• Title/Summary/Keyword: Reservoirs

Search Result 1,324, Processing Time 0.028 seconds

Behavior of Failure for Embankment and Spillway Transitional Zone of Agriculture Reservoirs due to Overtopping (농업용 저수지 월류시 제체와 여수토 접속부의 붕괴거동)

  • Noh, Jae Jin;Lee, Dal Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.1
    • /
    • pp.71-79
    • /
    • 2014
  • In this study, an experiment with large-scale model was performed according to raising the embankment in order to investigate the behavior of failure for embankment and spillway transitional zone due to overtopping. The pore water pressure, earth pressure, settlement and failure pattern by a rapid drawdown and overtopping were compared and analyzed. The pore water pressure and earth pressure at spillway transitional zone by overtopping increased a rapidly with the expansion of seepage erosion, but the crest showed a smally change due to effect of the inclined core type. And it is considered an useful data that can accurately estimate the possibility of failure of the reservoirs. A settlement at overtopping decreased a rapidly due to failure of crest. The relative settlement difference due to change of the water level at the upstream and downstream slope cause increase largely crack of crest. The behavior of failure by overtopping was gradually enlarged towards reservoirs crest from the bottom of the spillway transition zone, the inclined core after the raising the embankment was influenced significantly to prevent the seepage erosion.

Water Quality of the Agricultural Reservoirs in Boryung Watershed (보령담수호 유역내 농업용저수지의 수질 변화)

  • Choi, Jin-Kyu;Son, Jae-Gwon;Koo, Ja-Woong;Kim, Young-Ju
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.89-98
    • /
    • 2001
  • This study was carried out to provide the basic informations for the water quality management in Boryung fresh water reservoir watershed. Four agricultural reservoirs were selected and the water qualify of the reservoirs were investigated from November 1998 to December 2000, periodically. Including storage rate, temporal variation of water quality constituents such as water temperature, pH, EC, total nitrogen, total phosphorus were analysed. The result showed that pH ranged $6.7{\sim}10.4$, EC $56.1{\sim}1079{\mu}S/cm$, COD $0.75{\sim}8.0mg/L$, respectively. And, total-N concentration affected by the livestock wastes and agricultural activity ranged from 0.21 to 4.66mg/L and which was almost over the agricultural water quality standard(1.0mg/L). Total-P ranged from 0.001 to 0.080mg/L as lower than the agricultural water quality standard(0.1mg/L).

  • PDF

A Study on Design Factors of Air Diffuser Systems in Reservoirs: Application of Field Conditions to the CFD Simulation (산기식 물순환장치 설계인자 연구: 현장 댐 조건을 고려한 CFD 해석 중심)

  • Shin, Sang-Min;Lee, Seung-Jae;Lee, Sang-Eun;Park, Hee-Kyung;Yum, Kyung-Taek
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.2
    • /
    • pp.161-169
    • /
    • 2011
  • This study aims at examining the design factors of the air diffuser system in a particular view of field conditions, and thus improving the procedures currently applied to design the system. First, the CFD model is built for an air diffuser system suitable for field conditions of real reservoirs. Then, the design factors, including destratification number, destratification radius and efficiency of the air diffuser system, are analyzed after a series of simulations over various field conditions. The result shows successful correlations of design factors with DN at the condition, and they lead to estimate of the destratification radius and efficiency of air diffuser system based on DN. It is finally concluded that the design factors are improved such that the air diffuser system is suitable for the field conditions of dam reservoirs.

Development of Optimal Operation Rule for Multipurpose Reservoirs System (다목적댐의 연계운영을 위한 최적 운영률 개발)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.6
    • /
    • pp.487-497
    • /
    • 2004
  • Adding important new projects such as reservoirs which regulate a river discharge to a river system, existing operation methods should be changed considering these conditions. Since an original operation rule used for an existing system has been designed to be compatible to inputs and outputs of the existing system, the operation rule should be changed to consider the new projects. In this study, the technique of constructing new operation rules considering objectives of both old and new projects is suggested when new project is added to the river system. Reservoir operation rule using both stochastic inflow and optimization technique is developed. As a result of applying the technique to Geum river basin, the efficiency of the technique is verified.

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF

Uncertainty of Water Supply in Agricultural Reservoirs Considering the Climate Change (미래 기후변화에 따른 농업용 저수지 용수공급의 불확실성)

  • Nam, Won-Ho;Hong, Eun-Mi;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.2
    • /
    • pp.11-23
    • /
    • 2014
  • The impact and adaption on agricultural water resources considering climate change is significant for reservoirs. The change in rainfall patterns and hydrologic factors due to climate change increases the uncertainty of agricultural water supply and demand. The quantitative evaluation method of uncertainty based on agricultural water resource management under future climate conditions is a major concern. Therefore, it is necessary to improve the vulnerability management technique for agricultural water supply based on a probabilistic and stochastic risk evaluation theory. The objective of this study was to analyse the uncertainty of water resources under future climate change using probability distribution function of water supply in agricultural reservoir and demand in irrigation district. The uncertainty of future water resources in agricultural reservoirs was estimated using the time-specific analysis of histograms and probability distributions parameter, for example the location and the scale parameter. According to the uncertainty analysis, the future agricultural water supply and demand in reservoir tends to increase the uncertainty by the low consistency of the results. Thus, it is recommended to prepare a resonable decision making on water supply strategies in terms of using climate change scenarios that reflect different future development conditions.

Development of Decision System for Determining Priorities of Re-construction Reservoirs (농업용저수지 재개발을 위한 우선순위 선정시스템 개발)

  • Lee, Gwang-Ya;Kim, Hae-Do;Jeong, Gwang-Geun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.26-31
    • /
    • 2005
  • In national prospective, the needs to develop water resources has been increased due to water shortage from diverse use of water resources in agricultural areas. Existing agricultural water demand, which has mainly been limited to the use of farming, are now expanding to diverse water uses such as supporting daily lives, diluting environmental pollution as well as industrial use for agricultural complex currently under construction in agricultural region. In this situation, for the sake of effective procurement of water resources and supply method, it is definitely required to enhance the effectiveness of budget investment and project proceedings through integrated re-development which links projects to strengthen existing dams, reservoirs and hydraulic facilities. The major scopes of this research includes developing different types of system such as selecting potential sites to re-construct reservoirs including generating base maps and thematic maps, data collection regarding water demands and reservoir status; analyzing reservoir data; estimating developable capacity and index calculation; and forecasting inundated areas. In addition, this study provides other products such as developing output generation system which can support wide use of data built and analyzed; database generation for better data management; data analysis including selection, extraction, indexation, and calculation of base items through standardization; data security system prohibiting exterior proliferation and malicious manufacturing of data.

  • PDF

A Study on Development of Program for Estimating Reservoirs Outflow using Genetic Algorithm (유전자알고리즘을 이용한 저수지(貯水池)의 방류량(放流量) 추정(推定) 프로그램 개발 연구)

  • Ahn, Sang-Dae;Kim, Won-Il;Ahn, Byung-Chan;Ahn, Won-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.153-159
    • /
    • 2009
  • In order to estimate release water from reservoirs located on ungaged watersheds, an algorithm was suggested based on hydrologic reservoir routing and real time calibrating watershed parameters. A prototype - simple computer program was developed to implement the algorithm with Genetic Algorithm technic. The program was applied to a mid-size reservoir and its ungauged watershed area using observed rainfall data, spillway gates operation data and reservoir water stage time series data under a existing storm event. The result shows that the algorithm and the prototype would be useful to simulate released water from reservoirs.

The safety behavior of agricultural reservoirs due to raising the embankment

  • Lee, Dalwon;Lee, Younghak
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.243-252
    • /
    • 2013
  • This study was carried out to investigate safety evaluation of agricultural reservoirs due to raising the embankment. The seepage analysis and large-scale model test were performed to compare and analyze the pore water pressure(PWP), leakage quantity, settlement and piping phenomenon in the inclined core type and the vertical core type embankments. The PWP after raising the embankment showed smaller than before raising the embankment and the stability for piping after raising the embankment. The allowable seepage quantity and the allowable leakage for the steady state and transient conditions is within the range of safe management standard. After raising the embankment in the inclined core, there was no infiltration by leakage. For the vertical core, the PWP showed a large change by faster infiltration of pore water than in the inclined core. In a rapid drawdown, inclined core was remained stable but the vertical core showed a large change in PWP. Settlement after raising the embankment showed larger amounts of settlement than before raising the embankment. The leakage quantity before raising the embankment and the inclined core type showed no leakage. From the result, an instrument system that can accurately estimate a change of PWP shall be established for the rational maintenance and stabilization of raising the embankment for agricultural reservoirs.

Geothermal Power Generation using Enhanced or Engineered Geothermal System(EGS) (공학적인 지열시스템(EGS)을 이용한 지열발전 기술)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.3-32
    • /
    • 2008
  • The potential deep geothermal resources span a wide range of heat sources from the earth, including not only the more easily developed, currently economic hydrothermal resources; but also the earth's deeper, stored thermal energy, which is present anywhere. At shallow depths of 3,000~10,000m, the coincidence of substantial amounts heat in hot rock, fluids that heat up while flowing through the rock and permeability of connected fractures can result in natural hot water reservoirs. Although conventional hydrothermal resources which contain sufficient fluids at high temperatures and geo-pressures are used effectively for both electric and nonelectric applications in the world, they are somewhat limited in their location and ultimate potential for supplying electricity. A large portion of the world's geothermal resource base consists of hot dry rock(HDR) with limited permeability and porosity, an inadquate recharge of fluids and/or insufficient water for heat transport. An alternative known as engineered or enhanced geothermal systems(EGS), to dependence on naturally occurring hydrothermal reservoirs involves human intervention to engineer hydrothermal reservoirs in hot rocks for commercial use. Therefore EGS resources are with enormous potential for primary energy recovery using an engineered heat mining technology, which is designed to extract and utilize the earth's stored inexthermal energy. Because EGS resources have a large potential for the long term, United States focused his effort to provide 100GW of 24-hour-a-day base load electric-generating capacity by 2050.

  • PDF