AGT system is a kind of light railway train. AGT system use of concrete track and rubber tire, so it can be reduce the noise and vibration, compare to the normal train system. And, the dynamic responses of normal bridge are influenced by the dynamic characteristics of bridge, the speed of vehicle and the surface roughness of railway. But the AGT system bridge is influenced not only the above facts but also the guiderail unevenness, because, AGT vehicle steered by guiderail. So, in this study, optimized service condition is suggested for the design and operation of AGT system, by the means of experimental study. The experiments are executed for PSC bridge with length of 30m, at the AGT test line in Kyongsan. The test results are compared and investigated according to the prominence. In the test result, the guiderail prominence influenced on the dynamic response of bridge. It shows a increase as compared with no guiderail prominence in the dynamic response value acceleration, displacement, stain.
In recent years, many countries have added railway noise to the issues covered by noise regulations. It is known that the rail is the dominant source of rolling noise at frequency range of 500Hz-2000Hz for the conventional speeds (<160km/h). One of the effective ways to reduce noise from railway track is using a rail vibration absorber. To study the acoustic performance of rail absorber, the decay rates of vibration have long been used by researcher. In this paper, A FE model of a periodic supported rail with infinite element in ABAQUS is developed to study the acoustic performance of the rail absorber. To compute the decay rates, acceleration responses along the rail transferred to MATLAB to obtain response levels in frequency domain and then by processing the response levels, the decay rates obtained for each1/3octav band. Continous rail absorber is represented by a steel layer and an elastomer layer. The decay rates for conventional rail and rail with one-side absorber and also, the rail with two side absorber are obtained and compared. Then, to improve the system of rail absorber, a steel plate with elastomer layer is added to bottom of the rail foot. The vertical decay rate results show that the decay rate of rail vibration along the track is significantly increased around the tuned frequency of the absorber and thus the rail vibration energy is substantially reduced in the corresponding frequency region and also effective in rail noise reduction.
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.5
/
pp.461-468
/
2017
The introduction of BIM in domestic construction industry has become more active. Library development and standardization in civil-engineering are unexhausted. This research develop and standardize prototype library for railway infrastructure. We define target facility for library based on railway standard drawings and select BIM software according characteristic of each facility. In this research, we develop libraries composed of 199 files and 489 types for alignment, roadbed and track and make specifications as defined attribution item and description. As we consider for application to diverse use case, develop prototype library in low LoD. We expect that library can increase 3D design productivity and ensure consistency of quality.
Kim, Hae-Gon;Bae, Hyun-Ung;Lee, Chin-Ok;Lim, Nam-Hyoung
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.9
/
pp.4532-4541
/
2013
With speed up of railway, the demand for safety of the railroad transportation is on the increase in Korea's conventional railways. In additions, freight trains with heavier axle load are required to run conventional railways. In order to solve these requirements, the increase of rail weight and the application of long rail system have been underway in conventional railways. However, the research on ties that is absolutely influencing the track stiffness in ballasted tracks has not been much progress. In this paper, the new H-typed tie is developed to increase the track stiffness and reduce the track irregularity. And from the structural analysis by FE program, the intial design drawing of the new H-typed tie is proposed.
Lee Il-Wha;Hwang Seon-Keun;Park Tae-Soon;Lee Bo-Hyoung;Ko Hak-Song
Proceedings of the KSR Conference
/
2004.06a
/
pp.974-979
/
2004
Recently, the development of paved track is required as a Low-maintenance of conventional line. The most important factor of paved track is stability and applicability. In this method, the ballast is grouted with mortar so that the ballast can turn into a structure like slab. This method can be subdivided into the followings. One is the method with switching the ballast, and the other is without switching the ballast. The ordinary and actual states of the ballast and roadbed were investigated to evaluate the applicability of the paved track structure in this study, and various In-situ tests were applied. Non-destructive tests such as GPR, SASW, FWD were used, and bearing capacity of roadbed, depth of the ballast, and deterioration, penetration, and contamination of the ballast were focused. The result of this investigation was utilized in the selection of optimal paved track structure and data for preliminary design.
Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a PRCG(pressurized rapid-hardening cement grouting) method as a settlement restoration method that can be suitably adopted to the concrete slab track.
Track support stiffness which affected track maintenance and riding comfort had a big effect on the track and train. Also, track support stiffness of the track design which was based on theory differs from track support stiffness of the track generated on the field. Track support stiffness was generated by several factors such as dynamic wheel loads, vertical displacement of track, and stress at rail bottom on the field test. With the results of the field test was compared with theoretical value. This paper analyzed that track support stiffness of ballast depended on condition of ballast, and support stiffness of concrete track also depended on the characteristic of track structures such as, normal elastic fastening system, rail floating system and sleeper floating system. However, on the ballast and concrete track, the designed track support stiffness was underestimated less than the measured track support stiffness. When the track condition was estimated on service line, it would not consider the track condition on the field. Therefore, this study proposed the various track type and the range of track support stiffness based on the experimental test.
It is of great importance to assure the running safety and ride comfort in designing the floating slab track for the mitigation of train-induced vibration. In this paper, for this, analyzed are the system requirements for the running safety and ride comfort, and then, the behavior of train and track at the transition zone between the floating slab track and the conventional concrete slab track according to several main design variables such as spring constant, damping coefficient, spacing and arrangement of isolators and slab length, using the dynamic analysis technique considering the train-track interaction. The results of numerical analysis demonstrate that the discontinuity of the support stiffness at the transition results in a drastic increase of the vertical vibration acceleration of the train body, wheel-rail interaction force, rail bending stress and uplift force. The increase becomes higher with the decrease of the spring constant of isolators and the increase of the isolator spacing, but the damping ratio does not significantly affect the behavior of train and track at the transition. Therefore, to assure the running safety and ride comfort, simultaneously increasing the effectiveness of vibration isolation, it is effective to minimize the relative vertical offset between the floating slab and the conventional track slab by adjusting the spring constant and spacing of isolators at the transition.
The purpose of this study is to investigate the influence of train-induced end rotation of simple supported track girder on the performance of a direct fixation track system (DFTS) in Yeongjong grand bridge. In this study, the influences of deflection of a DFTS and track girder on dynamic rail-track girder interaction forces for the track girder ends currently employed in airport express lines were assessed by performing field tests using actual vehicles running along the service lines. Therefore, the dynamic displacement of rail and track girder and the fastener stress on the center and ends sections of DFTS were measured for two different trains (AREX and KTX) running in Yeongjong grand bridge. A three-dimensional finite element analysis (FEA) model using the time-history function based on the design wheel load was used to predict the train-induced track and track girder displacement, and the FEA and field test results were compared. The analytical results reproduced the experimental results well within about 3-7% difference in the values. Therefore, the FEA model of DFTS on track girder is considered to provide sufficiently reliable FEA results in the investigation of the behavior of DFTS. Using the analytical and experimental results, the influence of train-induced end rotation of simple supported track girder on the interaction behavior of rail and track girder installed on a simple supported track girder ends, i.e., upward displacement of rail-track girder and the fastener stress, was investigated. It was found that the train-induced end rotation effect of track girder was not significantly affected by the upward displacement of rails and the fastener stresses of track girder ends. Further, the interaction behavior of rail and track girder were similar to or less than that of the general railway bridge deck ends, nevertheless the vertical displacement of track was higher than that of conventional DFTS on the general railway bridge. From the results, the dynamic responses of the DFTS on track girder ends were not significantly affected by the safety and stability of DFTS ends.
TTX(Tilting Train Express), which has improved traveling performance on curved track, is being designed in cope with future railway circumstance. Nowadays, in the world, many efforts are focussed on railway safety. Especially, a variety of researches on train crashworthiness have been conducted. As a part of these efforts, some equipments on TTX are designed to reduce fatalities and casualties in crash accidents. This paper introduces impact energy absorbtion characteristics on the initial design of the front end structure. Some comments are made briefly for improvement of initial structural design and future following researches.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.