the Risk-Based Screening Levels Determined by Various Risk Assessment Tools (III): Proposed Methodology for Lead Risk Assessment in Korea (다양한 위해성평가 방법에 따라 도출한 토양오염 판정기준의 차이에 관한 연구(III): 우리나라 납 오염 위해성평가 방법 제안)

  • Jung, Jae-Woong;Nam, Kyoungphile
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.6
    • /
    • pp.1-7
    • /
    • 2015
  • The most critical health effect of lead exposure is the neurodevelopmental effect to children caused by the increased blood lead level. Therefore, the endpoint of the risk assessment for lead-contaminated sites should be set at the blood lead level of children. In foreign countries, the risk assessment for lead-contaminated sites is conducted by estimating the increased blood lead level of children via oral intake and/or inhalation (United States Environmental Protection Agency, USEPA), or by comparing the estimated oral dose to the threshold oral dose of lead, which is derived from the permissible blood lead level of children (Dutch National Institute for Public Health and the Environment, RIVM). For the risk assessment, USEPA employs Integrated-Exposure-Uptake-Biokinetic (IEUBK) Model to check whether the estimated portion of children whose blood lead level exceeds 10 µg/dL, threshold blood lead level determined by USEPA, is higher than 5%, while Dutch RIVM compares the estimated oral dose of lead to the threshold oral dose (2.8 µg/kg-day), which is derived from the permissible blood lead level of children. In Korea, like The Netherlands, risk assessment for lead-contaminated sites is conducted by comparing the estimated oral dose to the threshold oral dose; however, because the threshold oral dose listed in Korean risk assessment guidance is an unidentified value, it is recommended to revise the existing threshold oral dose described in Korean risk assessment guidance. And, if significant lead exposure via inhalation is suspected, it is useful to employ IEUBK Model to derive the risk posed via multimedia exposure (i.e., both oral ingestion and inhalation).

A Study on Fire Risk Analysis & Indexing of Buildings (건축물의 화재위험의 분석과 지수화에 관한 연구)

  • Chung, Eui-Soo;Yang, Kwang-Mo;Ha, Jeong-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.93-104
    • /
    • 2008
  • A successful fire risk assessment is depends on identification of risk, the analytical process of potential risk, on estimation of likelihood and the width and depth of consequence. Take the influence on enterprise into consideration, Fire risk assessment could carry out along the evaluation of the risk importance, the risk level and the risk acceptance. A large part of the limitation of choosing the risk assessment techniques impose restrictions on expense and time. If it is unnecessary high level risk assessment or Probabilistic Risk Assessment of buildings, in compliance with the Relative Ranking Method, Fire risk indexing and assessing is possible. As working-level technique, AHP method is useful with practical technique.

A Study on the Delayed Factors in Evacuation Behavior in the Case of Fire Accidents in Highway Tunnels (고속도로 터널 내 화재사고 발생 시 대피행동 지연 요인에 관한 연구)

  • Jae-Hwan, Cho
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.4
    • /
    • pp.143-148
    • /
    • 2022
  • This paper attempted to analyze the correlation between the risk image of the evacuees in the tunnel and the variables that affect the evacuation behavior due to the closed feeling. As to whether there is a difference in the level of recognizing the tunnel risk image according to the distribution of jobs, the null hypothesis was rejected at the significance probability of 0.002, so it can be said that the level of recognition of the tunnel risk image varies depending on the job group. In the distribution difference between gender and tunnel risk image recognition level, the significance probability was 0.012, indicating that the null hypothesis was rejected, indicating that the tunnel risk recognition distribution according to gender was different. As a result of analyzing the distribution difference between the tunnel's closed feeling and the tunnel risk perception level, the significance probability was 0.001, and the null hypothesis was rejected, indicating that there was a difference in the tunnel risk image level.

The Role of Operational Absorptive Capacity on Supply Chain Risk

  • Jeong, EuiBeom
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.26 no.6
    • /
    • pp.61-80
    • /
    • 2021
  • As the business environment becomes more rapid and unpredictable change, greater diversity, increased complexity, and intensified competitive pressures, supply chain risk management has been growing attention over the past several decades. However, little of known about how absorptive capacity can mitigate supply chain risk for improving operational performance despite its important role in responding to supply chain risk. Therefore, we aim to examine the role of organizational-level absorptive capacity on operational performance, and further identify how the interplay of individual-level and organizational-level absorptive capacity results in operational performance. Our results represent not only direct but also indirect effects of supply chain risk on operational performance, mediated by organizational-level absorptive capacity. Furthermore, this study reveals that individual-level absorptive capacity enhances the effect of organizational-level absorptive capacity on operational performance.

Relationship between the Risk Level and the Job Stress Level of Work Types in Architectural Work (건축건설공사의 공종별 위험도와 직무스트레스의 상관관계)

  • Kim, Jeongmin;Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.73-78
    • /
    • 2017
  • In this study, the risk level of architectural works was calculated by applying work period and number of input workers based on accidents records from 2012 to 2014 and the architectural works were divided into four groups(High-High, High-Low, Low-High, Low-Low) according to risk levels of fatal accidents and loss time accidents. And then questionnaire on the job stress level of workers was performed for 670 workers working in the architectural work using Korean Occupational Stress Questionnaire Form developed by KOSHA. And then the relationship between the risk level and job stress level of four groups was analyzed. Results showed that 1) risk levels of fatal and loss time accidents applied by work period and input workers were analyzed to be different with those of previous research based on the number of fatal and loss time accidents; 2) job stress level of workers has been analyzed to have a significant relationship with the risk level of fatal and loss time accident; 3) specially, the average of job stress level of 'HH(High-High)' group was higher than those of other groups; 4) among the subfactors of job stress, interpersonal conflict, job insecurity, organizational system and lack of reward were analyzed to be key factors to affect the risk level.