• Title/Summary/Keyword: Research System Procedure

Search Result 1,710, Processing Time 0.031 seconds

Evaluation Method for Measurement System and Process Capability Using Gage R&R and Performance Indices (게이지 R&R과 성능지수를 이용한 측정시스템과 공정능력 평가 방법)

  • Ju, Youngdon;Lee, Dongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.2
    • /
    • pp.78-85
    • /
    • 2019
  • High variance observed in the measurement system can cause high process variation that can affect process capability badly. Therefore, measurement system analysis is closely related to process capability analysis. Generally, the evaluation for measurement system and process variance is performed separately in the industry. That is, the measurement system analysis is implemented before process monitoring, process capability and process performance analysis even though these analyses are closely related. This paper presents the effective concurrent evaluation procedure for measurement system analysis and process capability analysis using the table that contains Process Performance (Pp), Gage Repeatability & Reproducibility (%R&R) and Number of Distinct Categories (NDC). Furthermore, the long-term process capability index (Pp), which takes into account both gage variance and process variance, is used instead of the short-term process capability (Cp) considering only process variance. The long-term capability index can reflect well the relationship between the measurement system and process capability. The quality measurement and improvement guidelines by region scale are also described in detail. In conclusion, this research proposes the procedure that can execute the measurement system analysis and process capability analysis at the same time. The proposed procedure can contribute to reduction of the measurement staff's effort and to improvement of accurate evaluation.

A Study on Derivation of Railway Software Safety Management Procedure (철도소프트웨어 안전성 관리체계 계시방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.244-246
    • /
    • 2006
  • Softwares in railway system are being used in the area of railway control system, directly associated to safety. Because the instinct characteristic of Software is uncertainty, Software development without safety insurance is very hazardous situation. In order to derive safety certification process in the railway system, certification and approval processes in the nuclear, aviation, and military area are studied. Software quality should be improved by two aspects : one is product aspect, another is process aspect. GS(Good Software) and ES(Excellent Software) certification can be exemplified in a product aspect approach. In those process certification, CMMI (Capability Maturity Model Integration) or SPICE (Software Process Improvement and Capability dEtermination : ISO/IEC15504) is being used as models for assessing process maturity of organization. Following the studies, safety management procedure in the railway system is suggested.

  • PDF

The Probability Distribution of the Number of Customers Accumulated When a Vacation Ends in the Geo/G/1 Gated System

  • Noh, Seung J.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.4
    • /
    • pp.167-172
    • /
    • 1997
  • We present a procedure which finds the probability distribution of number of customers accumulated when the server ends a vacation in the Geo/G/1 gated queueing system, where the service for a customer and the vacation, respectively, takes one slot time. The pp. g. f. for the number of customers accumulated at the gate closing epoch is obtained as a recursive form. The full probabilities, then, are derived using an iterative procedure. This system finds an application in a packet transmitting telecommunications system where the server transmits(serves) packets(customers) accumulated at a gate closing epoch, and takes one slot time vacation thereafter.

  • PDF

Toward the Efficient Integration of Travel Demand Analysis with Transportation Network Design Models (교통수요예칙과 가로망설계의 효율화)

  • 이인원
    • Journal of Korean Society of Transportation
    • /
    • v.1 no.1
    • /
    • pp.28-42
    • /
    • 1983
  • In recent years, significant advances have been made enabling travel demand analysis and network design methods to be used as increasingly realistic evaluation tools. What has been lacking is the integration of travel demand analysis with network design models. This paper reviews some of advanced (integrated) modeling approaches and presents future research directions of integrated modeling system. To design urban transportation networks, it is argued that the travelers' free choice of mode, destination and route should be introduced into transportation network design procedure instead of assuming that trips from a zone to a workplace are fixed or deriving them in a normative procedure to achieve hypothetical system optima.

  • PDF

Research of Integrated System Design Process for Concurrency Design Activity (동시적 업무수행을 위한 통합된 시스템 설계 프로세스연구)

  • 김진훈;박영원
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.103-108
    • /
    • 2004
  • This paper will describe integrated system design process and its application. Integrated design process is performed activities concurrently and sequentially for product development. For a group of activities to be truly integrated, the flow of deliverables among them must be well defined, and committed to. For this purpose, the study will suggest procedure that is executed context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrency & sequential activities flow, This procedure and method will contribute to minimize time loss that is emerged from activities iteration by not definitely definition of activities interface.

  • PDF

OPERATOR BEHAVIORS OBSERVED IN FOLLOWING EMERGENCY OPERATING PROCEDURE UNDER A SIMULATED EMERGENCY

  • Choi, Sun-Yeong;Park, Jin-Kyun
    • Nuclear Engineering and Technology
    • /
    • v.44 no.4
    • /
    • pp.379-386
    • /
    • 2012
  • A symptom-based procedure with a critical safety function monitoring system has been established to reduce the operator's diagnosis and cognitive burden since the Three-Mile Island (TMI) accident. However, it has been reported that a symptom-based procedure also requires an operator's cognitive efforts to cope with off-normal events. This can be caused by mismatches between a static model, an emergency operating procedure (EOP), and a dynamic process, the nature of an ongoing situation. The purpose of this study is to share the evidence of mismatches that may result in an excessive cognitive burden in conducting EOPs. For this purpose, we analyzed simulated emergency operation records and observed some operator behaviors during the EOP operation: continuous steps, improper description, parameter check at a fixed time, decision by information previously obtained, execution complexity, operation by the operator's knowledge, notes and cautions, and a foldout page. Since observations in this study are comparable to the results of an existing study, it is expected that the operational behaviors observed in this study are generic features of operators who have to cope with a dynamic situation using a static procedure.

Ground Test and Evaluation of a Flight Control Systemfor Unmanned Aerial Vehicles

  • Suk, Jin-Young
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.5 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • UAV(Unmanned Aerial Vehicle) has become one of the most popularmilitary/commercial aerial robots in the new millennium. In spite of all theadvantages that UAVs inherently have, it is not an easv job to develop a UAVbecause it requires very systematic and complete approaches in full developmentenvelop. The ground test and evaluation phase has the utmost importance in thesense that a well-developed system can be best verified on the ground. In addition,many of the aircraft crashes in the flight tests were resulted from the incompletedevelopment procedure. In this research, a verification procedure of the wholeairbome integrated system was conducted including the flight management system.An airbome flight control computer(FCC) senses the extemal environment from thepehpheral devices and sends the control signal to the actuating system using theassigned control logic and flight test strategy. A ground test station controls themission during the test while the downlink data are transferred from the flightmanagement computer using the serial communication interface. The pilot controlbox also applies additional manual actuating commands. The whole system wastested/verified on the wind-tunnel system, which gave a good pitch controlperformance with a preUspecified flight test procedure. The ground test systemguarantees the performance of fundamental functions of airbome electronic systemfor the future flight tests.

Establishment of Document Control System for the Jordan Research and Training Reactor Project (요르단연구로건설사업 문서관리시스템 구축)

  • Park, Kook-Nam;Ko, Young-Cheol;Wu, Sang-Ik;Oh, Soo-Youl;Lee, Doo-Jeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

Establishment of Test Environment for Surveillance Data Processor (항공관제용 감시자료처리시스템 시험 환경 구축)

  • Ko, Hyun;Jeon, Dae-Keun;Eun, Yeon-Ju;Yeom, Chan-Hong
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2010.07a
    • /
    • pp.91-94
    • /
    • 2010
  • 본 논문에서는 SDP 시스템이 충족해야 할 요구 규격을 검증하기 위하여 시험 환경 구축 방안을 제안하였다. SDP 시험 환경은 기능/성능/안정성 시험을 수행할 수 있도록 기존 항공관제시스템의 서브 시스템들과 동일한 기능을 수행하는 Simulation System들과 항적 추적 성능을 검증하기 위한 Eurocontrol의 SASS-C와 SMART 시스템으로 구축하였다. 또한 SDP 시험에 있어 Test Case 및 Test Procedure를 구성하여 SDP 요구 규격에 대한 정확한 검증을 수행할 수 있도록 시험 절차를 정의하였다. 제안된 시험 환경 및 시험 절차는 모의 시험을 통해 소프트웨어 구현 과정에서의 시스템 요구 규격에 대한 충족도를 보다 높일 수 있다.

  • PDF

Fault Diagnosis of Rotating System Mass Unbalance Using Hidden Markov Model (HMM을 이용한 회전체 시스템의 질량편심 결함진단)

  • Ko, Jungmin;Choi, Chankyu;Kang, To;Han, Soonwoo;Park, Jinho;Yoo, Honghee
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.9
    • /
    • pp.637-643
    • /
    • 2015
  • In recent years, pattern recognition methods have been widely used by many researchers for fault diagnoses of mechanical systems. The soundness of a mechanical system can be checked by analyzing the variation of the system vibration characteristic along with a pattern recognition method. Recently, the hidden Markov model has been widely used as a pattern recognition method in various fields. In this paper, the hidden Markov model is employed for the fault diagnosis of the mass unbalance of a rotating system. Mass unbalance is one of the critical faults in the rotating system. A procedure to identity the location and size of the mass unbalance is proposed and the accuracy of the procedure is validated through experiment.