For the removal of heavy metals, Cd, Cu and Cr were used. The initial concentration of Cd and Cu were 1-10 ppm, the removal efficiency of Cd and Cu was 76.2-89.0% and 69.0-79.0%, respectively. The initial concentration of Cr were 1~5 ppm, and the-removal efficiency was low especially at high concentration. In general, the initial concentrations of heavy metals had no relation to the removal efficiency. At the beginning, the removal efficiency was very high, but it was maintained at constant concentration. The trends of accumulations of heavy metals in the stem increased in proportion to the initial concentration. The removal efficiency of heavy metals increased a little bit when nutrients existed in the solution. So that, the initial concentration of Cd and Cu were 1-10 ppm, the removal efficiency of Cd and Cu was 84.8-91.0% and 75.9-82.0%. The initial concentration of Cr were 1-5 ppm, the removal efficiency was 25.0-67.0%.
In this study, the of MBBR(moving bed biofilm reactor) process for Phosphorus Removal efficiency depending on seasons and the factors affecting phosphorus removal efficiency in the process is evaluated. As a result of experiment, T-P removal efficiency has its highest value in winter, (80.8%). and T-P removal efficiency has its lowest value in autumn, (49%). Optimum SRT for Phosphorus Removal revealed is about 8.8 days and process performs more efficiently as the temperature decreases. It is accepted that nitrate to anaerobic zone is affecting the Phosphorus removal process. With increasing the organic loading rate, Phosphorus removal efficiency also increases. Also, an experiment has been conducted to find out the highest efficiency according to Media existence and it has revealed that Media addition provides better phosphate removal.
The study was conducted to know the possibility that the removal efficiency of organic and suspended solids(SS) could be increased by suppling of sea water and the optimum amount of sea water to be supplied treat bleaching waste water by lime coagulation settlement at pulp mill process. When the lime dosage was increased, the removal efficiency of COD and SS in the waste water was increased based on the removal efficiency of COD and SS. The lime dosage and removal efficiency was increased proportionally with the lime concentration of 4,000 mg/l, but the increase of removal efficiency was presented slightly above the 4,000mg/l. It was evaluated that the removal efficiencies of COD and SS could be increased and the requirement of lime dosage could be decreased by the sea water supplement. The removal efficiency of SS was most increased when the sea water supplement was 10% or more in the waste water. The removal efficiencies of COD was the best at 4% sea water excepting the dilution efficiency by sea water supplement.
Various environmental conditions affecting total phosphorus removal from farm wastewater in a biofilm filter process were investigated using loess balls and Chromobacterium LEE-38 at a pilot plant. When Chromobacterium LEE-38 was used, the removal efficiency of total phosphorous was approximately 10- or 5-fold higher than that of Acinetobacter CHA-2-14 or Acinetobacter CHA-4-5, respectively. When a loess ball of $11{\sim}14mm$ manufactured at a $960^{\circ}C$ calcining temperature was used, the removal efficiency of total phosphorous was 90.0%. When 70% of the volume fraction was used, the maximum efficiency of total phosphorus removal was 93.1%. Notably, when the initial pH was in the range of 6.0 to 8.0, the maximum removal efficiency of total phosphorus was obtained after 30 days. When the operating temperature was in the range of 30 to $55^{\circ}C$, the maximum removal efficiencies of total phosphorus, 95.6 to 94.6%, were obtained. On the other hand, at operating temperatures below $20^{\circ}C$ or above $40^{\circ}C$, the removal efficiency of total phosphorous decreased. Among the various processes, biofilm filter process A gave the highest removal efficiency of 96.4%. Pilot tests of total phosphorus removal using farm wastewater from the biofilm filter process A were carried out for 60 days under optimal conditions. When Acinetobacter sp. Lee-11 was used, the average removal efficiency in the p-adsorption area was only 32.5%, and the removal efficiencies of chemical oxygen demand (COD) and biological oxygen demand (BOD) were 56.7 and 62.5%, respectively. On the other hand, when Chromobacterium LEE-38 was used, the average removal efficiency was 95.1%, and the removal efficiencies of COD and BOD were 91.3 and 93.2%, respectively.
Journal of Korean Society for Atmospheric Environment
/
v.18
no.E1
/
pp.13-20
/
2002
The electrical and chemical properties of the dielectric barrier discharge (DBD) process for the benzene removal were investigated. The benzene removal was initiated with the applied voltage higher than the discharge onset value. The removal efficiency over 95 % was obtained at approximately 1.6 kJ lite $r^{r-1}$ of the electrical energy density. The increase of the inlet concentration decreased the removal efficiency. However, the benzene decomposition rate increased with the inlet concentration . While the increase of the gas retention time enhanced the removal efficiency, the decomposition rate decreased. Identification of the optimum condition between the decomposition rate and the removal efficiency is required for field applications of the DBD process.s.
Adapting two step aeration system to a waste water treatment of W-paper manufactory as Full-Scale Plants, we drew a following conclusion from its practical working. 1. Because BOD removal efficiency was 20% in A-Stage, 90% in B-Stage and total removal efficiency was 97%. It worked treatment plant well and was suitable for effluent water standard as well. Because COD removal efficiency was 42% in A-stage, 71% in B-stage and the total removal efficiency was 94% COD control was possible in effluent water quality. 2. Treatment efficiency according to a load capacity was average 20% in 1.401 BOD kg/m3/d load of A-Stage and average 90% in 0.273 BOD kg/$\textrm {m}^3$ / d load of B-Stage. 3. Treatment efficiency according to a ratio of F/M was 2.657--5.024 kg BOD/kg MLSS/d in A-Stage and BOD removal efficiency was 16-261 in the same stage. The ratio of F/M was 0.068-0.094 kg BOD /kg MLSS/d and BOD removal efficiency ratio was 85-94%. Therefore treatment efficiency could be kept stably and volume of aeration tank could be reduced wholly. 4. Treatment efficiency according to MLSS appeared BOD 20%. COD 42%, in A-Stage and removal efficiency appeared BOD 90%, COD 71% in B-Stage. They were suitable for plan condition. 5. Because of working of complemented treatment plant by AB-Process. 20,000,000 Won a month was saved than the ordinary working cost. Therefore, it was assumed that invested cost could be recollected in 19 months or so consequently.
This study was performed to assess the removal efficiency on nitrogen, phosphorus and organic carbon in wastewater by spatial separation and internal recycling in a modified oxidation ditch process (modified OD). The performances of the modified OD were evaluated via laboratory-scale experiments. The process was operated at hydraulic retention times of 6-48 hours and solid retention times of 17-38 days. We found that organic carbon removal efficiency increased after the modified OD operation period. T-N removal efficiency remained stable; average T-N concentration of effluent was 8.02 mg/l after modified OD operation. In contrast, T-P concentration of effluent was over 1 mg/l. Nitrogen and phosphorus removal efficiency of modified OD at HRT 12 hr were 83.1% and 74.1%, respectively. Also, maximum efficiency was found at SRTs from 20 to 30 days. T-N removal efficiency was 83.1% at a C/N ratio from 3.0 to 3.5. However, T-N removal efficiency decreased at C/N ratios over 3.5. Also, T-P removal efficiency increased with HRT at C/P ratios in the same condition. Maximum efficiency was 74.1% at a C/P ratio from 25 to 28. T-N removal efficiency was 79.2% and T-P removal efficiency was 65.3% after M4 mode operation (added to the internal recycle line connected to the anoxic reactor). The modified OD with spatial separation and internal recycling developed in this study is, therefore, believed to be an improvement for solving problems in the nutrient removal technologies.
Journal of Korean Society for Atmospheric Environment
/
v.18
no.5
/
pp.337-344
/
2002
In this study, we analyzed the NO removal efficiency by the pulsed corona discharge process and investigated the effects of several process variables such as initial concentrations of NO, $H_2O$, and NH$_3$, applied voltage, pulse frequency, diameter of the discharge electrode, and residence time. The removal efficiency of NO increased by the addition of $H_2O$ or NH$_3$, but the changes of initial NH$_3$ and $H_2O$ concentrations did not affect the removal efficiency of NO significantly. With the increases of the applied voltage or the residence time, the removal efficiency of NO increased. In addition, with the increases of the pulse frequency of applied voltage, or the diameter of the discharge electrode, the removal efficiency of NO increased. The experimental results can be used as a basis to design the pulsed corona discharge process to remove NO$_{x}$, SO$_{x}$ and VOCs.OCs.
It is not too much to say that the territorial inhabitants' concerns are wholly c concentrated on the environmental preservation-problem and development-problem in Korea given effect to the local self-government system. At a time like this I was studied the effect on nutrients removal through lighting period in aerobic high rate pond and we know that waste stabilization pond method is the most economical and energy saving wastewater treatment technology than others. At the results which was studied through operating the reactor-l artifically main-tained at a temperature, $25^{\circ}C$, a light intensity, 3000lux, and a lighting period, 24hrs and the reactor-2 artifically maintained at a tern야rature, $25^{\circ}C$ and a light intensity 3000lux, and a lighting period period, 12hrs, It has appeared for 24hrs.-lighting period -reactor-1 to be prior to the reactor-2. The attained results are that 1. reactor-1 is prior to reactor-2 on oxygen-generation 2. reactor-1 is prior to reactor-2 on algal production 3. COD removal efficiency, 90.76%, T-N removal efficiency, 80%, T-P removal e efficiency, 74.47 % in reactor-2, in reactor-1 COD removal efficiency, 94.85 %, T-N removal efficiency, 98.07%, T-P removal efficiency, 72.13% are, so the treatment efficiency of reactor-1 is more excellent than things of reactor-2 4. it appeared that the detention time is 8, 9days.
PURPOSES : This study evaluates the efficiency of snow removal operation resources using data envelopment analysis (DEA). The results of this study can help decision-making strategies, especially for resource allocation for snow removal works on national highways. METHODS : First, regional road management offices (DMUs) for efficiency evaluation were set up, and a database (for years 2012-2016) for analysis was formed. Second, DEA was carried out by selecting input and output variables based on the constructed database. Lastly, based on the results of the DEA, the efficiency of each regional road management office was evaluated. In addition, the potential for future improvement was determined. RESULTS : The results showed that there was a large variation in efficiency of snow removal operation resources by regional offices. CONCLUSIONS : The results of this study imply that the evaluation of efficiency for snow removal operation resources is important when decisions related to snow-removal strategies are made by road management offices.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.