• 제목/요약/키워드: Railway line

검색결과 1,611건 처리시간 0.03초

현행 철도건설규칙을 고려한 기존선 구간에서의 탈선안전도 해석 (An Analysis of Derailment Safety in Conventional Line considering Current Railway Construction Regulations)

  • 김용원;엄범규;강부병;이희성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1914-1921
    • /
    • 2011
  • When a railway vehicle passes through curves & transitions, the running speed must be improved by proposing the standards on the maximum running possibility speed of each section on conventional line (Dongdaegoo-Namsunghyun) considering derailment safety. In this paper, To improve the maximum running possibility speed of railway vehicle which passes through curves which have high risk of derailment, the track alignment conditions of conventional line (Dongdaegoo-Namsunghyun) that present transition curve length in current railway construction regulations are controlled. We presented elevation way about the section maximum running possibility speed in conventional line by analysis result.

  • PDF

대도시권 버스개편추세에 따른 통근전철의 대응 전략 (An improvement strategy of metropolitan commuter railways according to the reformation of bus system on a metropolitan area)

  • 한우진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1601-1606
    • /
    • 2004
  • Nowadays, the bus system of a metropolitan area is improving very fast. According to the bus, commuter railways increase their competitive power. For this, trains get the mobility increasing, effective transferring system and unified information service. For the mobility increasing, commuting railway must be faster by flexible train diagram and facilities improvement. And finally, optimal commuter train, 'Liner' is needful. And for effective transferring system, it is necessary that railway station and transferring center of a city be merged. And it is needful that direct management bus by railway company and unification fare system on metropolitan region. Next, for information service system improving, the commuting railway station must be regional transportation hub at first. And it is needful that unified line map of trunk line transportation systems and regionally collective transportation system information book. Therefore, metropolitan commuting railways compete with trunk line bus and cooperate with feeder line bus, and can make optimal metropolitan public transportation systems.

  • PDF

철도고가교 급곡선부 레일장대화 방안연구 (A study of CWR on railway viaduct with sharp curves)

  • 이상진;김기훈;신순호;이주헌
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.415-422
    • /
    • 2000
  • The Seoul Subway Line 4 crossing downtown diagonally constructed in February 1980 and opened on October 11, 1983. The line 4 is thus able to link southern and northern parts of Seoul with the downtown as well as with the Seoul outskirts. More than 810,000 people use it everyday. Line 4 was constructed like Line 1,2,3 with ballast track system causing much maintenance cost gradually and espicially much public discontent due to wheel and rail contact noise by railway viaduct with sharp curves. CWR on railway viaduct with sharp curves, 180m$\leq$R$\leq$300m, hasn't been designed and constructed ever in domestic. Therefore in order to reduce noise and vibration caused by interaction between wheel and rail the possibility and the methods of CWR(Continuous Welded Rail) on railway viaduct with sharp curve less than R300 will lead it to the maintenance free system.

  • PDF

철도망 설계모형을 이용한 설계속도 수준별 고속철도망 투자우선순위 선정 (High-speed Rail Infrastructure Priority Decision Making on Level of Design Speed by Rail Network Design Problem)

  • 박진경;임용택;이준;엄진기;문대섭
    • 한국철도학회논문집
    • /
    • 제12권3호
    • /
    • pp.427-436
    • /
    • 2009
  • 본 연구는 철로를 신설 또는 확장 시 목표로 설정한 지표를 최적화시키는 최적 노선구간을 선정하여 철도망의 네트워크 효과를 고려하는 방법론인 철도망 설계모형(Railway Network Design Problem, RNDP)을 이용하여 설계속도 수준별 고속철도망의 노선축별 분석구간별 투자우선순위를 선정하였다. RNDP의 목적함수를 총 통행시간 최소화로 설정하여 분석한 결과 투자우선순위가 가장 높은 고속철도망 노선축은 서동축이며, 다음으로 서해축, 남해축 순으로 나타났다. 또한 노선축별 최적안은 서동축의 경우 전 구간을 400km/h급으로 신선을 건설하는 대안이, 서해축의 경우 전라선 익산$\sim$여수 구간을 200km/hr급으로 고속화하는 사업을 활용하고 이 구간을 제외한 나머지 신선 구간(송도$\sim$익산)을 400km/h급으로 건설하는 대안인 것으로 분석되었다. 마지막으로 남해축의 경우에는 경전선, 즉 순천$\sim$마산 구간을 200km/hr로 고속화하는 사업을 활용하여 나머지 신선 구간(목포$\sim$순천, 마산$\sim$부산)을 350km/h로 건설하는 대안인 것으로 분석되었다.

만철의 길회선 부설과 북선철도 위탁과정에 관한 연구 (A Study on the Gilhoe Line Construction and the Consignment of the North Korean Railroad by the South Manchuria Railways)

  • 이용상;정병현;배은선
    • 한국철도학회논문집
    • /
    • 제18권5호
    • /
    • pp.489-501
    • /
    • 2015
  • 본 연구에서는 남만주철도주식회사가 추진하였던 길회선 부설과 조선철도12년계획에 의해 부설된 북선철도가 만철에 위탁되는 과정에 대하여 분석하였다. 일본의 대륙정책 추진과정에서 중요한 두 가지 사건인 길회선과"조선철도12년계획"을 연계하여 당시의 관련된 정책을 설명해 보고자 하였으며, 이러한 연구를 통해 일본의 만철에 대한 정책과 조선철도의 성격을 좀 더 분명히 할 수 있을 것이다. 또한 기존 연구자들이 주장하고 있는 일본국유철도, 만철, 조선철도의 연결성을 본 사례를 통해 검증하고자 하며, 선만일체론에 대해서도 검증하고자 한다. 본 연구는 기존연구와 달리 일본국내의 정책결정과정을 통해 조선철도정책의 실상을 검증해 보고자 하였다. 아울러 본 논문에서는 추가적으로 새롭게 발굴된 자료와 내지인 일본과 조선 만주의 철도제도를 비교해 보면서 이의 연관성을 함께 설명해 보고자 하였다. 본 연구를 통해 길회선 부설과 북선철도 만철 위탁의 연계성을 확인할 수 있었다. 길회선과 북선철도에 대한 만철의 일체적 경영에서 군사적, 경제적, 동아시아의 주도권 등을 잡으려는 일본의 정책 흐름도 발견할 수 있었다.

Research on Transition of Road Bed of Wuhan-Guangzhou Passenger Line and Bridge

  • Kang, Bo-Soon;Jun, Yang
    • International Journal of Railway
    • /
    • 제2권4호
    • /
    • pp.180-186
    • /
    • 2009
  • High speed railway challenge the design, construction and maintaining of traditional railway, many traditional design concepts have been changed. Transition of railway and bridge has two main problems. one is that different lines have different ability of resisting distortion in area of trial load, which was known that problem of smooth transition of stiffness, the other is that differential settlement between artificial structure and earth structure cause bending of railway. The two problems have effect on train moving. The principle of processing transition of railway and bridge is same in world, but it is difficult to find relationship between design standard of transition, vehicle performance, line standard, design speed and so on form documentation and data reports. Based on mechanics, the paper analyzed dynamic performance of transition of high speed railway, studied various rough elements which is effective to train moving, built mathematical model of interaction of train and transition of high speed railway and developed numerical simulation software. In various different work conditions, we did great quantity of numerical simulation, comprehensive analysis and performance analysis.

  • PDF

직류가선전압 모의장치를 적용한 지하철용 회생인버터 시스템 (Regenerative Inverter System for Railway with DC Line Voltage Simulator)

  • 지용혁;조기현;장수진;원충연;김용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1515-1521
    • /
    • 2007
  • In this paper, a unified regenerative inverter system for railway with DC line voltage simulator is proposed. In order to determine the operation characteristics of the regenerative inverter, the DC line voltage simulator is proposed. The DC line voltage simulator, which is based on the AC-DC PWM converter, varies the DC voltage according to the fluctuating voltage which is measured in the actual DC line. The suitable operating point of the regenerative inverter can be estimated from the simulation result. The regenerative inverter operates two modes. When the DC line voltage exceed the operating point, already set up, it works as regenerative inverter to return the excessive power of DC line to the grid. When the DC line voltage is under the operating point, it works as active power filter to compensate harmonic currents. In this paper, the control algorithm of the DC line voltage simulator and that of the regenerative inverter is proposed.

  • PDF

직류 전차선로용 공극형 피뢰기의 특성 분석 (Characteristic Analysis of Gapped Surge Arresters for D.C. Railway Line)

  • 조한구;한세원;윤한수;천종욱
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 하계학술대회 논문집
    • /
    • pp.485-488
    • /
    • 2001
  • This paper provides the result of analysis of the structure and I-V characteristics of D.C. 1500 V surge arresters which were installed in railway line currently. As Porcelain housed surge arresters have unstable elements such as exploding and dispersion, so it is thought that the system is protected more stably with replacement of polymer housing. The adoption of gap mitigates the voltage stress which is degradation factor of surge arresters and the research is needed to enhance the life characteristic in additive and manufacturing process. Therefore, it is thought that the research should be continued to develop homemade the surge arresters for D.C. railway line as well as transmission line.

  • PDF

표준전동차 자동/무인운전장치 개발 및 주행시험 (Development and Test of Automatic/Driverless Operation System for Standardized EMU)

  • 안태기;이수길;한성호;이관섭
    • 한국철도학회논문집
    • /
    • 제3권3호
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

고속철도 시운전시험 계측시스템 개발에 관한 연구 (Development of a Measurement System Development for On-Line Testing of High Speed Railway)

  • 김석원;김영국;한영재;박찬경;김진환;백광선
    • 한국철도학회논문집
    • /
    • 제5권3호
    • /
    • pp.158-166
    • /
    • 2002
  • In this paper, we introduce the software and hardware of the measurement system for on-line testing and evaluation of high speed railway. The test items focus on the verification of the performance and acquirement of the technical data of the high speed railway system. The software controls the hardware of the measurement system, perform the analysis and calculation of measurement data and acts as interface between users and the system hardware. For this purpose, three programs a measuring program, a monitoring program and post-processing program are developed. The detailed test scenario is in the process of development to closely follow the process of development and design of the system.