• Title/Summary/Keyword: Rainwater Management

Search Result 100, Processing Time 0.026 seconds

Low Impact Urban Development For Climate Change and Natural Disaster Prevention

  • Lee, Jung-Min;Jin, Kyu-Nam;Sim, Young-Jong;Kim, Hyo-Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.54-55
    • /
    • 2015
  • Increase of impervious areas due to expansion of housing area, commercial and business building of urban is resulting in property change of stormwater runoff. Also, rapid urbanization and heavy rain due to climate change lead to urban flood and debris flow damage. In 2010 and 2011, Seoul had experienced shocking flooding damages by heavy rain. All these have led to increased interest in applying LID and decentralized rainwater management as a means of urban hydrologic cycle restoration and Natural Disaster Prevention such as flooding and so on. Urban development is a cause of expansion of impervious area. It reduces infiltration of rain water and may increase runoff volume from storms. Low Impact Development (LID) methods is to mimic the predevelopment site hydrology by using site design techniques that store, infiltrate, evaporate, detain runoff, and reduction flooding. Use of these techniques helps to reduce off-site runoff and ensure adequate groundwater recharge. The contents of this paper include a hydrologic analysis on a site and an evaluation of flooding reduction effect of LID practice facilities planned on the site. The region of this Case study is LID Rainwater Management Demonstration District in A-new town and P-new town, Korea. LID Practice facilities were designed on the area of rainwater management demonstration district in new town. We performed analysis of reduction effect about flood discharge. SWMM5 has been developed as a model to analyze the hydrologic impacts of LID facilities. For this study, we used weather data for around 38 years from January 1973 to August 2014 collected from the new town City Observatory near the district. Using the weather data, we performed continuous simulation of urban runoff in order to analyze impacts on the Stream from the development of the district and the installation of LID facilities. This is a new approach to stormwater management system which is different from existing end-of-pipe type management system. We suggest that LID should be discussed as a efficient method of urban disasters and climate change control in future land use, sewer and stormwater management planning.

  • PDF

A study on the rainfall management target considering inter-event time definition (IETD) (무강우 지속시간(IETD)을 고려한 빗물관리 목표량 설정 방안 연구)

  • Baek, Jongseok;Kim, Jaemoon;Park, Jaerock;Lim, Kyoungmo;Shin, Hyunsuk
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.8
    • /
    • pp.603-611
    • /
    • 2022
  • In urban areas, the impermeable area continues to increase due to urbanization, which interferes with the surface penetrating and infiltrating of rainwater, causing most rainwater runoff to the surface, deepening the distortion of water circulation. Distortion of water circulation affects not only flood disasters caused by rainfall and runoff, but also various aspects such as dry stream phenomenon, deterioration of water quality, and destruction of ecosystem balance, and the Ministry of Environment strongly recommends the use of Low Impact development (LID) techniques. In order to apply the LID technique, it is necessary to set a rainwater management target to handle the increase in outflow after the development of the target site, and the current standard sets the rainwater management target using the 10-year daily rainfall. In this study, the difference from the current standards was analyzed through statistical analysis and classification of independent rainfall ideas using inter-event time definition (IETD) in setting the target amount of rainwater management to improve water circulation. Using 30-year rainfall data from 1991 to 2020, methods such as autocorrelation coefficient (AC) analysis, variation coefficient (VC) analysis, and annual average number of rainfall event (NRE) analysis were applied, and IETD was selected according to the target rainfall period. The more samples the population had, the more IETD tended to increase. In addition, by analyzing the duration and time distribution of independent rainfall according to the IETD, a plan was proposed to calculate the standard design rainfall according to the rainwater management target amount. Therefore, it is expected that it will be possible to set an improved rainwater management target amount if sufficient samples of independent rainfall ideas are used through the selection of IETD as in this study.

A Study on the Optimum Size of Rainwater Utilization in Detached Residential Complex (단독주택단지의 빗물이용시설 적정 규모 설정 연구)

  • Baek, Jongseok;Kim, Hyungsan;Shin, Hyunsuk;Kim, Jaemoon;Park, Kyungjae
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.6
    • /
    • pp.669-677
    • /
    • 2018
  • Torrential rain and drought are repeated due to the increase in the unpredictable fluctuating of rainfall patterns. It is time for stabilize water resource management in terms of disaster prevention. Distributed control from sources is needed to minimize damages caused by torrential rains and droughts. Rain barrel can be used to reduce the runoff as they collect and store rainwater. In response to this situation, Seoul Metropolitan Government and other local governments implemented a project to support the installation of rain barrel and provided 90% of the cost of installing it in private areas. However, with limited budget, it is difficult to distribute rainwater to the city which is mostly covered by private areas. In this study, Samho-dong, Ulsan, where pilot projects of water cycle leading city are underway, analyzed the effects of reducing the runoff with respect to the amount of rainwater that can be used, and analyzed the economics of recoverable investment cost when installed. From the analysis, it was established that it is possible to show sufficient efficiency with a small capacity without the need to install large rain barrel effectively in the private sector, and to support the installation cost of less than 70 percent of the rainwater can be recovered.

Wet Deposition of Heavy metals in Suwon Area (수원지역 빗물의 중금속 함량 평가)

  • Jung, Goo-Bok;Lee, Jong-Sik;Kim, Won-Il;Kim, Jin-Ho;Yun, Sun-Gang
    • Korean Journal of Environmental Agriculture
    • /
    • v.26 no.2
    • /
    • pp.116-123
    • /
    • 2007
  • This experiment was conducted to investigate the distribution and burden characteristics of heavy metals in the rainwater sampled at Suwon area, in the middle part of Korea, from April 2002 to October 2003. The relationship between concentration of heavy metal and other chemical properties in the rainwater was also evaluated. Chemical properties in the rainwater were various differences with raining periods and years. It appeared that a weighted average pH of rainwater was ranged from 4.7 to 5.5. Heavy metal concentrations in the rainwater were ranked as Zn>Pb>Cu>Ni>Cr>As>Cd. As compared with heavy metal concentrations of rainwater in 2002, Cd, Cu and As were higher than other element in 2003. There were positive correlation between major ionic components, such as Ca, Mg, and K, and heavy metal concentrations of rainwater, and As, CU, Cu, Zn and Ni were relatively higher relationship than Pb and Cr in respective to correlation coefficient. For heavy metal distribution of rainwater, the order of average enrichment factors was Cd>Pb>AS>Cu>Zn>Ni>Cr, and these were relatively higher than the natural component such as Fe, Mg and Ca. The monthly enrichment factors were relatively high in the spring (from April to May) at Suwon. The monthly amount of heavy metal precipitation was high in the rainy season from June to August because of great influence of rainfall.

A Study on Location Selection for Rainwater Circulation System Elements at a City Level - Focusing on the Application of the Environmental and Ecological Plan of a Development - (도시차원의 빗물순환체계 요소별 입지선정에 관한 연구 - 개발예정지역의 환경생태계획 적용방안을 중심으로 -)

  • Kim, Hyo-Min;Kim, Kwi-Gon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • This study focused on establishing a natural rainwater circulation system using rainwater meant for relatively large urban development projects such as a new town development. In particular, when the location selection techniques for individual elements of a natural rainwater circulation system are developed for the integrated rainwater management, changes in hydrological environment will be minimized and the natural water circulation would be restored to realize the low impact development (LID). In that case, not only the excess will be reduced but water space and green areas in a city would also increase to improve the urban sustainability. First of all, there were five elements selected for the location selection of a rainwater circulation system intended for the integrated rainwater management: rainwater collection, infiltration, filtration, retention and movement spaces. After generating these items, the location selection items and criteria were defined for each of the five elements. For a technique to apply the generated evaluation items and criteria, a grid cell analysis was conducted based m the suitability index theory, and thematic maps were overlapped through suitability assessment of each element and graded based on the suitability index. The priority areas were identified for each element. The developed technique was applied to a site where Gim-cheon Innovation City development is planned to review its feasibility and limitations. The combined score of the overlapped map for each element was separated into five levels: very low, low, moderate, high and very high. Finally, it was concluded that creating a rainwater circulation system conceptual map m the current land use plan based on the outcome of the application would be useful in building a water circulation system at the de1ailed space planning stage after environmental and ecological planning. Furthermore, we use the results of this study as a means for environment-friendly urban planning for sustainable urban development.

A Study on The Power Line Communication Module for a Rainwater Management System (빗물관리 시스템을 위한 전력선 통신 모듈에 관한 연구)

  • Jung, Yong-Chae;Jung, Ho-Seok;Kim, Jeong-Uk
    • Proceedings of the KIPE Conference
    • /
    • 2007.07a
    • /
    • pp.500-502
    • /
    • 2007
  • In case Power Line Communication (PLC) method is applied to a rainwater monitoring system, PLC module should be utilized. In this paper, PLC module using ST7538Q is implemented. The design rules of the IC peripheral circuit are explained in detail. The operation of the implemented PLC module is verified through the experimental results.

  • PDF

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

An experimental study on characteristics of hydraulic stability for stable management prepare continuous flood in Shinwol rainwater storage and drainage system (신월 빗물저류배수시설의 연속강우 대비 안정적 운영을 위한 수리적 안정 특성에 대한 실험 연구)

  • Oh, Jun Oh;Kim, Young Do;Jun, Sang Mi
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.6
    • /
    • pp.451-461
    • /
    • 2020
  • Urban flooding due to rapid urbanization has recently become frequent. In this study, a hydraulic model experiment was conducted on Shinwol rainwater storage and drainage system constructed for the first time in South Korea to prevent urban flooding. Experiments were preformed for 55 scenarios, of which 19 overflows occurred. In addition, the video analysis for the scenarios where the overflow occurred showd that the overflow occurred during the process of exhausting the pressurized air in the facility and the undular bore were moving. Results of this study, it was judge that it would be advantageous to maintain a completely drained or full-pipe condition for stable operation of the Shinwol rainwater storage and drainage system for continuous rainfall in the future. And it is necessary to additional research on the correlation for the magnitude of inflow discharge, overflow and undular bore.

Analysis of Water Cycle Effect by Plan of LID-decentralized Rainwater Management Using SWMM-LID Model in a Low-carbon Green Village (SWMM-LID를 이용한 저탄소 녹색마을의 LID-분산형 빗물관리 계획에 따른 물순환 효과 분석)

  • Lee, Jung-Min;Hyun, Kyoung-Hak;Lee, Yun-Sang;Kim, Jung-Gon;Park, Yong-Boo;Choi, Jong-Soo
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.503-507
    • /
    • 2011
  • There was a plan to develop a low-carbon green village(approximately $400,000m^2$) in A city, a new town. Restoration of water cycle is essential for creation of the low-carbon green village. Therefore, installation plan of LID-decentralized rainwater management facilities for natural water cycle was established for creation of the low-carbon green village. Analyses on effect of the water cycle were performed in conditions of before, after developing the low-carbon green village and after installing the LID facilities(rain garden, constructed wetland, rainwater harvesting facility, etc.) using SWMM-LID model developed by EPA. Due to the characteristic of permeable area before development and significant green spaces after development, installation plan of LID facilities to restore the water cycle did not show an obvious effect. However, potential of the hydrological cycle could be seen by the installation of the LID facilities.

Evaluation of Tank Capacity of Rainwater Harvesting System to Secure Economic Feasibility and Sensitivity Analysis (경제성 확보를 위한 빗물이용시설의 규모 산정 및 민감도 분석)

  • Mun, Jung-Soo;Kim, Ha-Na;Park, Jong-Bin;Lee, Jung-Hun;Kim, Ree-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.191-199
    • /
    • 2012
  • Rainwater harvesting systems (RWHS), one of measures for on site rainwater management, have been promoted by laws, regulations and guidelines and have been increased. However, more evaluation of economic feasibility on RWHS is still needed due to seasonal imbalance of rainfall and little experiences and analysis on design and operation of RWHS. In this study, we investigated tank capacity of RWHS to secure economic validity considering catchment area and water demand, which is affected by building scale. Moreover, sensitivity analysis was performed to examine the effect of design factors, cost items and increase rate of water service charge on economic feasibility. The BCR (benefit cost ratio) is proportional to the increase in tank capacity. It is increased steeply in small tank capacity due to the effect of cost and, since then, gently in middle and large tank capacity. In case of 0.05 in the rate of tank volume to catchment area and 0.005 in water demand to catchment area, BCR was over one from the tank capacity of 160 $m^{3}$ taking into account of private benefits and from the tank capacity of 100 $m^{3}$ taking into account of private and public benefits. Sensitivity analysis shows that increase of water demand can improve BCR values with little cost so that it is needed to extend application of rainwater use and select a proper range of design factor. Decrease of construction and maintenance cost reduced the tank volume to secure economic validity. Finally, increase rate of water service charge had considerable impact on economic feasibility.