• 제목/요약/키워드: Removal efficiency rate

검색결과 1,299건 처리시간 0.027초

침지형 membrane을 이용한 생활오수처리 (Municipal Wastewater Treatment by Submerged Membrane Process)

  • 김광남;정순형;정우영;윤용수
    • 환경위생공학
    • /
    • 제14권2호
    • /
    • pp.105-112
    • /
    • 1999
  • The removal characteristic of BOD, COD,T-N, and T-P was investigated in municipal wastewater treatment with anoxic and membrane submerged aerobic reactor. It was found that BOD and COD removal rate were obtained 90% and 92%, respectively, for 90 days operation. BOD and COD loading rate did not affect to the removal efficiency because MLSS concentration in aerobic tank was highly maintained.In the case of first reactor operated with anoxic and second reactor operated as aerobic, T-N, T-P removal rate were obtained 93% and 99% respectively.It was shown that removal efficiency could be maintained stable due to the complete removal of SS and sludge production decreased with increasing of sludge retention time.

  • PDF

공기청정기 CA 규격성능시험 결과 분석 및 가스시험 변별력 향상 방안연구 (Analysis of CA Certification Performance Test Results and Improvement of CA Test Method for a Better Differentiation of Gas Removal Performances for Room Air Cleaners)

  • 김학준;한방우;김용진;차성일
    • 한국입자에어로졸학회지
    • /
    • 제7권3호
    • /
    • pp.87-97
    • /
    • 2011
  • In this study, we organized the test results obtained from the performance tests for the CA certificated air cleaners which had been commercially available in Korea since 2003, and analyzed the correlation among the test parameters such as flow rate, particle collection efficiency, clean air delivery rate (CADR), ozone emission, odor removal efficiency and noise level etc. The noise level of 267 air cleaners were increased as concentrated at the 45, 50, 55 dB, which are the required noise level for CA certification according to flow rate, and ozone emissions from the CA air cleaners were significantly lower than the requirement limit, 50 ppb for 24 hour operation. The average particle collection efficiency and odor removal efficiency were 89.3 and 80.8%, approximately 20% higher than the requirement of CA certification, regardless of flow rates. The particle removal performance of an air cleaner was clearly discriminated by its CADR, and the CADR was obtained with a simple calculation: 0.79 x flow rate. The low differentiation of gas removal performance of air cleaners by the current CA gas test method was improved by 3.2, 751.3, 13.4 times for ammonia, acetic acid, respectively, by adopting the CADR concept and the real time measurement method, FTIR, for gas removal performance test.

정수처리 공정에서 잔류의약물질 제어 효율 평가 (Evaluation on the removal efficiency of pharmaceutical compounds in conventional drinking water treatment processes)

  • 서희정;박용훈;강인숙;명화봉;송양석;강영주
    • 분석과학
    • /
    • 제29권3호
    • /
    • pp.126-135
    • /
    • 2016
  • 상수원으로 유출될 가능성이 높은 잔류의약물질 대상으로 정수처리공정의 단위 공정별 잔류의 약물질 제어 효율을 평가하였다. 응집 공정에서는 Sulfonamide계 항생제는 22.6~42.1 % 제거 되었으며, Naproxen 28.2 %, Acetaminophen 20 %가 제거되었다. Trimethoprim은 4.4 %, Erythromycin은 2.4 %로 낮은 제거율을 보여 주었으며, Aspirin은 전혀 제거되지 않았다. 염소처리와 응집 혼합 공정을 적용하였을 때, 염소 주입량이 증가할수록 제거율이 증가되었다. 염소주입농도 3 mg/L일 때 Sulfonamide계 항생제, Acetaminophen, Naproxen은 100 %, Trimethoprim은약 98%로높은제거효율을나타내었으며 Erythromycin은 약 55 %, Aspirin은 약 10 %로 낮은 제거율을 보여 주었다. 분말활성탄 흡착 공정을 적용하였을 때, 분말활성탄 주입 농도가 증가할수록 제거율이 증가되었다. Sulfonamide계 항생제의 경우 1 mg/L에서 약 18~50 % 제거율을 보였으며, 25 mg/L에서는 약 80 % 이상으로 제거율이 증가하였다. 정수처리 공정에서 잔류의약물질의 효율적인 처리를 위한 염소처리와 흡착, 응집 공정의 적정 주입농도를 평가한 결과 염소 3 mg/L, 분말활성탄 10 mg/L, 응집제 15 mg/L을 적용했을 때 약 90 % 이상이 제거되었다.

정수처리공정에서 bisphenol-A의 제거에 관한 연구 (Bisphenol-A Removal in Conventional Water Treatment Systems)

  • 김혜리;이윤진;박선구;남상호
    • 한국환경보건학회지
    • /
    • 제30권1호
    • /
    • pp.59-64
    • /
    • 2004
  • This study was carried out to investigate influencing factors of bisphenol A(BPA) removal characteristic in conventional water treatment systems to be connected with coagulation, sedimentation, filtration and disinfection. The result are summarized as follows; In BPA removal, optimal doses of PAC, alum, ferric chloride were 7.5 mg Al/L, 10.0 mg AI/L, 15.0 mg Fek. PAC was most effective coagulant to remove BPA. In coagulation process, BPA removal efficiency were increased about 2% by adjusting pH of raw water as 6. At temperature rise 1$0^{\circ}C$, BPA removal efficiency were increased 0.94%. but BPA removal efficiency in sand filtration process were under 1 %ie, so that BPA was almost not removed. At free chlorine dose 1, 2 mg/L, the reaction rate constant k in the BPA removal have been calculated to be 0.397, 0.953 min$^{-1}$ . At free chlorine dose 1, 2 mg/1-, degradation reaction of BPA was completed during 10 min and BFA removal efficiencies were 97.66, 99.99% at this time.

질소제거공정과 결합한 2상 혐기성 소화공정에서 돈분폐수의 메탄생성 및 질소제거 (Methane Production and Nitrogen Removal from Piggery Wastewater in the TPAD Coupled with BNR Process)

  • 박노백;박상민;최우영;전항배
    • 한국물환경학회지
    • /
    • 제25권1호
    • /
    • pp.18-25
    • /
    • 2009
  • Nitrogen removal and methane production from piggery wastewater were investigated in two-phase anaerobic digestion (TPAD) coupled with biological nitrogen removal (BNR) process at $35^{\circ}C$. Methane production rate was about $0.7L/L{\cdot}day$ at organic loading rate (OLR) of $1.2g{\cdot}TCOD/L{\cdot}day$ in methanogenic UASB. Conversion efficiency of the removed TCOD into methane in UASB was as high as 72% and overall TCOD removal efficiency in this system was over 97%. Ammonia nitrogen were stably removed in BNR system and overall efficiency were 98%. With recirculation of the nitrified final effluent to TPAD, nitrogen oxides were completely removed by anaerobic denitrification in the acidogenic reactor, which did not inhibit the acidogenic activities. Overall TN removal efficiency in the TPAD-BNR system was as high as 94%.

산업폐수처리를 위한 호기성 생물막 유동층 반응기의 연구(II) -유기물 충격 부하가 미생물 성장에 미치는 영향- (A Study on an Aerobic Fluidized-Bed Biofilm Reactor for Treating Industrial Wastewaters(II) -Effect of Organic Shock Loading Rate on Biomass Characteristics-)

  • 안갑환;박영식;최윤찬;김동석;송승구
    • 한국환경과학회지
    • /
    • 제2권4호
    • /
    • pp.325-330
    • /
    • 1993
  • A number of experiments were conducted in order to investigate the organic removal efficiency and biomass characteristics according to the organic shock loading rate in a fluidized bed biofilm reactor. At the operation conditions of HRT, 8.44 hour, superficial upflow velocity, 0.9 cm/sec and temperature, 22$\pm$$1^{\circ}C$, the removal efficiency of SCOD was founded to be 96.5, 92 and 90 % with the organic shock loading rate of 3.5, 10.8 and 33 kgCOD/m$^3$ㆍday, respectively. Within the F/M ratio ranged 0.4 to 2.0 kgCOD/kgVSSㆍday, the SCOD removal efficiency was shown as 90% at F/M ratio of 2.0 kgCOD/kgVSSㆍday, but the TCOD removal efficiency was 72 % at F/M ratio of 1.8 kgCOD/kgVSSㆍday. The average biomass concentrations were 7800, 14950 and 27532 mg/l on the organic shock loading rate of 3.5, 10.8 and 33 kgCOD/$\textrm{m}^3$ㆍday, respectively. This result was agreed with the fact that more biomass could be produced at high concentration of substrate, but some biomass was detached at the onset of shock and easily acclimated at the shock condition.

  • PDF

Effect of Contaminant Source Location on Indoor Air Quality

  • Lee, Hee-Kwan;Kim, Shin-Do
    • Journal of Korean Society for Atmospheric Environment
    • /
    • 제14권E호
    • /
    • pp.1-7
    • /
    • 1998
  • This paper presents an experimental study for understanding the indoor air quality in a room. A model room, which had a ceiling-mounted supply and a sidewall-mounted exhaust, was used to examine the effect of air exchange rate (AER) and contaminant source location (CSL) as a function of the elapsed time. A tracer gas method, using carbon monoxide tracer, gas analyzers, and a data acquisition system, was applied to study the ventilation air distribution and the tracer removal efficiency, so-called pollutant removal efficiency, in the model room. The experiment was composed of two parts; firstly the AER was varied to examine its effect on the ventilation air distribution and the ventilation effectiveness and secondly both AER and CSL were considered to determine their effect on the pollutant removal efficiency. It was found that the ventilation effectiveness in the model was proportional to AER but not linearly. It was also found that changing the CSL can improve the pollutant removal efficiency. In some cases, the efficiency improvement by increasing AER was achieved by simply changing CSL.

  • PDF

폐비닐 재활용 여재를 이용한 소규모 오수종말처리장의 효율검증 (Efficiency Verification of Small-Scale Sewage Treatment Plant Using Discussed Vinyl as Biofilm Media)

  • 임재명;김병욱;구본수
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.1-6
    • /
    • 1998
  • This study was conducted to use disused vinyl as biofilm for biological sewage treatment. Efficiency verification was performed on laboratory and on-site plant. In laboratory study, total biochemical oxygen demand(TBOD) removal rate was ranged 94.8~97 % in each hydraulic retention tim(HRT), 12, 16, 20, 24 hr, respectively. At that time, filling rate was 50 %. And effluent TBOD concentration was low ranged 3.64~6.28 mg/L. In on-site plant, TBOD removal rate was ranged 88.2~96.8 % and effluent TBOD concentration was 4.8~17.7mg/L. This concentration was lower than disign effluent concentration, 30mg/L. Total kjeldhal nitrogen(TKN) removal efficiency was ranged 56.8~90.9%. This was resulted higher than Lab. scale treatment efficiency.

  • PDF

섬모상담체를 이용한 고도처리공정의 운전인자 도출 (Proposed Operating Parameters for Advanced Treatment Process using a Cilium Media BNR Process)

  • 안윤희;박찬규;고광백;이강수
    • 한국물환경학회지
    • /
    • 제23권5호
    • /
    • pp.761-765
    • /
    • 2007
  • The study were conducted in order to investigate the effect of operating parameters including the internal recycle (nitrification return) rates, hydraulic retention times (HRTs) and temperature when using a cilium media method. The first experiment was for evaluating the effect of HRT (12 hr, 10 hr, 8 hr, 6 hr, 4 hr). The second experiment was for analyzing effect of internal recycle rate (100%, 200%, 300%, 400%). As a result of the first experiment, BOD was removed to 97~98% for 6~8 hr HRT. Effluent water quality was not significantly influenced with HRT within that range. However the nitrogen removal was sensitive to HRT. T-P removal efficiency was invariable at various HRTs. The average BOD removal efficiency was about 97% in spite of change of internal recycle rate while T-N removal efficiency was increased at the internal recycle rate of 100~200%, but invariable at the internal recycle rate of 200~300%.

유기물 부하가 Anaerobic Hybrid Reactor 운전효율에 미치는 영향 (Effect of Organic Loading Rate on the Performance of Anaerobic Hybrid Reactor)

  • 신창하;오대양;김태훈;박주양
    • 상하수도학회지
    • /
    • 제26권4호
    • /
    • pp.497-502
    • /
    • 2012
  • Anaerobic Digestion Process is evaluated as efficient wastewater treatment process with the removal of high concentrations of organic waste and production of biogas. This study was performed using hybrid anaerobic hybrid reactor (AHR) which consists of anaerobic sludge blanket (UASB) and biofilm-coated filter media was applied for Palm Oil Mill Effluent (POME) for 80 days to know optimum removal efficiency and production of biogas by comparing each part which divided changing Organic Loading Rate (OLR). As a result of this study, the removal efficiency was 90.4 % when the organic loading rate of influent was 15 kg COD/$m^3$/day. Since organic loading rate was up to 20 kg COD/$m^3$/day, the removal rate declined 80.7%. Over loading of influent caused sludge expansion and overproduction of microorganism. Amount of biogas was collected 82.3 L/day and pH was remained 6.9 constantly with balance of alkalinity.