Sensitivity analysis of pump and tank sizes on water network operation and water age (송수펌프용량 및 배수지규모에 따른 송·배수시스템의 운영비용 및 체류시간 분석)

  • Kim, Kangmin;Choi, Jeongwook;Jung, Donghwi;Kang, Doosun
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.12
    • /
    • pp.803-813
    • /
    • 2017
  • Recently, various studies have been conducted to optimize the pump operation scheduling and/or the pump/tank size minimizing the system cost of water distribution network. Prior to that, it is important to understand the sensitivity of pump/tank size on the system cost and overall water quality. Here, we have performed the sensitivity analysis to investigate the effect of pump/tank size on the economic cost (construction and operation) and water quality (water age). The analysis was applied on a real, large-scale water transmission network currently operating in South Korea. The results revealed that the pump/tank size has a strong influence on system construction/operation costs. Especially, the tank size has a significant effect on the system-wide water quality. In the case of applied networks, the operating cost decreases as the capacity of the facility increases, but the design cost increases. Using a sensitivity analysis, a suitable range of pump/tank size could be suggested to minimize costs and stabilize the water quality at the same time prior to a system design.

Volume Rendering System of e-Science Electron Microscopy using Grid (Gird를 이용한 e-사이언스 전자현미경 볼륨 랜더링 시스템)

  • Jeong, Won-Gu;Jeong, Jong-Man;Lee, Ho;Choe, Sang-Su;Ahn, Young-heon;Hur, Man-Hoi;Kim, Jay;Kim, Eunsung;Jung, Im Y.;Yeom, Heon Y.;Cho, Kum Won;Kweon, Hee-Seok
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.560-564
    • /
    • 2007
  • Korea Basic Science Institute(KBSI) has three general electron microscopes including High Voltage Electron Microscope(HVEM) which is the only one in Korea. Observed images through an electron microscope are what they are tilted by each step and saved, offering the more better circumstances for observers, a reconstruction to 3D could be a essential process. In this process, a warping method decreases distortions maximumly of avoided parts of a camera's focus. All these image treatment processes and 3D reconstruction processes are based on an accompaniment of a highly efficient computer, a number of Grid Node Personal computers share this process in a short time and dispose of it. Grid Node Personal computers' purpose is to make an owner can share different each other and various computing resources efficiently and also Grid Node Personal computers is applying to solve problems like a role scheduling needed for a constructing system, a resource management, a security, a capacity measurement, a condition monitoring and so on. Grid Node Personal computers accomplish roles of a highly efficient computer that general individuals felt hard to use, moreover, a image treatment using the warping method becomes a foundation for reconstructing to more closer shape with an real object of observation. Construction of the electron microscope volume 랜더링 system based on Grid Node Personal computer through the warping process can offer more convenient and speedy experiment circumstances to observers, and makes them meet with experiment outcome that is similar to real shapes and is easy to understand.

  • PDF

A Critical Path Search and The Project Activities Scheduling (임계경로 탐색과 프로젝트 활동 일정 수립)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.1
    • /
    • pp.141-150
    • /
    • 2012
  • This paper suggests a critical path search algorithm that can easily draw PERT/GANTT chart which manages and plans a project schedule. In order to evaluate a critical path that determines the project schedule, Critical Path Method (CPM) is generally utilized. However, CPM undergoes 5 stages to calculate the critical path for a network diagram that is previously designed according to correlative relationship and execution period of project execution activities. And it may not correctly evaluate $T_E$ (The Earliest Time), since it does not suggest the way how to determine the sequence of the nodes activities that calculate the $T_E$. Also, the sequence of the network diagram activities obtained from CPM cannot be visually represented, and hence Lucko suggested an algorithm which undergoes 9 stages. On the other hand, the suggested algorithm, first of all, decides the sequence in advance, by reallocating the nodes into levels after Breadth-First Search of the network diagram that is previously designed. Next, it randomly chooses nodes of each level and immediately determines the critical path only after calculation of $T_E$. Finally, it enables the representation of the execution sequence of the project activity to be seen precisely visual by means of a small movement of $T_E$ of the nodes that are not belonging to the critical path, on basis of the $T_E$ of the nodes which belong to the critical path. The suggested algorithm has been proved its applicability to 10 real project data. It is able to get the critical path from all the projects, and precisely and visually represented the execution sequence of the activities. Also, this has advantages of, firstly, reducing 5 stages of CPM into 1, simplifying Lucko's 9 stages into 2 stages that are used to clearly express the execution sequence of the activities, and directly converting the representation into PERT/GANTT chart.