Manufacturing characteristic of major components for prototype SFR (소듐냉각고속로(원형로) 주요기기 제작 특성)

  • Choi, Han Kwang;Lee, Jung Gon;Jun, Il Jung;Kim, Se-Hun;Lee, Jeong Kyu;Kim, Yong Su;Kim, Chul;Ahn, Dong Hyun
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.115-125
    • /
    • 2016
  • The prototype SFR has currently been under design by KAERI. The size of its major components is much larger than that of APR1400 and high temperature materials are applied for it. The increased size of components and those specific materials effect on material procurement, manufacturing process and fabrication facilities. The manufacturing methods are studied for Reactor Vessel/Guard Vessel, Control Rod Drive Mechanism, Heat Exchanger, Primary Pump, Reactor Vessel Internals, Steam Generator and In-Vessel Transfer Machine. The proper manufacturing methods are suggested for each component including side forging technology for ultra large forgings of Reactor Vessel to minimize the weld seams on which In-service Inspection should be conducted.

PWSCC and System Engineering Development of Internal Inspection and Maintenance Methodology for RCS

  • Abdallah, Khaled Atya Ahmed;Mesquita, Patricia Alves Franca de;Yusoff, Norashila;Nam, GungIhn;Jung, JaeCheon;Lee, YoungKwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.1
    • /
    • pp.89-103
    • /
    • 2016
  • Due to safety of the plant, it became very clear the importance of study occurrence reactor coolant system (RCS) issues specially the primary water stress corrosion cracking (PWSCC). The Systems Engineering (SE) approach is characterized by the application of a structured engineering methodology for the design of a complex system or component. Robotic devices have been used for internal inspection, maintenance and performing remote welding and inspection in high-radiation areas. In this paper, PWSCC overview and inlay and over lay welding methodology introduced, concept of robotic device that can be inserted into the piping via Steam Generator (SG) main way to access to primary piping of pressurized water reactor (PWR) is developed based on SE methodology. A 3D model of the inspection system was developed along with the APR1400 (Advanced Power Reactor)reactor coolant systems (RCS) and internals with virtual 3D simulation of the operation for visualization to prove the validity of the concept.

Structural Analysis and Measuring Locations of Upper Guide Structure Assembly in APR1400 (APR1400 상부안내구조물집합체 구조해석 및 측정위치 선정)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.1
    • /
    • pp.49-55
    • /
    • 2013
  • A reactor vessel internals comprehensive vibration assessment program(RVI CVAP) of an advanced power reactor 1400(APR1400) is being performed as a non-prototype category-2 type of reactor based on the US nuclear regulatory commission regulatory guide(NRC RG) 1.20. The aim of this paper is to present the results of structural response analysis and measuring locations of a upper guide structure(UGS) assembly of the APR1400 reactor. The analysis results of the UGS assembly show that the specified integrity levels meet the design acceptance criteria. Also, the measuring locations are determined by the analysis results of the UGS assembly and selection criteria of previous study. These analysis results and measuring locations will be used as a guide to design a measurement system for the APR1400 RVI CVAP.

Generation of Pressure/Temperature Limit Curve for Reactor Operation (원자로 운전을 위한 압력/온도 한계곡선의 설정)

  • 정명조;박윤원
    • Computational Structural Engineering
    • /
    • v.10 no.4
    • /
    • pp.155-164
    • /
    • 1997
  • A reactor pressure vessel, which contains fuel assemblies and reactor vessel internals, has the thermal stress resulting from the cool-down and heat-up of the vessel wall in combination with the pressure stress from system pressure resulting in large stresses. The combination of the pressure stress and thermal stress along with a decrease in fracture toughness may cause through-wall propagation of a relatively small crack. Therefore, it is necessary to define the relations between operating pressure and temperature during cool-down and heat-up. In this study, theory of fracture mechanics for a pressure/temperature limit curve is investigated and a numerical procedure for generating it is developed. Plant-specific limit curves for the Kori unit 1 plant, the oldest nuclear power plant in Korea, have been obtained for several cooling and heating rates and their results are discussed.

  • PDF

The Effects of Impurity Composition and Concentration in Reactor Structure Material on Neutron Activation Inventory in Pressurized Water Reactor (경수로 구조재 내 불순물 조성 및 함량이 중성자 방사화 핵종 재고량에 미치는 영향 분석)

  • Cha, Gil Yong;Kim, Soon Young;Lee, Jae Min;Kim, Yong Soo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.14 no.2
    • /
    • pp.91-100
    • /
    • 2016
  • The neutron activation inventories in reactor vessel and its internals, and bio-shield of a PWR nuclear power plant were calculated to evaluate the effect of impurity elements contained in the structural materials on the activation inventory. Carbon steel is, in this work, used as the reactor vessel material, stainless steel as the reactor vessel internals, and ordinary concrete as the bio-shield. For stainless steel and carbon steel, one kind of impurity concentration was employed, and for ordinary concrete five kinds were employed in this study using MCNP5 and FISPACT for the calculation of neutron flux and activation inventory, respectively. As the results, specific activities for the cases with impurity elements were calculated to be more than twice than those for the cases without impurity elements in stainless and carbon steel. Especially, the specific activity for the concrete material with impurity elements was calculated to be 30 times higher than that without impurity. Neutron induced reactions and activation inventories in each material were also investigated, and it is noted that major radioactive nuclide in steel material is Co-60 from cobalt impurity element, and, in concrete material, Co-60 and Eu-152 from cobalt and europium impurity elements, respectively. The results of this study can be used for nuclear decommissioning plan during activation inventory assessment and regulation, and it is expected to be used as a reference in the design phase of nuclear power plant, considering the decommissioning of nuclear power plants or nuclear facilities.

A Study on the Coolant Mixing Phenomena in the Reactor Lower Plenum

  • Park, Yong-Seog;Park, Goon-Cherl;Um, Kil-Sup
    • Nuclear Engineering and Technology
    • /
    • v.29 no.3
    • /
    • pp.186-195
    • /
    • 1997
  • When asymmetric thermal-hydraulic conditions occur between cold legs, the core inlet temperature will be nonuniform if the coolant is not mixed perfectly in the lower plenum. These uneven core inlet conditions may induce the change in core power distribution. Thus realistic prediction of thermal mixing is important in such abnormal conditions. In this study, reactor internals, which are scaled down as to conserve the flow area ratio, are set up in the model of KORI Unit 1 with the scaling factor of 1/710 by volume and coolant temperatures are measured beneath the lower core plate. Based on experimental results, the ability of COMMIX-1B code to simulate the coolant mixing phenomena in the lower plenum is estimated. The results show that complete mixing never occurs in any conditions and the mixing pattern is characterized according to the plant type.

  • PDF

DEVELOPMENT OF AN IMPROVED INSTALLATION PROCEDURE AND SCHEDULE OF RVI MODULARIZATION FOR APR1400

  • Ko, Do-Young
    • Nuclear Engineering and Technology
    • /
    • v.43 no.1
    • /
    • pp.89-98
    • /
    • 2011
  • The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule.

Power Density Distribution Calculation of a Pressurized Water Reactor with Fullscope Explicit Modeling by MCNP Code

  • Kim, Jong-Oh;Kim, Jong-Kyung
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05a
    • /
    • pp.179-184
    • /
    • 1996
  • Power density distribution and criticality of a pressurized water reactor are calculated with a Monte Carlo calculation using the MCNP code. The MCNP model is based on one-eighth core symmetry. Individual fuel assemblies are modeled with fullscope three dimensional description except grid spacer. The fuel rod is divided into eight axial segments. Core internals above and below the active fuel region is represented as coolant. After 400 cycle calculations, the system converges to a k value of 1.09151$\pm$0.00066. Fission reaction rate in each rod is also calculated to use as the source term in pressure vessel fluence calculation.

  • PDF

Statistical Life Prediction on IASCC of Stainless Steel for PWR Core Internals (가압형 경수로 스테인리스강 내부 구조물의 조사유기 응력부식균열에 대한 통계적 수명 예측)

  • Kim, Sung-Woo;Hwang, Seong-Sik;Lee, Yeon-Ju
    • Korean Journal of Metals and Materials
    • /
    • v.50 no.8
    • /
    • pp.583-589
    • /
    • 2012
  • This work is concerned with a statistical approach to the life prediction on irradiation-assisted stress corrosion cracking (IASCC) of stainless steel (SS) for core internals of a pressurized water reactor (PWR). The previous results of the time-to-failure of IASCC measured on neutron-irradiated stainless steel components were statistically analyzed in terms of stress and irradiation. The accelerating life testing model of IASCC of cold worked Type 316 SS was established based on an inverse power model with two stress-variables, the applied stress and irradiation dose. Considering the variation of the yield strength and applied stress with the irradiation dose in the model, the remaining life of the baffle former bolt was statistically predicted during operation under complex environments of stress and irradiation.

Development of Selection Criteria of Measuring Places for Reactor Vessel Internals Comprehensive Vibration Assessment Program in Advanced Power Reactor 1400 (APR1400 원자로내부구조물 종합진동평가 측정위치 선정기준 개발)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.821-826
    • /
    • 2011
  • A basic concept for selection criteria of measuring places of RVI CVAP is to determine measuring places and sensors based on the results of the hydraulic and structural analysis for RVI CVAP in APR1400. In addition, there is the important selection criteria to determine measuring places for measurement of RVI CVAP ; the first is to choose measuring places according to U.S. NRC R.G. 1.20, the second is to select measuring places by RVI design review, the third is to option on the basis of measurement results of SYSTEM 80, the forth is to decide using review results on a design change of a reactor and the last is to determine using the review on the possibility of installation/removal of sensors and structures for the measurement. We developed selection criteria of measuring places for RVI CVAP in APR1400 and this will be directly applied to the measurement program for RVI CVAP.