• Title/Summary/Keyword: Resource Block

검색결과 223건 처리시간 0.02초

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

안전한 센서 네트워크를 위한 스트림 암호의 성능 비교 분석 (Performance Analysis and Comparison of Stream Ciphers for Secure Sensor Networks)

  • 윤민;나형준;이문규;박근수
    • 정보보호학회논문지
    • /
    • 제18권5호
    • /
    • pp.3-16
    • /
    • 2008
  • 무선 센서 네트워크는 센서 노드 또는 모트(mote)라 불리는 소형 장치들로 이루어진 무선 네트워크이다. 최근 센서 네트워크에 대한 연구가 활발한 가운데 센서 네트워크에서의 보안에 관한 연구 또한 활발히 진행되고 있다. 센서 노드 및 센서 네트워크 상의 정보를 안전하게 저장, 전송하기 위해서는 암호 알고리즘의 구현이 필요하며, 이 암호 알고리즘들은 센서 노드의 한정된 자원을 효과적으로 활용할 수 있도록 효율적인 구현이 필수적이다. 센서 노드 상에서 이용될 수 있는 암호로는 TinyECC 등의 공개키 암호와 AES와 같은 표준 블록 암호가 있으나, 스트림 암호는 최근에서야 eSTREAM 프로젝트에서 표준화가 완료되어 아직 센서 노드상에서 사용 가능성이 명확하지 않은 실정이다. 이에 본 논문에서는 eSTREAM의 2단계와 3단계에 채택되었던 10개 소프트웨어 기반 암호들 중 9개의 암호들을 MicaZ 모트 상에 구현하여 성능을 비교하고, 특히 최종적으로 eSTREAM에 채택된 SOSEMANUK, Salsa20, Rabbit을 포함한 6개 암호에 대해서는 MicaZ에 적합하도록 최적화하였다. 또한 참조 구현으로써 하드웨어용 스트림 암호 및 AES-CFB에 대한 실험 결과도 제시한다. 본 논문의 실험에 따르면, 대부분의 스트림 암호가 약 31Kbps - 406Kbps의 암호화 성능을 보임으로써 센서 노드에서 사용하기에 큰 무리가 없음을 확인할 수 있었다. 특히 최종적으로 채택된 SOSEMANUK, Salsa20, Rabbit의 경우 센서 노드에 적합한 128바이트 크기의 작은 패킷의 암호화에서 각각 406Kbps, 176Kbps, 121Kbps의 속도를 보여주고, 70KB, 14KB, 22KB의 ROM및 2811B, 799B, 755B의 RAM을 사용함으로써, 106Kbps의 속도를 보여준 소프트웨어 기반 AES에 비해 우수한 성능을 보임을 알 수 있었다.

한국(韓國) 및 관련각국((關聯各國)의 다랑어 선망어업(旋網漁業) 발달과정(發達過程) (Development of Tuna Purse Seine Fishery in Korea and the Countries Concerned)

  • 현종수;이병기;김형석;예영희
    • 수산해양교육연구
    • /
    • 제4권1호
    • /
    • pp.30-46
    • /
    • 1992
  • 한국(韓國)의 다랑어 선망어업기술(旋網漁業技術)은 한국(韓國)에서 발달한 대부분의 어업기술(漁業技術)이 일본(日本)을 거쳐서 도입된 것과는 달리 미국(美國)에서 직수입(直輸入)된 것이기는 하나 세부적으로는 일본(日本)의 기술을 응용한 것도 더러 있다. 따라서 한국(韓國)의 다랑어 선망어업(旋網漁業)의 발달과정(發達過程)을 규명하기 위해서는 미국(美國)과 일본(日本)에 있어서의 발달과정(發達過程)을 규명할 필요가 있으므로 여러 가지 문헌(文獻)과 집적된 자료(資料)들에 의하여 그것을 규명해 보았다. 미국(美國)에 있어서의 선망어법(旋網漁法)의 탄생은 1826년의 일이므로 그 역사는 165년이나 되었고, 초기에는 다른 어종과 함께 부산물(副産物)로서 잡아왔지만 1903년부터는 그것을 주목적으로 하는 어업(漁業)이 시작되었으므로 그 역사만 하더라도 90년 쯤 전의 일이다. 그러다가 2차대전(次大戰) 이후에 power block의 발명과 나일론 그물, 그리고 어선(漁船)과 장비(裝備)의 첨단적인 개량으로 오늘날과 같은 대형선망조업(大形旋網조業)이 가능하게 되었다. 그러나 그 후 미국선망어선(美國旋網漁船)들은 돌고래 보호를 위한 규제 때문에 동부태평양(東部太平洋)에서는 조업이 불가능하게 되었고, 또 고임금(高賃金), 노동력부족(勞動力不足) 등으로 채산(採算)을 맞추지 못해 선단수(船團數)는 1980년에 비해 1/3가량 줄어든 상태이다. 일본(日本)은 일찍부터 일본(日本) 북서태평양연안(北西太平洋沿岸)에서 연승(延繩)과 소형선망(小型旋網)으로써 다랑어를 어획(漁獲)하여 왔으며, 2차대전(次大戰)이후 독자적으로 과거의 선망어법(旋網漁法)을 다랑어용으로 개량하는 한편 1948년부터 미국식선망어법(美國式旋網漁法)을 도입하여 해외(海外) 다랑어 어장(漁場) 개발에 많은 노력을 기울였다. 특히 정부출자기관(政府出資機關)인 일본해양자원개발(日本海洋資源開發) 센터 (JAMARC)의 태평양(太平洋) 해역에서의 시험탐사(試驗探査)는 높이 평가할 만 하며, 또한 일본연승어선(日本延繩漁船)들의 활발한 해외조업(海外操業)과 어장정보교환(漁場情報交換)은 선망어업(旋網漁業)의 발전에 많은 도움을 주어 왔다. 미국(美國)과 일본(日本)의 선망선(旋網船)은 어선(漁船)의 크기, 조업형태(操業形態), 운영형식(運營形式) 등이 각기 다르며 장단점이 있다. 특히 일본어선(日本漁船)은 미국어선(美國漁船)에 비하여 선체가 작고 더러는 쌍두리 조업을 하고 있으며, 망지(網地)는 미국어선(美國漁船)이 땋은 실 nylon(braided twine)으로 된 결절망지(結節網地)를 쓰는 데 비하여 무결절망지(無結節網地)를 쓴다. 한국(韓國)은 1970년대(年代)에 미국(美國)으로부터 직접 이 어선(漁法)을 도입하였고, 어선(漁船)과 장비(裝備), 조업방법(操業方法)도 전적으로 미국식(美國式)이다. 한국(韓國)의 선망어법(旋網漁法)은 10년 이상의 실패 끝에 1986년부터 정상 궤도에 오르기 시작했고, 1997년 현재 총 37척이 Gua과 Samoa를 기지(基地)로 하여 모두 남서태평양(南西太平洋)에서 조업하고 있으며 성적도 좋은 편이다. 다만, 이제는 독자적인 연구가 필요하며, 태평양도서국(太平洋島嶼國)에의 입어문제(入漁問題)와 어자원보호(魚資源保護) 측면에서의 연안국(沿岸國)의 조업제제(操業規制) 움직임에 대해서도 대비할 필요가 있는 것으로 판단된다.

  • PDF