• Title/Summary/Keyword: Repair works

Search Result 195, Processing Time 0.023 seconds

Development and Application of Power System Stability Analysis Program Using OOP (개체지향기반 안정도 해석 프로그램 개발 및 적용)

  • 박지호
    • Journal of Energy Engineering
    • /
    • v.11 no.3
    • /
    • pp.194-202
    • /
    • 2002
  • In this paper, we simulate the power system transient stability of Kwang Yang steel works using object-oriented programming (OOP). OOP is a more flexible method than procedural programming. There are several advantages in dynamic system simulation using OOP, The maintenance and repair of program are easy because it is sufficient to modify necessary parts which correspond to the change of system without overall change of program. We have implemented a graphical man-machine interface (MMI) that can be used draw one-line system diagram and analyze power flow and dynamic stability. The implemented MMI also provide a graphical viewer that display dynamic stability analysis results by mouse event handling. The proposed method have been applied to Kwang Yang steel works network for on-line dynamic stability analysis. The dynamic behaviour of 17 synchronous generators and 25 synchronous motors has been studied in the Kwang Yang network.

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (열차운행속도 상승에 따른 레일마모 및 캔트조정 연구)

  • Shin, Gil-Cheol;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1121-1128
    • /
    • 2007
  • Subway routes $1{\sim}4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

A Study on Wearing of Rail and Adjustment of Cant in Accordance with Increase in Running Speed of Train (속도 상승에 따른 캔트조정 사례 분석)

  • Shin, Gil-Cheol;Yang, Hoe-Seong;Joo, Bong-Gyu;Chung, Sung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.151-157
    • /
    • 2008
  • Subway routes $1\sim4$ were constructed in gravel roadbed track structure in consideration of the technological capabilities, construction cost and duration at the time of the initial construction. As such, 224.8km, approximately 81.2% of entire length, of total length of railway track at 276.9km was constructed on gravel roadbed. However, improvement of gravel roadbed to concreted roadbed began in 1998 due to problems including frequent repair works and limited time application for such works caused by occurrence of tract distortion during operation as well as lowering of roadbed functions and generation of dust caused by frictional power, impact absorption capabilities, abrasion and crushing of gravel on roadbed. Currently, this improvement is continuing with target of converting entire route into concreted roadbed structure. Therefore, this Study modifies formula for setting cant, analyze the correlation between wearing of rail side of the curvature and cant insufficiency following increasing of the running speed of the train, and to present the directions for fundamental review for adjustment of cant insufficiencies at the time of improvement of gravel roadbed to concreted roadbed that is being implemented on the operational tracks of the railway trains.

  • PDF

Experimental Performance Evaluation of Steel Mesh as Maintenance and Reinforcement Materials (Steel Mesh Cement Mortar의 보수⋅보강 성능 평가)

  • Kim, Yeon-Sang;Choi, Seung-Jai;Kim, Jang-Ho Jay
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.4
    • /
    • pp.50-58
    • /
    • 2014
  • Due to the cost burden of new construction, the necessity of repair and retrofitting of aged structures is sharply increasing as the domain of repair and retrofitting construction is expanding. Because of the necessity, new technologies for repair and retrofitting are continuously studied in Korea and foreign countries. Steel adhesive method, fiber reinforced plastic (FRP) surface adhesive method, and external prestressing method are used to perform the repair and retrofitting works in Korea. In order to consider a repair method using steel mesh reinforced cement mortar (SMCM), 3-point flexural member test was conducted considering repair area and layer number of SMCM. Five types of specimens including ordinary reinforced concrete (RC) specimen with dimensions of $1400{\times}500{\times}200$ (mm) were cast for testing the deflection measurement, a LVDT was installed at the top center of the specimens. Also, a steel strain gauge and a concrete strain gauge were placed at the center of the specimens. A steel strain gauge was also installed on the shear reinforcement. The 3 point flexural member test results showed that the maximum load of SMCM reinforced specimen was higher than that of basic RC specimen in all of the load-displacement curves. Also, the results showed that, when the whole lower part of the basic RC specimen was reinforced, the maximum load and strain were 1.18 and 1.37 times higher than that of the basic RC specimen, respectively. Each specimen showed a slightly different failure behavior where the difference of the results was caused by the difference in the adhesive level between SMCM and RC. Particularly, in SM-B1 specimen, SMCM spalled off during the experiment. This failure behavior showed that the adhesive performance for RC must be improved in order to utilize SMCM as repair and retrofitting material.

Classifying Sub-Categories of Apartment Defect Repair Tasks: A Machine Learning Approach (아파트 하자 보수 시설공사 세부공종 머신러닝 분류 시스템에 관한 연구)

  • Kim, Eunhye;Ji, HongGeun;Kim, Jina;Park, Eunil;Ohm, Jay Y.
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.10 no.9
    • /
    • pp.359-366
    • /
    • 2021
  • A number of construction companies in Korea invest considerable human and financial resources to construct a system for managing apartment defect data and for categorizing repair tasks. Thus, this study proposes machine learning models to automatically classify defect complaint text-data into one of the sub categories of 'finishing work' (i.e., one of the defect repair tasks). In the proposed models, we employed two word representation methods (Bag-of-words, Term Frequency-Inverse Document Frequency (TF-IDF)) and two machine learning classifiers (Support Vector Machine, Random Forest). In particular, we conducted both binary- and multi- classification tasks to classify 9 sub categories of finishing work: home appliance installation work, paperwork, painting work, plastering work, interior masonry work, plaster finishing work, indoor furniture installation work, kitchen facility installation work, and tiling work. The machine learning classifiers using the TF-IDF representation method and Random Forest classification achieved more than 90% accuracy, precision, recall, and F1 score. We shed light on the possibility of constructing automated defect classification systems based on the proposed machine learning models.

A Flexible Programmable Memory BIST for Embedded Single-Port Memory and Dual-Port Memory

  • Park, Youngkyu;Kim, Hong-Sik;Choi, Inhyuk;Kang, Sungho
    • ETRI Journal
    • /
    • v.35 no.5
    • /
    • pp.808-818
    • /
    • 2013
  • Programmable memory built-in self-test (PMBIST) is an attractive approach for testing embedded memory. However, the main difficulties of the previous works are the large area overhead and low flexibility. To overcome these problems, a new flexible PMBIST (FPMBIST) architecture that can test both single-port memory and dual-port memory using various test algorithms is proposed. In the FPMBIST, a new instruction set is developed to minimize the FPMBIST area overhead and to maximize the flexibility. In addition, FPMBIST includes a diagnostic scheme that can improve the yield by supporting three types of diagnostic methods for repair and diagnosis. The experiment results show that the proposed FPMBIST has small area overhead despite the fact that it supports various test algorithms, thus having high flexibility.

A Study on Basic Properties of Grouting Motars for polymer-Modified preplaced Aggregate Concrete (프리팩트 폴리머 시멘트 콘크리트용 주입 폴리머 시멘트 모르터의 성질에 관한 연구)

  • 이철웅;김완기;조영국;소양섭
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10a
    • /
    • pp.350-355
    • /
    • 1998
  • Preplaced aggregate concrete in the building fields has recently been used in the partial repair works for damaged reinforced concrete structures, and polymer-modified mortars have been employed as grouting mortars for the preplaced aggregate concrete. The objective of this study is to clear the properties of polymer-modified grouting mortars. Polymer-modified mortars using a polystyrene acrylic(St/Ac) emulsion as grouting mortars for preplaced aggregate concrete are prepared with various mix proportions, and tested for flexural and compressive strengths, adhesion in tension. The flexural strength of emulsion-modified grouting mortars does not give much variation with increasing fly ash replacement for cement and sand-binder ratio. With increasing polymer-binder ratio, the flexural strength and adhesion in tension of St/Ac emulsion-modified grouting mortars increases, become nearly constant or reaches a maximum at a polymer-binder ratio of 5%. From the test results, St/Ac emulsion-modified grouting mortar with a polymer-binder ratio of 5%, a fly ash replacement of 10% for cement and sand-binder ratio of 1.0 is recommended as a grouting mortar for preplaced aggregate concrete.

  • PDF

Reservoir Classification using Data Mining Technology for Survivor Function

  • Park, Mee-Jeong;Lee, Joon-Gu;Lee, Jeong-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.7
    • /
    • pp.13-22
    • /
    • 2005
  • Main purpose of this article is to classify reservoirs corresponding to their physical characteristics, for example, dam height, dam width, age, repair-works history. First of all, data set of 13,976 reservoirs was analyzed using k means and self organized maps. As a result of these analysis, lots of reservoirs have been classified into four clusters. Factors and their critical values to classify the reservoirs into four groups have been founded by generating a decision tree. The path rules to each group seem reasonable since their survivor function showed unique pattern.

The Development of Robot that is Detecting of Sewage Pipe and Cutting of Connection Projecting Part (하수관로 검사 및 연결 절단부 로봇의 개발)

  • Chung Jae-Kang;Kim Woo-Jin;Kim Jae-Yeol
    • Tribology and Lubricants
    • /
    • v.22 no.4
    • /
    • pp.225-229
    • /
    • 2006
  • The issue with the drainpipe now a day is that they are laid underground. Causing us to perform additional work to repair, such as digging up the ground and peeling off the insulator that surrounds the pipe. And such series works are difficult that concession appears from government and municipal office. However, if we can save time and money. Performance of piping robot that we are studied in existing session through fixing unit and improvement of cutting bit shorten and wished to heighten work efficiency. And we are trying to develop a unit that can cut up the projecting parts which connects with the interior part of the drainpipes.

Analyzing Repair Processes Using Process Mining : A Case Study (프로세스 마이닝을 활용한 제품 수리 프로세스 분석 사례연구)

  • Yang, Hanna;Song, Minseok
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.1
    • /
    • pp.86-96
    • /
    • 2015
  • A lot of research works in the BPM area focuses on the development of new techniques in process mining. Even though the application of process mining to analyze real life process logs is important, only few case studies are available. Thus, in this paper, we conduct a case study on how to analyze a real life process log which comes from a Korean company in the heavy industry area. We analyze a customer service process that consists of a series of activities to enhance the level of customer satisfaction. In this case study, five research questions are derived based on collected questions from the company. Then we focus on bottleneck analysis, basic performance analysis and pattern analysis that are selected in order to answer the research questions. The analysis shows some abnormal behaviors in the process and possible ways to improve current processes are suggested.