역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

데크플레이트를 활용한 탈형 보-데크 거푸집 시스템 개발 (Development of Removable Deck Plate Formwork System for Beams)

  • 정주홍;정형석;최창식;최현기
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제25권6호
    • /
    • pp.60-67
    • /
    • 2021
  • 최근 기존 재래식 거푸집 시스템의 다양한 문제를 해결하기 위하여, 데크플레이트를 거푸집으로 활용하는 방법이 개발되어 사용되고 있다. 이러한 데크플레이트 거푸집 시스템은 대부분 데크플레이트를 부재에 매립하여 영구 존치 시키는 방법으로 기존 거푸집 시스템에 비해 경제적이며 시공성이 높다. 그러나 매립형 데크플레이트 거푸집 시스템의 경우 폭이 좁고 철근 배근이 복잡한 보와 같은 부재에 대해서는 콘크리트의 충진을 확인하기 어렵고 데크플레이트의 부식 등 시공 및 유지관리 측면에서 다양한 문제점이 있음이 보고되고 있다. 이에 본 연구에서는 보 부재 제작 시 콘크리트 양생 후 데크플레이트를 제거할 수 있는 탈형 보-데크 거푸집 시스템을 개발하고자 하였다. 본 시스템은 거푸집 역할을 수행할 수 있는 데크플레이트 모듈과 콘크리트 측압에 의한 변형을 막아주는 프레임과 선 배근되는 철망 그리고 이를 결합하는 접합부로 구성되어 있다. 연구결과 개발 시스템의 경우 시공성이 우수하고 콘크리트의 측압에 의한 변형을 효율적으로 막아주며, 손쉽게 제거가 가능함을 확인하였다.