• Title/Summary/Keyword: Railway track design

Search Result 366, Processing Time 0.026 seconds

Design and Construction of Floating Slab Track (저진동 궤도슬래브의 설계와 시공)

  • Lee, Eun-Ho;Kim, Yong-Jae;Park, Myoung-Gyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.214-219
    • /
    • 2008
  • Recently, railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. In the case of domestic situation, both rapid transit railway and existing railway have been operated in higher speed and the construction of railway near the city building has been increased as well. Because of the rapid transit system and heavy railway, the noise and vibration of railway has been increased so that the strong standards in terms of environmental matter should be required. Therefore, the solution to avoid environmental matters becomes one of the most important factor in constructing railway. In this study, floating slab system which is one of the solution to avoid noise and vibration in railway has been introduced, and the foreign technology and the trend of this business has been investigated. In addition, the method of conceptual design and construction of floating slab system according to the isolator has been introduced.

  • PDF

The Dynamic Interactive Analysis of track and train system with Roadbed Displacement in Subgrade Concrete Slabtrack

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Youn-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.379-386
    • /
    • 2007
  • Recently the concrete slab tracks are being constructed on roadbed in the Kyong-bu 2nd stage high speed railways. In responding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides the design standards and the maintenance system. The proposed standards and the maintenance system are based on the track theory and the track-train interaction program developed, where the roadbed displacement and train speed are utilized as mediating variables. In the analysis, the dynamic response of track-train interaction apply to various speeds and displacements. the roadbed displacement is shown in a sine curve, the scope of the displacement occurrence, presented in its wavelenths, include 6meters, 10meters, 15meters, 20meters, 30meters. the train speeds involved are 50,100, 150,200,250,300,350,400 kilometers per hour.

  • PDF

Study on the Optimization of Slack Design in Sharp Curved Track (급곡선부에서 슬랙량 최적화를 위한 연구)

  • Kim Soon-Cheol;Kim Young-Gu;Jeon Byung-Chan;Han Jong-Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.823-829
    • /
    • 2005
  • The extent of slack is correlative with the wheelbase of vehicle as well as the distance between the inner faces of flanges. Since the movable clearance of wheel flange is getting reduced in curved track, the vehicle is more difficult to negotiate the track. By this reason, a certain extent of slack is normally designed for curved track to allow the movable clearance corresponding to that of straight track. In case of some foreign railways,. the fixed extent of slack has been classified by the ranges of curve radius. In case of KNR, the slack is calculated by a formula for each case of curve radius and it therefore seems quite precise method. However, since there is a wide range of slack adjustment $(S'=0\~15mm)$ in calculation formula itself, too excessive or too little slack can be calculated. This study is to approach the technical review on slack calculation and to offer the reasonable slack design through the full-scale experiment at sharp curved track without slack.

  • PDF

Algorithm-based Railway Tunnel BIM Design Considering Railway Alignment (철도 선형을 고려한 알고리즘 기반의 철도 터널 BIM 설계 방안)

  • Choi, Hyung-Lae;Jang, Kyung-Soo;Kim, Hyouk;Lee, Myeng-Ho;Park, Min-Sang
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2019
  • In process of creating BIM model for tunnel, many user use still CAD, so the workflow for BIM design is not perfect. Therefore, in this paper, we proposes a method to automatically create BIM model without converting 2D drawings in tunnel design. It can allow engineers to design BIM-based tunnel with maximum use of linear information and modify the BIM model whenever there is changed linear information. To do this, we use Dynamo, which can reduce the time required for creating and modifying BIM models during design changes, saving time wasted for BIM conversion design.

Design Graphs for Asphalt Concrete Track with Wide Sleepers Using Performance Parameters (성능요소를 반영한 광폭 침목형 아스팔트콘크리트 궤도 설계그래프)

  • Lee, SeongHyeok;Lim, Yujin;Song, Geunwoo;Cho, Hojin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.331-340
    • /
    • 2016
  • Wheel load, design velocity, traffic amount (MGT), stiffness and thickness of sub-layers of asphalt concrete track are selected as performance design parameters in this study. A pseudo-static wheel load computed considering the dynamic amplification factor (DAF) based on the design velocity of the KTX was applied to the top of asphalt concrete track for full three dimensional structural analysis using the ABAQUS program. Tensile strains at the bottom of the asphalt concrete layer and vertical strains at the top of the subgrade were computed from the structural FEA with different combinations of performance parameter values for one asphalt concrete track section. Utilizing the computed structural analysis results such as the tensile strains and the vertical strains, it was possible to develop design graphs to investigate proper track sections for different combination of the performance parameters including wheel load, design velocity, traffic amount(MGT), stiffness and thickness of asphalt concrete layers for any given design life. By analyzing the proposed design graphs for asphalt concrete track, it was possible to propose simple design tables that can be used by engineers for the effective and fast design of track.

Calculation method and application of natural frequency of integrated model considering track-beam-bearing-pier-pile cap-soil

  • Yulin Feng;Yaoyao Meng;Wenjie Guo;Lizhong Jiang;Wangbao Zhou
    • Steel and Composite Structures
    • /
    • v.49 no.1
    • /
    • pp.81-89
    • /
    • 2023
  • A simplified calculation method of natural vibration characteristics of high-speed railway multi-span bridge-longitudinal ballastless track system is proposed. The rail, track slab, base slab, main beam, bearing, pier, cap and pile foundation are taken into account, and the multi-span longitudinal ballastless track-beam-bearing-pier-cap-pile foundation integrated model (MBTIM) is established. The energy equation of each component of the MBTIM based on Timoshenko beam theory is constructed. Using the improved Fourier series, and the Rayleigh-Ritz method and Hamilton principle are combined to obtain the extremum of the total energy function. The simplified calculation formula of the natural vibration frequency of the MBTIM under the influence of vertical and longitudinal vibration is derived and verified by numerical methods. The influence law of the natural vibration frequency of the MBTIM is analyzed considering and not considering the participation of each component of the MBTIM, the damage of the track interlayer component and the stiffness change of each layer component. The results show that the error between the calculation results of the formula and the numerical method in this paper is less than 3%, which verifies the correctness of the method in this paper. The high-order frequency of the MBTIM is significantly affected considering the track, bridge pier, pile soil and pile cap, while considering the influence of pile cap on the low-order and high-order frequency of the MBTIM is large. The influence of component damage such as void beneath slab, mortar debonding and fastener failure on each order frequency of the MBTIM is basically the same, and the influence of component damage less than 10m on the first fourteen order frequency of the MBTIM is small. The bending stiffness of track slab and rail has no obvious influence on the natural frequency of the MBTIM, and the bending stiffness of main beam has influence on the natural frequency of the MBTIM. The bending stiffness of pier and base slab only has obvious influence on the high-order frequency of the MBTIM. The natural vibration characteristics of the MBTIM play an important guiding role in the safety analysis of high-speed train running, the damage detection of track-bridge structure and the seismic design of railway bridge.

Integrated Superstructure Design of Elastic Components to Improve the Track Performance (궤도의 성능향상을 위한 탄성구성요소로 통합된 상부구조 설계)

  • Kang, Bo Soon
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.578-585
    • /
    • 2015
  • Track elastic components can be technically and economically efficient when integrated well into track superstructure of a railway network. In such cases, the elastic rail pad is larger than a 800m radius curve provides smooth rail branching and allows for high-speed operation ($V{\geq}160km/h$). High track resistance causes the tamping intervals to stand out because the constantly increasing share of the sleeper pad further extends the increase of the tamping interval and the long grinding period; the engineering and construction of the small curve radius track provides some measures for reducing the solid sounds. Installation of elastic mats under the ballast can have a good effect, particularly in the context of protection against dust during construction or extensive renovation measures when laying new lines. However, such a process requires special attention and proper installation.

Experimental Study of Characteristics of Longitudinal Resistance Behavior of Fasteners in Concrete Track on Bridges (교량 상 콘크리트궤도 체결장치의 종저항 거동특성에 대한 실험적 연구)

  • Yun, Kyung-Min;Park, Beom-Ho;Min, Kyung-Hwan;Lim, Nam-Hyoung
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.638-646
    • /
    • 2016
  • CWR (continuous welded rail) tracks on high-speed railway bridges have much more complicated axial force distributions caused by track-bridge interaction than those behaviors on embankments, and additional problems caused by track-structure interaction with the axial force of the CWR. In order to analyze and limit other physical phenomena caused by track-bridge interaction, a design guideline (KR C-08080, longitudinal track-bridge interaction analysis) is used when designing CWR track on bridges. Domestic analysis and design methods for track-bridge interaction follow the UIC 774-3R, and they suggest conservative methods and deterministic properties. Recently, many studies analyzing the methods of track-bridge interaction considering the loading history are being carried out; however, there has been insufficient studies of the variation of the resistance properties with a consideration of the actual loading history. In this study, the performances of rail fastening systems used for concrete track on bridges were tested and analyzed while considering the loading history. For this purpose, longitudinal and vertical loading combinations, applied in order to simulate the practical conditions and resistance characteristics (stiffness and elastic limit displacement), are analyzed through the experimental results. Also, a comparison study was conducted with the properties in the KR Code.

3D FEA for the Cement Mortar Pouring type Paved Track (시멘트 모르터 충진형 포장궤도의 3차원 유한요소해석)

  • Lee Il-Wha;Lee Jin-Wook;Lee Su-Hyung;Lee Hyun-Suk
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.836-841
    • /
    • 2004
  • Recently, the development of the paved track is required as a Low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The most important factor of paved track is stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the pre packed concrete technique. The most important to design is characteristics of the structure. CMP slab's thickness is less than the conventional slab track and pouring layer is attached tie and roadbed directly. On this paper, to verify the basic structure of the CMP track, characteristics of the structure is investigated pouring layer, tie and interaction of the each layer using the 3D finite elment analysis.

  • PDF