• Title/Summary/Keyword: Reservoir facility

Search Result 87, Processing Time 0.022 seconds

The Study on Damaged Hanbuk Mountain Range in Gyeonggi-Do (경기도 한북정맥 훼손유형 연구)

  • Seo, Jung-Young;Lee, Yang-Ju
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.4
    • /
    • pp.65-74
    • /
    • 2010
  • This study is for Hanbuk Mountain Range within Gyeonggi province which is to propose the conservation plan by each damage pattern through site survey of the mountain range. The damage patterns are classified by siding, pointing and lining. The total damaged area is 103 areas: The siding pattern is damaged by developing farmland, mineral and quarry mining, dam, large scale development complex and cemetery park; The pointing pattern is including the development of road, transmission tower and way and mountaineering trail; The construction of electricity and communication facility, military facility, mobile communication station, heliport and shelter. The damages by developing road and large scale development complex are the most cause, and military facility, dam and reservoir, and residential area are the main causes, respectively. One of the compromised situation Hanbuk-Mountain Range usage as per section 7 section (18.45%), 12 section (18.45%) is the largest number of compromised has been surveyed, undermine the situation if you look at the usage by the road 25 locations (24.22%), military facilities and dam and reservoir to undermine this 11 established respectively (10.68%) were the most undermine. Therefore, this research propose the conservation plan as follow: first, need to understand, educate and publicize on Hanbuk-Mounatin Range; second, manage through the regulations and ordinance of Gyeonggi province; third build and expand the law for protecting Baekdu-Great Mountain Range.

A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ - (석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 -)

  • Kwon, Soon-Kang;Lee, Ho-Yeol;Park, Un-Jung
    • Journal of architectural history
    • /
    • v.20 no.3
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.

Geomechanical assessment of reservoir and caprock in CO2 storage: A coupled THM simulation

  • Taghizadeh, Roohollah;Goshtasbi, Kamran;Manshad, Abbas Khaksar;Ahangari, Kaveh
    • Advances in Energy Research
    • /
    • v.6 no.1
    • /
    • pp.75-90
    • /
    • 2019
  • Anthropogenic greenhouse gas emissions are rising rapidly despite efforts to curb release of such gases. One long term potential solution to offset these destructive emissions is the capture and storage of carbon dioxide. Partially depleted hydrocarbon reservoirs are attractive targets for permanent carbon dioxide disposal due to proven storage capacity and seal integrity, existing infrastructure. Optimum well completion design in depleted reservoirs requires understanding of prominent geomechanics issues with regard to rock-fluid interaction effects. Geomechanics plays a crucial role in the selection, design and operation of a storage facility and can improve the engineering performance, maintain safety and minimize environmental impact. In this paper, an integrated geomechanics workflow to evaluate reservoir caprock integrity is presented. This method integrates a reservoir simulation that typically computes variation in the reservoir pressure and temperature with geomechanical simulation which calculates variation in stresses. Coupling between these simulation modules is performed iteratively which in each simulation cycle, time dependent reservoir pressure and temperature obtained from three dimensional compositional reservoir models in ECLIPSE were transferred into finite element reservoir geomechanical models in ABAQUS and new porosity and permeability are obtained using volumetric strains for the next analysis step. Finally, efficiency of this approach is demonstrated through a case study of oil production and subsequent carbon storage in an oil reservoir. The methodology and overall workflow presented in this paper are expected to assist engineers with geomechanical assessments for reservoir optimum production and gas injection design for both natural gas and carbon dioxide storage in depleted reservoirs.

Real-time Reservoir Dam Status Evaluation System Using Wireless Sensor Network System (무선 센서 네트워크 시스템을 이용한 실시간 저수지 댐의 상태평가 시스템)

  • Yoo, Chanho;Kim, Seungwook;Hwang, Jungsoon;Na, Gihyuk;You, Kwangho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.12
    • /
    • pp.41-46
    • /
    • 2018
  • The wireless sensor network system has the advantage of confirming the behavior of the entire facility by improving the disadvantages of conventional monitoring system. As a result, it is widely proposed as safety diagnosis and measurement of structures, water management systems, and management systems for dam structures. However, there is a lack of research that can evaluate the condition of facilities such as safety at the same time as monitoring. In this study, it is proposed a wireless sensor network system which can evaluate the behavior characteristics of facilities and evaluate the safety status for improving the technical disadvantages on conventional monitoring system. The geotechnical risk factors for the reservoir dam facility were evaluated and the limit values for the risk factors causing the failure of the facility were set. In other words, the system was set up so that the risk factors can be measured and the limit status can be evaluated immediately for each factor. In this study, numerical analysis is carried out for seepage and slope stability analysis using the typical cross section for reservoir dams. The stress-porewater coupling finite difference numerical analysis is performed for establishing the limit displacement for reservoir dam structures. It is developed a system that can estimate the time to reach the critical value by regression analysis using the measured datas.

A Validation Study on the Reinforcement Effect of Reservoir Grouting by Surface Wave Survey (표면파탐사를 이용한 저수지 제체 그라우팅 보강효과 검증 연구)

  • Bae, Hyungseop;Lee, Yeong-Dong;Won, Kyoung-Sik
    • The Journal of Engineering Geology
    • /
    • v.28 no.2
    • /
    • pp.297-312
    • /
    • 2018
  • In order to assess the safety diagnosis and grouting reinforcement effect of old reservoir facility, local governments and public offices mainly use electrical resistivity survey. However, electrical resistivity survey is a qualitative evaluation that varies the resistivity value by various exploration conditions. It is also difficult to grasp the stiffness change directly related to the stability of reservoir, thus an electrical resistivity survey is not applicable to continuous stability monitoring after grouting. The purpose of this study is to investigate and validate the quantitative evaluation of reinforcement effect of reservoir with cement grouting through shear velocity (Vs), which is closely related to the stiffness (${\mu}$) of the ground. This study was carried out on two reservoir facilities. The reinforcement effect was evaluated by comparing the permeability test, standard penetration test, down-hole test and MASW(Multi-channel Analysis of Surface wave) survey before and after cement grouting. Shear wave velocity changes before and after grouting were analyzed by phase velocity difference and inversion analysis, respectively, and the reliability of the analytical results was evaluated by comparing with field test results. Shear wave velocity increases to 5~10% in case of the D levee, and 10~20% in the levee of H reservoir. These results are showed similar pattern to the field test results.

Introduction and Classification System of Reservoir Park Mitigating Flood (홍수대응 다목적 재해대응 저류공원의 도입과 분류체계 연구)

  • Moon, Soo-Young;Jung, Seung-Hyun;Yun, Hui-Jae
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.12
    • /
    • pp.646-659
    • /
    • 2018
  • This study proposed "Reservoir Park", which added disaster prevention function to urban green spaces such as city parks through domestic and overseas related laws review, case studies, field trips. This is a combination of urban parks and reservoirs as urban planning facilities, which can provide both space for daily use by urban residents and disaster mitigation functions in case of emergency. In order to prevent flooding in urban areas due to climate change, facilities should be installed in the form of parks, etc., as the reservoir facility should be systematically reviewed together with urban planning facilities. However it was found that the reservoir park was not clear as a theme park. In this study, the types of storage facilities in urban areas were reclassified into five types of storage parks reflecting the characteristics of urban green spaces through domestic case studies and field trips. The classification of the reservoir parks is classified into 5 kinds such as ecological type, vegetation cover type, exercise facility type, underground burial type and hybrid type based on groundwater level, human use, and reservoir size. This classification system can be used to determine the types of facilities to be built after designating the location of future storage facilities.

Evaluation of SELECT Model for the Quality Prediction of Water Released from Stratified Reservoir (성층화된 저수지의 방류수 수질예측을 위한 SELECT 모델의 적용성 검토)

  • Lee, Heung Soo;Chung, Se Woong;Shin, Sang Il;Choi, Jung Kyu;Kim, Yu Kyung
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.591-599
    • /
    • 2007
  • The quality of water released from a stratified reservoir is dependent on various factors such as the location and shape of intake facility, structure of reservoir stratification, profile of water quality constituent, and withdrawal flux. Sometimes, selective withdrawal capabilities can provide the operational flexibility to meet the water quality demands both in-reservoir and downstream. The objective of this study was to evaluate the performance of a one-dimensional reservoir selective withdrawal model (SELECT) as a tool for supporting downstream water quality management for Daecheong and Imha reservoirs. The simulated water quality variables including water temperature, dissolved oxygen (DO), conductivity, turbidity were compared with the field data measured in tailwater. The model showed fairly satisfactory results and high reliability in simulating observations. The coefficients of determinant between simulated and observed turbidity values were 0.93 and 0.95 for Daecheong and Imha reservoirs, respectively. The outflow water quality was significantly influenced by water intake level under fully stratified condition, while the effect of intake amount was minor. In conclusion, the SELECT is simple but effective tool for supporting downstream water quality prediction and management for both reservoirs.

A Study on LSTM-based water level prediction model and suitability evaluation (LSTM 기반 배수지 수위 변화 예측모델과 적합성 평가 연구)

  • Lee, Eunji;Park, Hyungwook;Kim, Eunju
    • Smart Media Journal
    • /
    • v.11 no.5
    • /
    • pp.56-62
    • /
    • 2022
  • Water reservoir is defined as a storage space to hold and supply filtered water and it's significantly important to manage water level in the water reservoir so as to stabilize water supply by controlling water supply depending on demand. Liquid level sensors have been installed in the water reservoir and the pumps in the booster station facilitated management for optimum water level in the water reservoir. But the incident responses including sensor malfunction and communication breakdown actually count on manager's inspection, which involves risk of accidents. To stabilize draining facility management, this study has come up with AI model that predicts changes in the water level in the water reservoir. Going through simulation in the case of missing data in the water level to verify stability in relation to the field application of the prediction model for water level changes in the reservoir, the comparison of actual change value and predicted value allows to test utility of the model.

The Comparative Analysis of Reservoir Capacity of Chungju Dam based on Multi Dimensional Spatial Information (다차원 공간정보 기반의 충주댐 저수용량 비교분석)

  • Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.533-540
    • /
    • 2010
  • Dam is very important facility in water supply and flood control. Therefore study needs to analyze reservoir capacity accurately to manage Dam efficiently. This study compared time series reservoir capacity using multi-dimensional spatial information to Chungju Dam reservoir and major conclusions are as follows. First, LiDAR and multi beam echo sounder survey were carried out in land zone and water zone of Dam reservoir area. And calibration process was performed to enhance the accuracy of survey data and it could be constructed that multi dimensional spatial information which was clearly satisfied with the standard of tolerance error by validation with ground control points. Reservoir capacity by water level was calculated using triangle irregular network from detailed topographic data that was constructed by linked with airborne LiDAR and multi beam echo sounder data, and curve equation of reservoir capacity was developed through regression analysis in 2008. In the comparison of the reservoir capacity of 2008 with those of 1986 and 1996, the higher water level goes, total reservoir capacity of 2008 showed decrease because of the increase of sediment in reservoir. Also, erosion and sediment area could be analyzed through calculating the reservoir capacity by the range of water level. Especially the range of water level as 130.0~135.0 which is the upper part of average water level, showed the highest erosion characteristics during 1986~2008 and 1996~2008 and it is considered that the erosion of reservoir slant by heavy rainfall is major reason.

Development of an Automatic Ophthalmological Outflow Facility Measuring Device (자동 안압 측정장치의 개발)

  • Kim, H.S.;Choi, Gi-S.;Lim, Y.A.;Ki, C.W.;Kim, W.K.;Hong, T.M.
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1996 no.11
    • /
    • pp.178-181
    • /
    • 1996
  • The Outflow facility of eye ball provides crucial informations in the diagnose of ophthalmological glaucoma. Tn this study an ophthalmic outflow facility measuring device is developed and experimentally tested. This system employs pressure sensors and linear positioning device to regulate solution reservoir height, the pressure of eye ball. The experimental result show that the system works well even in harsh environment so that it can be implemented in ophthalmic practice as well as in biomedical research.

  • PDF