• Title/Summary/Keyword: Reservoir operational purpose

Search Result 10, Processing Time 0.023 seconds

Investigation of water length effects on the modal behavior of a prototype arch dam using operational and analytical modal analyses

  • Sevim, Baris;Bayraktar, Alemdar;Altunisik, Ahmet Can
    • Structural Engineering and Mechanics
    • /
    • v.37 no.6
    • /
    • pp.593-615
    • /
    • 2011
  • This study determines the water length effects on the modal behavior of a prototype arch dam using Operational and Analytical Modal Analyses. Achievement of this purpose involves construction of a prototype arch dam-reservoir-foundation model under laboratory conditions. In the model, reservoir length was taken to be as much as three times the dam height. To determine the experimental dynamic characteristics of the arch dam using Operational Modal Analysis, ambient vibration tests were implemented for empty reservoir and three different reservoir water lengths. In the ambient vibration tests, the dam was vibrated by natural excitations provided from small impact effects and the response signals were measured using sensitive accelerometers. Operational Modal Analysis software process signals collected from the ambient vibration tests, and Enhanced Frequency Domain Decomposition and Stochastic Subspace Identification techniques estimated modal parameters of the dams. To validate the experimental results, 3D finite element model of the prototype arch dam was modeled by ANSYS software for empty reservoir and three different reservoir water lengths, and dynamic characteristics of each model were determined analytically. At the end of the study, experimentally and analytically identified dynamic characteristics compared to each other. Also, changes on the natural frequencies along to water length are plotted as graphs. Results suggest that reservoir water complicates the modal behavior of the arch dam significantly.

Experimental evaluation of crack effects on the dynamic characteristics of a prototype arch dam using ambient vibration tests

  • Sevim, Baris;Altunisik, Ahmet Can;Bayraktar, Alemdar
    • Computers and Concrete
    • /
    • v.10 no.3
    • /
    • pp.277-294
    • /
    • 2012
  • The aim of the study is to determine the modal parameters of a prototype damaged arch dam by operational modal analysis (OMA) method for some damage scenarios. For this purpose, a prototype arch dam-reservoir-foundation model is constructed under laboratory conditions. Ambient vibration tests on the arch dam model are performed to identify the modal parameters such as natural frequency, mode shape and damping ratio. The tests are conducted for four test-case scenarios: an undamaged dam with empty reservoir, two different damaged dams with empty reservoirs, and a damaged dam with full reservoir. Loading simulating random impact effects is applied on the dam to crack. Cracks and fractures occurred at the middle of the upper part of the dams and distributed through the abutments. Sensitivity accelerometers are placed on the dams' crests to collect signals for measurements. Operational modal analysis software processes the signals collected from the ambient vibration tests, and enhanced frequency domain decomposition and stochastic subspace identification techniques are used to estimate modal parameters of the dams. The modal parameters are obtained to establish a basis for comparison of the results of two techniques for each damage case. Results show that approximately 35-40% difference exists between the natural frequencies obtained from Case 1 and Case 4. The natural frequencies of the dam considerably decrease with increasing cracks. However, observation shows that the filled reservoir slightly affected modal parameters of the dam after severe cracking. The mode shapes obtained are symmetrical and anti-symmetrical. Apparently, mode shapes in Case 1 represent the probable responses of arch dams more accurately. Also, damping ratio show an increase when cracking increases.

An Analysis on the Usage of Pumped Hydro Storage as a Non-Spinning Reserve Power (양수발전기의 대기예비력 활용방안 분석)

  • Jeong, Seung-Hoon;Chun, Yeong-Han
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.1-6
    • /
    • 2017
  • Total capacity of pumped hydro storage(PHS) in Korean power system reaches 4,700MW, though the share of it is about 4.56% of total capacity The Unit Commitment program, E-terracommit which is used for the operational purpose by KPX, includes the PHS model. But the model has a defect that it does not include the information of water level of upper reservoir. Therefore two types of improved the PHS models are represented in this paper. The first model is a optimized model by connecting the upper reservoir water level to the non-spinning reserve. The other model is to have priority allocate both the PHS and combined cycle generator for non-spinning reserve. The proposed two models and the E-terracommit model is compared and resulting to have improvement in estimating non-spinning reserve when using the proposed models.

Effects of Hydrogeomorphology and Watershed Land Cover on Water Quality in Korean Reservoirs (우리나라 저수지 수질에 미치는 수문지형 및 유역 토지피복의 영향)

  • Cho, Hyunsuk;Cho, Hyung-Jin;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.2
    • /
    • pp.79-88
    • /
    • 2019
  • In order to study the water quality status and its causal environmental factors, the water quality variables of chemical oxygen demand (COD), chlorophyll a (Chl a), Total phosphorus (TP), and total nitrogen (TN), the hydrogeomorphologic variables of water level fluctuation, total water storage, dam elevation, watershed area, and shoreline development index, and the land cover variables of forest, agricultural area, and urbanized area in the watershed were investigated in total 73 reservoirs with various operational purposes, water level fluctuation and geographical distribution in South Korea. The water quality was more eutrophic in the reservoirs of the more urbanized and agricultural area in the watershed, the low altitude, the narrow water level fluctuation, the narrowed watershed area, and the more circular shape. In terms of the purposes of reservoir operation, the reservoirs for agricultural irrigation were more eutrophic than the reservoirs for flood control. The results of the variable selection and path analysis showed that COD determined by Chl a and TP was directly affected by water level fluctuation and the shoreline development of the reservoirs. TP was directly affected by the urbanized area of the watershed which was related to the elevation of the reservoir. TP was also influenced by the water level fluctuation and the shoreline development. In conclusion, the eutrophication of the reservoirs in Korea would be influenced by the land use of the watershed, hydrological and geographical characteristics of the reservoir, water level fluctuation by the anthropogenic management according to the reservoir operation purpose, and the location of the reservoirs.

Analysis and comparison of the water supply adjustment guide and a hedging rule of reservoir operation derived from mixed-integer programming for water supply operation of a multi-purpose reservoir (다목적댐의 가뭄 대비 용수공급 조정기준과 혼합 정수계획법에 의한 용수 감량 공급 기준의 비교 및 분석)

  • Jin, Youngkyu;Jeong, Taekmun;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.6
    • /
    • pp.443-452
    • /
    • 2021
  • The authors obtained the discrete hedging rule for a reservoir's water supply operation by applying mixed-integer programming to save more water by earlier rationing of water supply for a drought period. The 'water supply adjustment guide' is the current operational method applied to the multipurpose reservoirs, and it was derived by a simulation method. Applying the two rules to the Hapcheon multipurpose dam's reservoir simulations with the inflow record from 2003 to 2018, the water supply deficit occurred for the long drought from 2015 to 2018. Especially, the no water supply or intermittent water supply persisted for the second half of 2017. The water supply adjustment guide had the 'normal water supply recovery threshold on storage,' which resulted in the water supply being unavailable in July 2017; then, the water supply suspension occurred until January 2018, when the reservoir storage was greater than the normal water supply recovery threshold. Despite the storage increasing due to the inflow of water into the reservoir, the suspension occurrence needs to be improved in practice. The current water supply adjustment guide and the discrete hedging rule for a reservoir's water supply operation are useful and realistic as the reservoir operation guide, which shows the concept of reducing water supply during the drought phase as scientific figures. However, to improve the reservoir simulation results, which do not provide any or intermittent water for several months, it is necessary to increase the current water supply reduction for drought phases.

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

Development of the Technology Transfer System In Reservoir operation

  • ITO Kazumasa;IMANISHI Yumi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.44-51
    • /
    • 2005
  • Water flow in rivers during flood season can be 10 to 100 fold higher than normal seasons (low precipitation) in Japan and predicting flood runoff is essential for operating reservoirs with discharging gates. Abundant experiences and knowledge are requisites for operators to be able to make efficient decisions at work. This research investigated a method to transfer technical knowledge by acquiring skills and knowledge from actual dam operators and by using the information to construct an educational training system. The purpose of the research was to enable the execution of a secure and rational reservoir operation during flood period. The educational training system for reservoir operation was developed with the focuses on acquiring knowledge on hydraulics and hydrology and learning about decision making related to the reservoir operation as well as the timing of control. The system is capable of conducting education that corresponds to individual levels in each location. Of the educational training methods, a lecture method that uses textbooks is effective for the understanding of basic knowledge and concepts while a training method that uses a simulation device is essential for the practice of advanced and specialized procedures in specific fields. Simulation devices are used in operational training for airplane flight and driving cars and trains. The educational system presented here was designed to provide further assistance to those who have acquired basic knowledge and concepts through textbooks and also to at low them to perform the satisfactory operation of dam equipment. Our research proposes a method which can realize a system to acquire technical skills-the skills which are the foundation of technical knowledge and operation.

  • PDF

Evaluation of hydropower dam water supply capacity (I): individual and integrated operation of hydropower dams in Bukhan river (발전용댐 이수능력 평가 연구(I): 북한강수계 개별 댐 및 댐군 용수공급능력 분석)

  • Jeong, Gimoon;Choi, Jeongwook;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.505-513
    • /
    • 2022
  • Recently, uncertainty in predicting available water resources is gradually increasing due to climate change and extreme weather conditions. Social interest in water management such as flood and drought prevention is also increasing, and after the unification of water management implemented in 2018, domestic water management is facing a major turning point. As part of such strengthening of water management capabilities, various studies are being conducted to utilize a hydropower dam for flood control and water supply purposes, which was mainly operated for hydroelectric power generation. However, since the dam evaluation methods developed based on a multi-purpose dam are being applied to hydropower dams, an additional evaluation approach that can consider the characteristics of hydropower dams is required. In this study, a new water supply capacity evaluation method is presented in consideration of the operational characteristics of hydropower dams in terms of water supply, and a connected reservoir simulation method is proposed to evaluate the comprehensive water supply capacity of a dam group operating in a river basin. The presented method was applied to the hydropower dams located in the Bukhan River basin, and the results of the water supply yield of individual dams and multi-reservoir systems were compared and analyzed. In the future, the role of hydropower dams for water supply during drought is expected to become more important, and this study can be used for sustainable domestic water management research using hydropower dams.

What are the benefits and challenges of multi-purpose dam operation modeling via deep learning : A case study of Seomjin River

  • Eun Mi Lee;Jong Hun Kam
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.246-246
    • /
    • 2023
  • Multi-purpose dams are operated accounting for both physical and socioeconomic factors. This study aims to evaluate the utility of a deep learning algorithm-based model for three multi-purpose dam operation (Seomjin River dam, Juam dam, and Juam Control dam) in Seomjin River. In this study, the Gated Recurrent Unit (GRU) algorithm is applied to predict hourly water level of the dam reservoirs over 2002-2021. The hyper-parameters are optimized by the Bayesian optimization algorithm to enhance the prediction skill of the GRU model. The GRU models are set by the following cases: single dam input - single dam output (S-S), multi-dam input - single dam output (M-S), and multi-dam input - multi-dam output (M-M). Results show that the S-S cases with the local dam information have the highest accuracy above 0.8 of NSE. Results from the M-S and M-M model cases confirm that upstream dam information can bring important information for downstream dam operation prediction. The S-S models are simulated with altered outflows (-40% to +40%) to generate the simulated water level of the dam reservoir as alternative dam operational scenarios. The alternative S-S model simulations show physically inconsistent results, indicating that our deep learning algorithm-based model is not explainable for multi-purpose dam operation patterns. To better understand this limitation, we further analyze the relationship between observed water level and outflow of each dam. Results show that complexity in outflow-water level relationship causes the limited predictability of the GRU algorithm-based model. This study highlights the importance of socioeconomic factors from hidden multi-purpose dam operation processes on not only physical processes-based modeling but also aritificial intelligence modeling.

  • PDF

Analysis of Irrigation Efficiency and Pattern in Galshin Pumping District (갈신양수장 관개지구의 관개효율과 관개패턴분석)

  • Ryu, Bumhee;Park, Seungki
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.3
    • /
    • pp.91-102
    • /
    • 2020
  • The purpose of study was analyze the pumping characteristics, Irrigation Efficiency(IE), and irrigation pattern by period of rice growing stage with based on the performance of design irrigation water requirement and operational Galshin Pumping(GP) station in GP irrigation district constructed under rural water development project master plan. GP station was located in Yedang reservoir, Yesan-gun, Chungcheongnam-do and has been supplying irrigation water since 2006. The research data are the Irrigation Water Requirement(IWR) and the Pumping Water Amount(PWA) from 2006 to 2015 at the GP station, which is the supplied amount. The IWR were calculated using the Blaney-Criddle formula of the HOMWRS program, Hydrological Operation Model for Water Resource System, developed by Korea Rural Community Corporation. The Blaney-Criddle formula was used to calculate design irrigation water requirement of Galshin rural water development project master plan. During 2006-2015, the study period, the annual average IWR is 763.2(±149.1)mm, the annual PWA of the GP station is 397.4mm to 1,056.9mm, and those average annual PWA is 643.4(±208.4)mm. The annual IE of GP station 96.5% to 169.0%, and the average annual IE is 124.3%, which is higher than the research results conducted in other pumping stations. Analyzing the irrigation patterns of the GP irrigation district, the IWR Ratio per 10days(IWRR) and the PWA Ratio per 10days(PWAR) of the G P station were obtained. The IWRR is the percentage of IWR for each 10 days of a month to total IWR per year, and the PWAR is the percentage of PWA for each 10 days of a month to total PWA per year. The Kolmogorov- Smirnov(K-S) test results of IWRR and PWAR showed the characteristics classification by rice growing stage and stable normal distribution characteristics. Average IWRR(AIWRR) and Average PWAR(APWAR) are presented as irrigation patterns. Irrigation pattern analysis will be able to standardize comparison, analysis and probability calculation of the pumping station characteristics of different pumping stations and apply to objective evaluation of the pumping station district.