• Title/Summary/Keyword: Reliability target

Search Result 819, Processing Time 0.025 seconds

On Software Reliability Engineering Process for Weapon Systems (무기체계를 위한 소프트웨어의 신뢰성 공학 프로세스)

  • Kim, Ghi-Back;Lee, Jae-Chon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.4B
    • /
    • pp.332-345
    • /
    • 2011
  • As weapon systems are evolving into more advanced and complex ones, the role of the software is becoming heavily significant in their developments. Particularly in the war field of today as represented by the network centric warfare(NCW), the reliability of weapon systems is definitely crucial. In this context, it is inevitable to develop software reliably enough to make the weapon systems operate robustly in the combat field. The reliability engineering activities performed to develop software in the domestic area seem to be limited to the software reliability estimations for some projects. To ensure that the target reliability of software be maintained through the system's development period, a more systematic approach to performing software reliability engineering activities are necessary from the beginning of the development period. In this paper, we consider the software reliability in terms of the development of a weapon system as a whole. Thus, from the systems engineering point of view, we analyze the models and methods that are related to software reliability and a variety of associated activities. As a result, a process is developed, which can be called the software reliability engineering process for weapon systems (SREP-WS), The developed SREP-WS can be used in the development of a weapon system to meet a target reliability throughout its life-cycle. Based on the SREP-WS, the software reliability could also be managed quantitatively.

A Study on the Reliability Comparison of S/W between Uniform Testing and Weibull Testing (소프트웨어의 일정테스트노력과 웨이불 테스트 노력의 비교 연구)

  • Che, Gyu-Shik;Kim, Yong-Kyung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.05a
    • /
    • pp.444-447
    • /
    • 2006
  • We propose software reliability growth model, considering testing effort resource during testing stage of S/W, and compare the time dependent testing effort resource behavior in this paper. We develop the data technology method for the S/W reliability measure. We study in detail between the time elapse and reliability. Also, we determine the optimum release time which meets the target reliability. We decide optimum release time for each condition how the reliability is good before testing after development.

  • PDF

Relations of Safety Factor and Reliability Index for Pile Load Capacity (말뚝 기초지지력에 대한 안전율과 신뢰도지수 평가)

  • Kim, Dae-Ho;Lee, Jun-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.466-475
    • /
    • 2006
  • Reliability analysis between safety factor and reliability index for driven and bored pile load capacity was analyzed in this study. 0.1B, Chin, De Beer, and Davisson's methods were used for determining pile load capacity by using load-settlement curve from pile load test. Each method define ultimate, yield and allowable pile load capacities. LCPC method using CPT results was performed for comparing with results of pile load test. Based on FOSM analysis using load factors, it is obtained that reliability indices for ultimate pile load capacity were higher than those of yield and allowable condition. Present safety factor 2 for yield and allowable load capacities are not enough to satisfy target reliability index $2.0\sim2.5$. However, it is sufficient for ultimate pile load capacity using safety factor 3.

  • PDF

Reliability Management Process for the Development of a Prototype Train (시제열차 개발에서의 신뢰성 관리 체계)

  • Choi, Sung-Hoon;Park, Choon-Soo;Lee, Tae-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1083-1088
    • /
    • 2008
  • The first task for the development of a train system is to define the system and to determine its requirements. Reliability target is one of the requirements defined in the system requirements. In railway applications it is advised to follow the procedures given in IEC 62278 to fulfill reliability requirements. The reliability requirements are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with the reliability management and assessment plan carried out for the on-going "Next generation high-speed train development project".

  • PDF

FORM Reliability-based Resistance Factors for Driven Steel Pipe Piles (FORM 신뢰성 기반 항타강관말뚝 저항계수 산정)

  • Park, Jae-Hyun;Huh, Jung-Won;Lee, Ju-Hyung;Chung, Moon-Kyung;Kwak, Ki-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.779-783
    • /
    • 2008
  • LRFD Resistance factors for static bearing capacity of driven steel pipe piles were calibrated in the freamework of reliability theory. Reliability analysis was performed by the First Order Reliability Method (FORM) using resistance bias factor statistics.The target reliability indices are selected as 2.0 and 2.33 for group pile case and 2.5 for single pile case, based on the reliability level of the current design practice and considering redundancy of pile group, acceptable risk level, construction quality control, and significance of individual structure.

  • PDF

Statistical Analysis of the Performance Reliability Data for Stroke Patients (뇌졸중 환자 운동신뢰성 측정치의 통계적 분석)

  • Byun, Jae-Hyun;Lee, Seung-Mi
    • Journal of Applied Reliability
    • /
    • v.16 no.1
    • /
    • pp.64-70
    • /
    • 2016
  • Purpose: The purpose of this study was to evaluate performance reliability of stroke patients using kinematic analysis. Methods: A protocol to evaluate performance reliability was performed for three tasks on 20 stroke patients and 10 normal people. The tasks include hand to head (HH) task, hand to mouth (HM) task, and hand to target (HT) task. Results: The affected arms showed smaller joint angle, slower peak velocity, longer time to peak velocity for task performances than control group. Also, slower peak velocity and longer movement time for task performance in unaffected arm of stroke patients were obtained compared with the control group. Conclusion: Kinematic analysis is very useful quantitative tool to provide understanding on upper extremity function of stroke patients.

A 2D FLIR Image-based 3D Target Recognition using Degree of Reliability of Contour (윤곽선의 신뢰도를 고려한 2차원 적외선 영상 기반의 3차원 목표물 인식 기법)

  • 이훈철;이청우;배성준;이광연;김성대
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.12B
    • /
    • pp.2359-2368
    • /
    • 1999
  • In this paper we propose a 2D FLIR image-based 3D target recognition system which performs group-to-ground vehicle recognition using the target contour and its degree of reliability extracted from FLIR image. First we extract target from background in FLIR image. Then we define contour points of the extracted target which have high edge gradient magnitude and brightness value as reliable contour point and make reliable contour by grouping all reliable contour points. After that we extract corresponding reliable contours from model contour image and perform comparison between scene and model features which are calculated by DST(discrete sine transform) of reliable contours. Experiment shows that the proposed algorithm work well and even in case of imperfect target extraction it showed better performance then conventional 2D contour-based matching algorithms.

  • PDF

A Method of Reliability Growth Management Test Design for Continuous System (연속형 시스템의 신뢰성 성장 관리 시험 설계 방안)

  • Seo, Yang Woo;Yoon, Jung Hwan;Lee, Seung Sang;Um, Chun Sup
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.87-96
    • /
    • 2020
  • In this paper we proposed the test design method of reliability growth management. First, we presented the process for establishing the reliability growth management test design considering the number of failures and the termination test time. Reliability growth analysis of continuous system was performed in accordance with the test design process presented. In case the reliability test result is not met with the reliability target value after more than three failures occurred, the required test times were analyzed that 1,725 hrs for one corrective action, 1,950 hrs for two corrective actions. If the number of failures is less than three, design a reliability demonstration test according to confidence level 80% and 90% was performed using RGA 11 Software. As a result, it is possible to establish the reliability growth management test design with sufficient use of available resources. The results of this study can be used when establishing a test design for assessment of reliability growth management of all continuous systems.

Reliability Improvement of an Auto Transfer Switch (자동 전환 개폐기의 신뢰성 향상에 관한 연구)

  • Cho, Hyung Jun;Baek, Jung-Ho;Yeu, Bong-Ki;Kang, Tae-Seok;Kim, Kil-Sou;Yang, Il Young;Yoo, Hwan Hee;Yu, Sang Woo;Kim, Yong Soo
    • Journal of Applied Reliability
    • /
    • v.16 no.2
    • /
    • pp.162-170
    • /
    • 2016
  • Purpose: The purpose of this study was to analyze the failure modes of an auto transfer switch (ATS), determine the most common failure mechanisms, and iterate the design to improve reliability. Methods: We carried out failure mode and effect analysis (FMEA) to determine the failure modes and mechanisms. We identified the parts or modules that required improvement via two-stage quality function deployment based on FMEA, and improvements to reliability were monitored using the Gomperz growth model. Results: The main failure modes of the ATS were damage to, and deformation of, the stator / movable element due to repetitive movements. Five iterations of design modification were carried out, and the mean time to failure (MTTF) increased to 14,539 cycles, corresponding to 85% of the target MTTF. The Gompertz growth model indicates that the 10th iteration of design modification is expected to achieve the target MTTF. Conclusion: We improved the reliability of mechanical parts via failure mode analysis, and characterized the iterative improvements in the MTTF using the Gompertz growth model.