• Title/Summary/Keyword: Rapid-exit Taxiway

Search Result 4, Processing Time 0.018 seconds

The Study on the exit taxiway of an airpark used in LSA (경량항공기 이착륙장의 탈출유도로에 대한 연구)

  • Shin, Dai-Won;Shin, Hong-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.18 no.3
    • /
    • pp.70-76
    • /
    • 2010
  • In this study, we surveyed the operating status of the Light Sport Aircraft(LSA) in Korea, and reviewed the minimum requirements of the airpark for LSA. We are discuss about increased aerodrome traffic density and safety improvement, through the installation of the exit taxiway. The shape of the exit taxiway of an airpark used in LSA is a rectangle for usable two way direction of runway. The array types of exit taxiway influence paved and unpaved runway occupancy time of LSA.

Analysis of Runway Occupancy Time Using ADS-B Message about Landing Airplane (ADS-B를 이용한 착륙 항공기의 활주로 점유 시간 분석)

  • Ku, SungKwan;Baik, Hojong
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2016
  • Runway and taxiway is base facilities for aircraft take off and landing and runway capacity is one of major factor for airport capacity. Runway occupancy time is affect on the runway capacity. The identification of aircraft using taxiway by analysis of airport ground surveillance data and the measurement of pass time on the points is general method for the confirmation of the runway occupancy time. This study is runway occupancy time analysis of landing airplane using ADS-B message, in this study we surveyed landing aircraft runway occupancy time and analysis of serviced record using taxiway include rapid exit taxiway. The result of analysis is to confirm the different of landing direction and aircraft category on the same runway caused by structure of airport. Also the result of runway occupancy time analyzed data, it is base input data for the air transportation simulation.

Estimation of Incheon International Airport Capacity by using Aircraft Delay Simulation Model (시뮬레이션 모델을 활용한 인천국제공항 수용량 산정에 관한 연구)

  • Bang, Jun;Kim, DoHyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.1
    • /
    • pp.20-25
    • /
    • 2019
  • To prepare for the ever-increasing demand for air transport, airport operators should be well aware of the timing of the saturation of the facility and increase the capacity of the airport through extension or extension. The capacity of an airport is determined by the smallest value of the facilities that make up the airport, but it is generally customary to determine the capacity of the costly and time-consuming runway as a whole for the airport. For analyzing the capacity of the runway capacity, the study used the most accurate microscopic air traffic simulation, Simmod-PRO, to analyze the saturation time of three runways currently in Incheon International Airport's operation, and calculate the appropriate time for operation of the 4th runway. The study also calculate the relocation of Airport's high-speed exit taxiway for analyzing the increasing of capacity.

Estimated Analysis for Runway Occupancy Time Improvement (활주로 점유 시간 개선의 효과성 예측 분석)

  • GwangHoon Park;GumSeock Kang;SungKwan Ku
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.666-673
    • /
    • 2023
  • The runway occupancy time of landing aircraft is an important factor in determining runway capacity. The purpose of this study is to suggest improvement measures for runway occupancy time to improve the operation of existing airports. In order to derive improvement measures, a comparative analysis was conducted on the effectiveness of improvement using aircraft operation status data for specific days at the case airport. The FAA REDIM model was used to analyze the improvement plan, and the improvement application function of the model was used to confirm the effect of improving runway capacity by adding a rapid escape taxiway to an airport without a rapid escape taxiway. This study's approach can be applied to the derivation of runway improvement measures and preliminary prediction of effectiveness, and it presents cases that can be applied to future airport construction projects or airport improvement projects.