• 제목/요약/키워드: Ring shield

검색결과 21건 처리시간 0.024초

초고압 폴리머 부싱의 내부쉴드 형상에 따른 전계분포 특성 (Electric Field Distribution of High Voltage Polymer Bushing with Inner Field Shaper Designs)

  • 조한구;유대훈;강형경
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 추계학술대회 논문집 Vol.21
    • /
    • pp.369-370
    • /
    • 2008
  • This paper describes the electric field distribution of high voltage polymer bushing with inner field shaper designs. The field control can be achieved by means of the designs of such internal field shaper. But high electric stress occurred between field shaper and central conductor by the closely space. In accordance, the floating and ring shield designs was importance for electric stress grading at critical parts of the bushing. The bushing has a central conductor, and internal ring shield or floating shield, gaps are formed between field shaper and ring shield. Accordance equipotential lines extend through gaps. Maxwell 2D simulator based on the boundary element method was also introduced in order to verify the reliability of the polymer bushing.

  • PDF

내부쉴드 구조에 따른 컴팩트한 폴리머 부싱 설계에 관한 연구 (A Study on the Design of Compact Polymer Bushing with Inner Control Shield)

  • 조한구;유대훈;강형경
    • 한국전기전자재료학회논문지
    • /
    • 제22권5호
    • /
    • pp.436-442
    • /
    • 2009
  • This paper describes a study on the design of compact polymer bushing with inner control shield. In the bushing, a high electric stress occurred between field shaper and central conductor by the closely space. Also coaxial cylindrical shield has a great height along the axis to control an electric field. Consequently, all the potentials are raised axially along the field shaper and electric stress is concentrated on a part of the surface of the FRP tube near the upper end of the field shaper. In accordance, the field control can be achieved by means of the designs of such inner control shields. The floating and ring shield designs was decreased electric field concentration at critical parts of the bushing. The shield gaps is formed between field shaper and ring shield. Accordance equipotential lines extend through gaps. As a result, the resulting electrical stress are thus reduced in the range $17{\sim}23%$ in the bushing with floating and ring shield designs. Maxwell 2D simulator based on the boundary element method was also introduced in order to verify the reliability of the polymer bushing. The optimized design uses internal elements for electric stress grading at critical parts of the bushing.

액체질소를 사용하는 초전도 고전압 전력기기의 절연 특성 연구 (Analytical and Experimental studies on Dielectric Characteristics of High Voltage Superconducting Machines in Liquid Nitrogen)

  • 나진배;고태국;강형구;석복렬;김태중
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제13권1호
    • /
    • pp.46-50
    • /
    • 2011
  • The electrical insulation design of high voltage superconducting fault current limiters (SFCLs) should be confirmed to be applied for the stabilization of the power grid. This paper describes numerical analysis and AC dielectric experiments for developing high voltage SFCLs. The electric field distributions between applied high voltage part and ground were calculated by finite element method (FEM) simulation tool and AC criterion of liquid nitrogen at 200 kPa was calculated from correlation between the field utilization factor and FEM simulation results. This paper deals with ceonceptual insulation design of a 154 kV class single-phase no-inductively wound solenoid type SFCL which was focused on gap distance between the cryostat and superconducting coils. Furthermore, the shield ring effect was confirmed to reduce maximum electric field at applied high voltage part.

쉴드 터널 세그먼트 라이닝의 부재력 산정법 비교연구 (A comparative study on methods for shield tunnel segment lining sectional forces)

  • 유충식;전훈민
    • 한국터널지하공간학회 논문집
    • /
    • 제14권3호
    • /
    • pp.159-181
    • /
    • 2012
  • 본 논문에서는 쉴드 터널 세그먼트 라이닝의 부재력을 산정하는 방법에 대한 비교연구를 다루었다. 현재 쉴드 터널 라이닝의 부재력 산정에는 이론해에 근거한 산정식을 적용하고 있다. 쉴드 터널 시공 시 사용되는 콘크리트 세그먼트는 동일한 강성으로 이루어진 구조물이 아닌 이음부를 가지는 구조물이므로 모든 요소를 고려하여야 하나 현재의 설계 실무에서는 세그먼트라이닝의 구조해석 모델이나 설계하중 및 세그먼트 이음부의 영향 등에 대한 정확한 검증 없이 과거의 국내외의 설계 자료를 관행적으로 적용해왔다. 따라서 본 연구에서는 국내외에서 현재 사용하고 있는 쉴드 터널 세그먼트 해석 및 설계 모델 중 관용계산방법과 Duddeck & Erdmann 모델을 이론식으로 해석을 수행하여 비교 하였고 수치해석에 의한 설계모델 중 보-스프링 모델과 연속체모델의 해석을 수행하여 상호 비교를 통해 세그먼트 라이닝의 설계에 적합한 구조모델을 검토하였다.

Leadframe SiP with Conformal Shield

  • Kim, ByongJin;Sim, KiDong;Hong, SeoungJoon;Moon, DaeHo;Son, YongHo;Kang, DaeByoung;Khim, JinYoung;Yoon, JuHoon
    • 마이크로전자및패키징학회지
    • /
    • 제23권4호
    • /
    • pp.31-34
    • /
    • 2016
  • System In Package (SiP) is getting popular and momentum for the recent wearable, IoT and connectivity application apart from mobile phone. This is driven by market demands of cost competitive, lighter and smaller/thinner and higher performance. As one of many semiconducting assembly products, Leadframe product has been widely used for low cost solution, light/ small and thin form factor. But It has not been applied for SiP although Leadframe product has many advantages in cost, size and reliability performance. SiP is mostly based on laminate substrate and technically difficult on Leadframe substrate because of a limitation in SMT performance. In this paper, Leadframe based SiP product has been evaluated about key technical challenges in SMT performance and electrical shield technology. Mostly Leadframe is considered not available to apply EMI shield because of tie-bar around package edge. In order to overcome two major challenges, connection bars were deployed properly for SMT pad to pad and additional back-side etching was implemented after molding process to achieve electrical isolation from outer shield coating. This product was confirmed assembly workability as well as reliability.

쉴드 TBM터널 상부 지반 연약대 전기탐사 (Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling)

  • 정현기;박철환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

Full-scale testing and modeling of the mechanical behavior of shield TBM tunnel joints

  • Ding, Wen-Qi;Peng, Yi-Cheng;Yan, Zhi-Guo;Shen, Bi-Wei;Zhu, He-Hua;Wei, Xin-Xin
    • Structural Engineering and Mechanics
    • /
    • 제45권3호
    • /
    • pp.337-354
    • /
    • 2013
  • For shield TBM (Tunnel Boring Machine) tunnel lining, the segment joint is the most critical component for determining the mechanical response of the complete lining ring. To investigate the mechanical behavior of the segment joint in a water conveyance tunnel, which is different from the vehicle tunnel because of the external loads and the high internal water pressure during the tunnel's service life, full-scale joint tests were conducted. The main advantage of the joint tests over previous ones was the definiteness of the loads applied to the joints using a unique testing facility and the acquisition of the mechanical behavior of actual joints. Furthermore, based on the test results and the theoretical analysis, a mechanical model of segment joints has been proposed, which consists of all important influencing factors, including the elastic-plastic behavior of concrete, the pre-tightening force of the bolts and the deformations of all joint components, i.e., concrete blocks, bolts and cast iron panels. Finally, the proposed mechanical model of segment joints has been verified by the aforementioned full-scale joint tests.

발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례 (Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area)

  • 박진수;전삼수
    • 한국터널지하공간학회 논문집
    • /
    • 제24권6호
    • /
    • pp.637-658
    • /
    • 2022
  • 쉴드TBM 터널은 지반 굴착, 세그먼트 링 빌드(Segment ring-build), 뒷채움의 반복적인 공정으로 단순하다. 재래식 터널공법인 발파공법(Drill and Blast)은 막장관찰, 천공, 장약, 발파, 환기, 버력처리, 지보재 설치의 반복으로 쉴드TBM 터널보다 공정이 복잡하고 일부 제약조건이 따른다. 하지만 굴진을 위한 준비 작업은 지반을 보강하고 갱문조성 후 터널을 형성해 나가는 Drill and Blast에 비해서 쉴드TBM 터널은 매우 상세한 계획을 바탕으로 시간과 비용이 필요하다. 이는 대상지반을 굴착하는 쉴드TBM 장비의 성능 확보가 공사의 성패를 좌우하기 때문인데, 고가의 주문제작 장비인 쉴드TBM이 조립단계에서 잘못 구성되면 본 굴진은 물론 초기굴진 단계에서부터 구동이 어렵게 되고, 조립된 쉴드TBM 장비를 다시 해체하는 경우가 발생하게 되어 재조립하는 상황으로 진행되면, 공기는 물론 경제적인 손실이 발생하여 공사 기간 내내 어려움이 발생한다. 이에 본 연구에서는 한강 하저를 통과하는 국내 최대 직경의 도로터널을 건설하기 위한 이수식 쉴드TBM 조립을 위한 발진부지의 배치와 계획, 쉴드TBM 장비의 주요 부분별 조립공정을 검토하였고, 타공정과 의 간섭 최소화 및 커터헤드 조립과 운반의 효율성을 분석하여 현장여건에 맞게 개선하여 적용하였다.

세그먼트 라이닝의 열차 진동하중에 대한 동적 응답특성 (Dynamic response of segment lining due to train-induced vibration)

  • 이경주;송기일
    • 한국터널지하공간학회 논문집
    • /
    • 제25권4호
    • /
    • pp.305-330
    • /
    • 2023
  • 쉴드TBM 터널은 NATM 터널과 달리 라이닝이 세그먼트로 분절되어 있다. 따라서 라이닝에 동일 하중이 발생되어도 NATM 터널 라이닝과 쉴드TBM 터널 라이닝의 응력 분포가 다르게 발생된다. 쉴드TBM 터널에서 라이닝에 발생되는 응력을 분석하는 대표적 방법은 연결부를 고려하지 않는 강성일체법과 링간 이음 및 세그먼트 연결을 고려하는 2링 빔스프링 모델이 있다. 본 연구는 라이닝 분절 Segmentaion을 고려한 Break-joint Mode 해석 방법이지만 세그먼트 라이닝 연결부의 구조적 역할을 고려하지 않고 마찰력 성분인 수직강성과 전단강성 만 도입된 쉘 인터페이스 요소를 이용한 모델링을 적용하여 진동하중 발생 시 라이닝의 응력 및 변위에 대한 응답결과를 분석했다. 토압 등 정적 하중에 대해 천 정부에서 가장 큰 응력이 발생되는 강성일체법과 달리 본 연구의 해석방법에 의해 발생된 세그먼트 라이닝 응력 분포는 세그먼트 연결부가 집중된 천정부 Key 세그먼트에서 가장 작은 응력이 발생하였고 연결부를 경계로 응력의 분포가 뚜렷이 구분되었다. 그리고 정적 해석 결과는 강성일체법에 발생된 라이닝 응력이 본 연구 방법에 의해 발생된 세그먼트 라이닝의 응력에 비해 최대 7배의 큰 응력이 발생되었다. 이러한 결과는 세그먼트 연결부를 고려한 기존의 2링 빔-스프링 모델의 응력분포 양상과 일치하는 결과다. 그러나 열차 진동하중에 대한 응력값은 Break-joint Mode로 해석한 본 연구방법의 응력이 강성일체법에 비해 더 큰 응력을 발생되었다. 이는 짧은 부재들의 조합으로 이루어진 세그먼트 Ring이 원주방향으로 일체로 되어 부재의 길이가 상대적으로 더 긴 강성일체법 결과에 비해 더 작은 응력이 발생되는 정역학적 개념과 상이한 결과다. 진동하중에 대해 Break-joint Mode에서 세그먼트 라이닝에 응력이 더 크게 발생된 원인은 부재의 고유주기, 감쇠비 등 동역학적 요인의 차이보다는 열차 진동하중에 대해 라이닝에 발생되는 변위의 차이에 기인하는 것으로 판단되지만 이에 대한 증명은 추후의 과제로 남겨두었다. 본 연구 방법의 Break-joint Mode를 이용하면 정지상태의 열차 하중에 의해 발생되는 라이닝의 응력과 변위값을 비교하여 쉴드TBM 터널의 충격계수(DIF)를 비교적 간단하게 추정할 수 있다. 본 연구는 쉴드TBM 터널의 Segmentaion을 고려한 3차원 모델링으로 추후 지진파 등 다양한 하중조건의 검토를 통해 기존 해석방법 결과와 비교하여 모델링의 추가적 신뢰성을 확보할 필요가 있다.

Nonlinear simulation of tunnel linings with a simplified numerical modelling

  • Zhao, Huiling;Liu, Xian;Bao, Yihai;Yuan, Yong
    • Structural Engineering and Mechanics
    • /
    • 제61권5호
    • /
    • pp.593-603
    • /
    • 2017
  • A high-efficiency simplified modelling approach is proposed for investigating the nonlinear responses of reinforced concrete linings of shield tunnels. Material and geometric nonlinearities are considered in the analysis of the lining structures undergoing large deformation before ultimately losing the load-carrying capacity. A beam-spring element model is developed to capture the force-transfer mechanism between lining segments and radial joints. The developed model is validated by comparing analyzed results to experimental results of a single-ring lining structure under two loading conditions: the ground overloading and the lateral unloading respectively. The results show that the lining structure under the lateral unloading due to excavation on the both sides of the tunnel is more vulnerable compared to the case of ground overloading on the top of the tunnel. A parameter study is conducted and results indicate that the lateral pressure coefficient has the greatest influence on the behaviour of the lining structure.