• Title/Summary/Keyword: Restoration site

Search Result 816, Processing Time 0.028 seconds

Case Study of the Early Stage Vegetation Recovery with Soil Property in the Roadside Slopes of the Expressway (고속도로 비탈면 녹화공법 시험시공지의 토질조건별 초기 녹화효과 사례연구)

  • Jeman Lee;Kyung-Hoon Kim;Gi-Seong Jeon;Sangjun Im
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.2
    • /
    • pp.47-59
    • /
    • 2023
  • This study investigated and analyzed the effects of vegetation on the roadside slopes at the expressway construction sites in order to evaluate the vegetation recovery regarding soil type and revegetation technique. We selected two study sites with an area of 1,000 m2 located in the construction sites of the Korea Expressway Corporation, named Hwado-Yangpyeong Expressway Section 3 and Saemangeum-Jeonju Expressway Section 7. The revegetation was monitored in three plot groups (earth, soft rock, and hard rock slopes), and scored based on the guideline of the Ministry of Land, Transport and Maritime Affairs. The revegatation was generally lower in the Hwado-Yangpyeong site than that of the Saemangeum-Jeonju site. The field monitoring indicated that the revegetation varied with slope aspect and environmental characteristics between plots. the Saemangeum-Jeonju site showed a high overall evaluation score, but there was a slight difference in the score for each plot. This seems to be due to the differences in geographical conditions, construction methods, and site environment between two sites. This study can provide basic information to understand the short-term effects of revegetation techniques in the roadside slopes.

Urban Stream Landscape Improvement After Natural-Style Stream Restoration - Case Study of Yangjae Stream, Seoul - (도시 자연형하천 공사 후의 경관개선방안 - 서울시 양재천을 사례로 -)

  • Kim, Sun-Gun;Kim, Go Eun;Lee, Ji Eun;Shin, Dong-Hoon;Lee, Kyoo-Seock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.5
    • /
    • pp.66-74
    • /
    • 2004
  • Since 1960s urban streams in Seoul have been dried and polluted because of urbanization. So, these devastated urban stream environment need to be restored for the better life of residents. Since 1995 stream restoration project which is called Natural-Style Stream Project have begun. However, some projects focused on the restoration of park-style open space rather than restoration of stream environment. As a result there are some stream landscapes to be improved. Therefore, this study aims to investigate the current status of urban stream landscape after Natural Style Stream Project and to propose the alternatives for the urban stream landscape improvement. The study site is Yangjae stream, Seoul.

A case study on slope restoration work in In-je to Yang-yang national roadway No.44 (국도 44호선 인제-양양간 수해복구공사 깎기 비탈면 설계 및 시공사례)

  • Yoo, Jai-Sung;Cheong, Sam-Yong;Park, Hun-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1-13
    • /
    • 2010
  • Numerous landslides had occurred in Kangwondo in July 2006 and several restoration works had been done. A-day-accumulative rainfalls from July 12 to July 13 and July 15 to July 16 were 176mm and 202mm respectively. Disaster sites at which slope failures were studied to main causes of slope failures by investigating characteristics of rainfall, geological formation, topography and ground surface exploration around the boundary of landslides. In this study, a series of slope restoration work process is presented for reference which about the landsliding area in Han-Gye-Ryeong to O-Saek in Kwangwon-do where one of the most severe damaged area in 2006. The slope restoration work process includes site investigation, analysis on affected factor, restoration or reinforcing method design, construction procedure and recent status of that area. Also several considering points are suggested while design and construction for the reference at the other restoration works.

  • PDF

A Study on Repairing and Preservation of the Early Western Style Architecture in Korea - Focused on the Case Study on the Church Buildings Which are Registered as National Cultural Properties - (초기 양식건축물의 보수.보존에 관한 연구 -국가 지정 교회건축 문화재의 현황조사를 중심으로-)

  • Kim, Jung-Shin
    • Journal of architectural history
    • /
    • v.10 no.2 s.26
    • /
    • pp.55-71
    • /
    • 2001
  • This study reviewed the preservation status of the Early Western Style Architecture in Korea based on the on-site research of church buildings which are registered as National Cultural Properties. I have investigated 21 church buildings regarding the frequency, content and concept of restoration. The results are summarized as follows First, the churches have been restored extensively in every 17 years on the average. Second, the main restorations are replacement of bricks, painting, waterproofing, repair of roof and timber. And the main changes are extension of plan, removal of Interior posts, and replacement of floor. Third, the main concept of restorations are historical restoration(62%), critical restoration(23%), stylistic restoration(14%). Forth, the category of restoration have been changed, that is extending of incompletion (1st stage), functional improvement and extension of the span of life(2nd stage), improvement of facilities(3rd stage), restoration to the original state and conservation(4th stage). Fifth, the issues of repairing techniques are revival and replacement of weathered bricks, the removal of painting, and structural reinforcement. This study will be able to be used as the fundamental materials to improve the techniques of restoration of Early Western style masonry buildings.

  • PDF

Vegetation Restoration Plan for a Coastal Area through Ecosystem Conservation Fund Return Project: - focus on the Dalmaji-gil area, Haeundae-Gu, Busan Metropolitan City. - (생태계보전협력금 반환사업을 통한 해안 식생복원계획 - 부산 해운대구 달맞이 고개 일대를 대상으로 -)

  • Yoon, sung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.2
    • /
    • pp.191-201
    • /
    • 2019
  • This study suggested a vegetation restoration plan for a coastal area where the ecosystem conservation fund return project, targeting the whole area of Dalmaji-gil, located in Haeundae, Busan. After distinguishing if it would be a proper site for the operation of the ecosystem conservation fund return project by analyzing the ecological environment, human environment, and the current status of land owners, the target species for vegetation restoration was determined, and the facilities and programs were selected in accordance with the spatial division of the biosphere reserve. The basic direction is as follows. First, is the expansion of green space and the securement of life habitats downtown. Second, is the conservation of core areas by separating the conserved area from the space for use. Third, is the establishment of ecological resting space and the reinforcement of an ecological educational programs. The significance of this study is to suggest a vegetation restoration plan of a coastal area, fully utilizing the existing vegetation of the subject area, by suggesting the land use and flow planning, environmental improvement (vegetation restoration) plan, life habitats establishment plan, planting plan, and hydrologic plan, facilities, maintenance, and monitoring plan based on the basic direction. This study would provide useful basic data for ecosystem conservation and restoration in the Korean Peninsula, surrounded by the ocean on three sides.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

A study on the estimation of hydrologic function for ecological restoration at forested wetland (산지습지의 생태적 복원을 위한 수문학적 기능 평가에 관한 연구)

  • Jung, Yu-Gyeong;Kang, Won-Seok;Lee, Heon-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.3
    • /
    • pp.97-111
    • /
    • 2022
  • This study was conducted as restoration work to improve the discharge in forested wetlands where there is a concern of damage and observed changes in the discharge and groundwater level. The monthly changes showed that during the wet season, the amount of discharge decreased after restoration and GWL increased. It showed that during the dry season, the GWL and discharge increased. The increased discharge after restoration seems to be the difference in the number of days with no rainfall duration. The change in discharge for each unit of rainfall showed a tendency to increase the baseflow and decrease the direct discharge after restoration. The recharge ratio of GWL showed a decreasing tendency as rainfall was higher. After restoration, it showed a higher tendency under rainfall with less than 20mm. It has been confirmed that the restoration implemented by the study caused such an effect as the increased baseflow and increased GWL. It would be an effective restoration method to maintain water resources in forested wetlands. In the initial rainfall, it demonstrated a certain level of effect, but it is necessary to develop a restoration technology that can decrease the amount of water discharged after the end of rainfall or during the period of no rainfall to protect and maintain the forested wetlands. Streamflow should be identified by each type of terrain of wetlands and a proper restoration countermeasure should be devised for the site where the discharge frequently occurs.

An Ecological Restoration of Treatment Wetland and Urban Upper Stream for Reusing Sewage Treatment Water - In the case of Sustainable Structured Wetland Biotop System at Upper Part of Jaemin Stream in Gongju-si, Korea - (하수처리수의 재이용을 위한 처리습지 및 도시 상류하천 생태환경복원 - 공주시 제민천 생태적수질정화비오톱을 중심으로 -)

  • Byeon, Chan-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.17 no.5
    • /
    • pp.65-77
    • /
    • 2014
  • The ecosystem of Jaemin stream, flowing into the center of Gongju-si, had been damaged by low water quality and lack of water quantity of the steam. However, after applying the SSB (Sustainable Structured wetland Biotop) system to the flood plain and the upstream of Jaemin stream, the efficiency of ecological water purification and ecological restoration are as follows. Through the constant maintenance and monitoring from year 2009 to year 2013 after restorative design and construction the average influent concentration of BOD5 was 4.2 mg/L, and the average effluent concentration was 1.8 mg/L, reaching ecological water purification rate of 57%. As for the T-N, the average influent concentration was 9.983 mg/L, and the average effluent concentration was 6.303 mg/L, showing the rate of 37%. For the T-P, the average influent concentration was 0.198 mg/L, and the average effluent concentration was 0.098 mg/L, being the rate of 51%. The vegetation of Jaemin stream monitored for 2 years after the restoration was composed of 51 species in 28 families which show high ratio of planted native species. As for the animals in the site, 5 species in 3 families of reptiles and amphibians, 34 species of 23 families of birds, and 3 species in 2 families of mammals were monitored, indicating that the bio-diversity of the site has improved, as well.

A Study on the Use of a Continuous Fiber Soil Reinforcement System to Revegetate a Cut Slope (비탈면의 생태복원을 위한 연속섬유보강토의 적용성에 관한 연구)

  • Koh, Jeung-Hyun;Hur, Young-Jin;Lee, Yong-Gu;Kim, Nam-Choon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.73-83
    • /
    • 2010
  • A technology using continuous fiber soil reinforcement system for the creation of ecological restoration in a damaged area has been developed and introduced. The continuous fiber soil reinforcement system (Geofiber system) is an environmentally friendly slope protection technique that continuous fiber soil reinforced layers are constructed with green plantation on cut slope. The characteristics of this system in terms of the strength and hydraulic performance, and the vegetation were investigated in this study. The main objectives of this comparative study was to quantify the potential contribution of geofiber system for the revegetation on the cut slope in a damaged area. A Geofiber system was constructed to reinforce the lower layer of slopes and revegetation methods including wood chips were carried out on the upper layer by machineries. The results of monitoring during 3 years on cut slopes were as follows : 1) All the quadrat existed in the proper range for vegetation. 2) Species richness was 4.4 (site-1) and 18.5 (site-2) respectively. 3) The averaged coverage rates of quadrats was 90%. It is remarkable that the continuous fiber soil reinforcement system would be capable of applying to a damaged area and also would serve maintaining a healthier environment for floras. However, it behooves to continue monitoring on succession of vegetation for ecological restoration.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.