• 제목/요약/키워드: Reactive power reserve

검색결과 25건 처리시간 0.027초

EMS data 분석 및 최적화 기법을 적용한 제어지역별 목표운전전압 제안 (Target Operation Voltage Guidelines Considering Voltage Level in Each Voltage Control area by Applying Optimization Technique Through EMS Data Observation)

  • 성웅;김재원;김태균;이병준;정응수;조종만
    • 전기학회논문지
    • /
    • 제58권4호
    • /
    • pp.671-678
    • /
    • 2009
  • This paper presents target operation voltage guidelines of each voltage control area considering both voltage stability and economical efficiency in real power system. EMS(Energy Management System) data, Real-time simulator, shows not only voltage level but lots of information about real power system. Also this paper performs optimal power flow calculation of three objective functions to propose the best target operation voltage. objective function of interchange power flow maximum and active power loss minimization stand for economical efficiency index and reactive power reserve maximum objective unction represents stability index. Then through simulation result using optimazation technique, the most effective objective function is chosen. To sum up, this paper divides voltage control area into twelve considering electric distance characteristics and estimate or voltage level by the passage of time of EMS peak data. And through optimization technique target operation voltage of each voltage control area is estimated and compare heir result. Then it is proposed that the best scenario to keep up voltage stability and maximize economical efficiency in real power system.

국내계통의 지역별 발전기 무효전력 예비력 산정을 위한 제어발전기 결정 (The Selection of Effective Control Generators for Calculating the Regional Reactive Power Reserve in Korean Power System)

  • 최근영;배문성;최윤혁;이병준;최홍석;강부일;조종만
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.282-283
    • /
    • 2011
  • 전압이 정격전압을 유지하지 못하면 전기기기의 효율 저하, 수명단축, 손실증대를 야기 시킨다. 하지만 더 큰 문제는 예기치 못한 사고 및 급격한 부하 증가에 따라 전압이 떨어질 때 생길 수 있는 전압붕괴 현상이다. 전압 붕괴 현상은 대규모로 퍼져 대정전 사태를 초래 할 수 있다. 전압안정도를 유지하고 향상시키기 위해 적절한 무효전력의 공급 및 무효전력 예비력 확보는 매우 중요하다. 무효전력 공급을 위한 설비에는 병렬 커패시터, 발전기 등이 있다. 하지만 병렬 커패시터 등 조상설비는 이미 설치되어 있는 양만큼만 출력을 낼 수 있고 사고 등의 급격한 계통변화에 빠르게 대응 할 수 없다. 즉, 사고나 급격한 부하 증가에 효율적으로 대응하기 위한 수단으로 발전기 순동 무효 예비력의 확보가 필수적이다. 하지만 무효전력은 지역적 특성을 띄고 있다. 그렇기 때문에 예비력의 확보와 더불어 지역적 특성을 반영해야만 하다. 본 논문에서는 발전기 무효전력 예비력 관점에서 무효전력의 지역적 특성을 고려 국내지역별 발전기 무효전력 예비력 산정을 위한 발전기 선정을 목표로 한다.

  • PDF

Modeling and Control of Integrated STATCOM-SMES System to Improve Power System Oscillations Damping

  • Molina, Marcelo G.;Mercado, Pedro E.
    • Journal of Electrical Engineering and Technology
    • /
    • 제3권4호
    • /
    • pp.528-537
    • /
    • 2008
  • Primary frequency control(PFC) has the ability to regulate short period random variations of frequency during normal operation conditions and also to respond rapidly to emergencies. However, during the past decade, numerous significant sized blackouts occurred worldwide that resulted in serious economic losses. Therefore, the conclusion has been reached that the ability of the current PFC to meet an emergency is poor, and security of power systems should be improved. An alternative to enhance the PFC and thus security is to store excessive amounts of energy during off-peak load periods in efficient energy storage systems for substituting the primary control reserve. In this sense, superconducting magnetic energy storage(SMES) in combination with a static synchronous compensator(STATCOM) is capable of supplying power systems with both active and reactive powers simultaneously and very rapidly, and thus is able to enhance the security dramatically. In this paper, a new concept of PFC based on incorporating a STATCOM-SMES is presented. A complete detailed model is proposed and a new control scheme is designed, comprising an enhanced frequency control scheme, and a fully decoupled current control strategy in d-q coordinates with a novel controller to prevent dc bus capacitors voltage drift/imbalance. The performance of the proposed control schemes is validated through digital simulation carried out using MATLAB/Simulink.

전력산업 구조개편에 대비한 적정 TRM 및 ATC 결정에 관한 연구 (A Study of TRM and ATC Determination for Electricity Market Restructuring)

  • 이효상;최진규;신동준;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권3호
    • /
    • pp.129-134
    • /
    • 2004
  • The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. The ATC determination s related with Total Transfer Capability (TTC) and two reliability margins-Transmission Reliability Capability (TRM) and Capacity Benefit Margin(CBM) The TRM is the component of ATC that accounts for uncertainties and safety margins. Also the TRM is the amount of transmission capability necessary to ensure that the interconnected network is secure under a reasonable range of uncertainties in system conditions. The CBM is the translation of generator capacity reserve margin determined by the Load Serving Entities. This paper describes a method for determining the TTC and TRM to calculate the ATC in the Bulk power system (HL II). TTC and TRM are calculated using Power Transfer Distribution Factor (PTDF). PTDF is implemented to find generation quantifies without violating system security and to identify the most limiting facilities in determining the network’s TTC. Reactive power is also considered to more accurate TTC calculation. TRM is calculated by alternative cases. CBM is calculated by LOLE. This paper compares ATC and TRM using suggested PTDF with using CPF. The method is illustrated using the IEEE 24 bus RTS (MRTS) in case study.

발전기별 가중치를 적용한 효용 무효전력 예비력 산출 (Calculation of Effective Q(Reactive Power) Reserve applying weight-factor of generators)

  • 김대정;서상수;이병준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.199_200
    • /
    • 2009
  • 전통적인 발전기 무효전력 예비력은 발전기가 출력할 수 있는 최대 무효전력 출력에서 현재 운전 중인 발전기의 무효전력 출력의 차이로 계산된다. 그러나 모든 발전기가 계통에 동일한 영향을 미치는 것은 아니기 때문에 이를 개선하기 위한 방안이 필요하다. 계통 제어에 민감한 발전기들을 선정하고 보다 효용성 있는 무효전력 예비력을 산출한다. 따라서 본 논문에서는 전력 조류 방정식을 Q와 V의 관계식으로 선형화하여 발전기의 감도를 도출한다. 도출된 감도는 부하의 무효전력 변화에 대한 발전기의 무효전력 출력의 변화를 나타내는 값으로 감도를 각 발전기별 가중치로 적용해서 효용 무효전력 예비력을 계산한다.

  • PDF