• Title/Summary/Keyword: Risk Improvement System

Search Result 556, Processing Time 0.026 seconds

A Study on Countermeasure Strategy on Risk of Human Errors driven by Advanced and Automated Systems Through Consideration of Related Theories (현대의 고도화, 자동화된 시스템이 파생한 휴먼에러에 관한 이론적 고찰을 통한 리스크 대응전략 설정)

  • Shin, In Jae
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.86-92
    • /
    • 2014
  • This paper provides an integrated view on human and system interaction in advanced and automated systems, which adopting computerized multi-functional artifacts and complicated organizations, such as nuclear power plants, chemical plants, steel and semi-conduct manufacturing system. As current systems have advanced with various automated equipments but human operators from various organizations are involved in the systems, system safety still remains uncertain. Especially, a human operator plays an important role at the time of critical conditions that can lead to catastrophic accidents. The knowledge on human error helps a risk manager as well as a designer to create and control a more credible system. Several human error theories were reviewed and adopted for forming the integrated perspective: gulf of execution and evaluation; risk homeostasis; the ironies of automation; trust in automation; design affordance; distributed cognition; situation awareness; and plan delegation theory. The integrated perspective embraces human error theories within three levels of human-system interactions such as affordance level, psychological logic level and trust level. This paper argued that risk management process should dealt with human errors by providing (1) reasoning improvement; (2) support to situation awareness of operators; and (3) continuous monitoring on harmonization of human system interaction. This approach may help people to understand risk of human-system interaction failure characteristics and their countermeasures.

Assessment of Risk Factors for Application of Exterior Insulation Board in Cast-in-place Concrete Form System for Apartment (공동주택용 외단열 동시타설 공법 적용을 위한 리스크 요인 평가)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.204-205
    • /
    • 2015
  • Exterior insulation board in cast-in-place concrete form system could reduce construction period and improve quality in apartment construction. However, the method is progressed with insulation and concrete frame works at the same time, then risk is increased in duration control and quality management. Therefore, this paper analyzed risk factors through FMEA method. We found that the key risk factors delaying schedule was insulation material that soaked in the rain and quality defects on the insulation material joint. Based on this research, the risk management approach should be developed for improvement of method activation.

  • PDF

Risk Management and Assessment Methodology in System Design (위험관리 프로세서와 평가의 새로운 접근)

  • 조희근;박영원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.197-208
    • /
    • 1999
  • Recently, risk management is a very important issue in many industrial applications. This paper describes a general structure for risk management and suggests a new risk assessment methodology. In risk management applications of financial or insurance industries, there are many methodologies developed for practical use. However, areas for improvement exist to facilitate the application of the methods. Two major risk assessment methodologies have been developed and widely applied in system engineering. One is in its original development application from aerospace and defense industry, and the other was developed in applied software engineering. In a large and complicated system development application, an effective risk management can reduce total development cost as well as uncertainty in achieving project goals of schedule and performance.

  • PDF

Improvement of Pressurizer PROV System through Micro-Computer and PRA (마이크로 컴퓨터와 확률론적 리스크 평가를 통한 가압기 보호계통의 설계 개선)

  • Jong Ho Lee;Soon Heung Chang
    • Nuclear Engineering and Technology
    • /
    • v.17 no.4
    • /
    • pp.302-316
    • /
    • 1985
  • Small break LOCA caused by a stuck-open PORV is one of the important contributors to nuclear power plant risk. This paper deals with the design of a pressurizer surveillance system using microcomputer to prevent the malfunction of system and has assessed the effect of this improvement through Probabilistic Risk Assessment (PRA) method. Micro-computer diagnoses the malfunction of system by a process checking method and performs automatically backup action related to each malfunction. Owing to this improvement, we can correctly diagnose “Spurious Opening”, “Fail to Reclose” and “Small break LOCA” which are difficult for operator to diagnose quickly and correctly and reduce the probability of a human error by an automatic backup action.

  • PDF

Discussion for Improvement of Decision System of Total Risk in Off-site Risk Assessment (화학사고 장외영향평가 제도의 종합위험도 결정 체계 개선을 위한 고찰)

  • Choi, Woosoo;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Jung, Jinhee;Lee, Jieun;Kim, Jungkon;Baek, Jongbae;Yoon, Junheon;Ryu, Jisung
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.3
    • /
    • pp.217-226
    • /
    • 2018
  • Objectives: Despite the positive effects of Off-site risk assessment (ORA) system such as prevention of chemical accidents, some problems have been constantly raised. The purpose of this study is to analyze the problems that have occurred through the implementation of the ORA system for the past three years and to suggest reasonable directions for improvement in the future. Methods: In order to identify the problems with the methodology and procedure of ORA system, we analyzed statutes, administrative rules and documents related to the ORA system. A survey of ORA reviewers in National Institute of Chemical Safety was conducted to investigate the weight of determinants considered when judging the level of total risk in ORA. Results: In this study, we found out the uncertainty of the estimation of the number of people in the impact range in the procedure of the risk assessment of individual handling facilities, the lack of quantitative risk analysis methods for environmental receptors, and the ambiguity of the criteria for the total risk. In addition to suggesting solutions to the problems mentioned above, we also, suggested a decision tree for total risk in ORA. Conclusion: We anticipate that the solutions including the systematic decision tree for total risk suggested will contribute to the smooth operation of the ORA system.

Identification an Improvement Plan for the Risk Assessment System to Increase the Reduction Rate of Industrial Accidents : Focus on Small and Medium-size Companies (산업재해 감소율 제고를 위한 위험성평가 제도의 개선 방안 도출 : 중소규모 사업장을 중심으로)

  • Song, Ho-Jun;Kim, Beom-Su;Shin, Jong-Gyu;Kim, Sang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.25-32
    • /
    • 2022
  • The rate of industrial accident reduction is slowing down as the attention of the Ministry of Employment and Labor and related agencies on risk assessment systems decreased. this paper focuses on weakness of legal system for the risk assessment in recent years. A survey was conducted to identify the status and condition of the risk assessment system applying on small and medium-sized manufacturing companies. A set of questionnaires is designed to reflect various perspectives of the companies regarding the problems and solutions of the system. The results refer that differentiated instructions and support systems in response to the actual conditions of the companies are mandatory to reinforce the efficiency of risk assessment system.

Risk Assessment in the UK Health and Safety System: Theory and Practice

  • Russ, Karen
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • In the UK, a person or organisation that creates risk is required to manage and control that risk so that it is reduced 'So Far As Is Reasonably Practicable (SFAIRP).' How the risk is managed is to be determined by those who create the risk. They have a duty to demonstrate that they have taken action to ensure all risk is reduced SFAIRP and must have documentary evidence, for example a risk assessment or safety case, to prove that they manage the risks their activities create. The UK Health and Safety Executive (HSE) does not tell organisations how to manage the risks they create but does inspect the quality of risk identification and management. This paper gives a brief overview of where responsibility for occupational health and safety lies in the UK, and how risk should be managed through risk assessment. The focus of the paper is three recent major UK incidents, all involving fatalities, and all of which were wholly avoidable if risks had been properly assessed and managed. The paper concludes with an analysis of the common failings of risk assessments and key actions for improvement.

A Study on the Quality Improvement Plan through Analysis of Information System Audit Examples (정보시스템 감리사례 분석을 통한 품질 향상 방안에 관한 연구)

  • Lee, Don-Hee;Jung, Hong-Sup;Lee, Ki-Young;Han, Ki-Joon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.10
    • /
    • pp.203-216
    • /
    • 2012
  • For the successful operation of the current organization, the importance of the information system is further increasing, and audit for the information system construction is also spreading according to the mandatory of information system audit. However our country's information system audit still does not deal with various risks and the improvement plan of it is desperately needed since bad practices are often happened while performing audit for the various information system projects. Therefore, this paper proposed improved review items for the quality improvement of information system construction by analysing data of information system audit projects and risk occurrence projects that are performed by the domestic large SI company during four years. In addition, this paper verified the effectiveness of the improved review items proposed in this paper by applying them to actual information system project examples.

A study on the effective administration of medical risk selection system for life insurance (보험진단제도의 효율적 운영에 대한 연구)

  • Ham, Dong-Un;Chun, Jin-Man;Shim, Suk-Kyueng
    • The Journal of the Korean life insurance medical association
    • /
    • v.27 no.2
    • /
    • pp.85-95
    • /
    • 2008
  • When an insurance company receives an application for life or health insurance, the company must evaluate the degree of risk the individual for insurance coverage presents before the company agrees to issue the policy. A medical factor is a physical or psychological characteristic that may increases a hazard. A financial factor is financial information that is taken into account by underwriter to determine if a person is applying for more than he/she reasonably needs or can afford. A personal factor is a lifestyle choice. There are several medical risk selection systems in Korean life insurance market. They are attending physician's statement, direct examination by insurance doctors, and paramedic examination. However there is some dissatisfaction of current system. It is possible that cooperation of part-time insurance doctors system may be one of useful system of medical risk selection. Improvement of medical risk selection system will be an important matter of profitability of insurance company and it will contribute to sound life insurance system.

  • PDF

Determining of an Optimal Spares Stocking Policy with Reliability Improvement

  • Jun Hong Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.56
    • /
    • pp.1-8
    • /
    • 2000
  • We present in this paper an optimal stocking policy for a repairable inventory system under reliability improvement. For this purpose we illustrate commercial flight lines with a large number of planes. This model is supported by a central repair facility. For modeling the nonstationary M/M/s system we implemented SIMAN for computing the time dependent number of units in the repair facility with any number of units. In this model we provide the required inventory level at each location. 1y month. for various levels of associated stock-out risk.

  • PDF