In this paper, an effect on power conversion unit in high-speed railway vehicle by loss of contact between a catenary system and pantograph suppling electrical power to high-speed railway vehicle are investigated. One of the most important needs accompanied by increasing the speed of high-speed railway vehicle is reduced that arc phenomenon by loss of contact brings out EMI. in case of high-speed railway vehicle using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occur. To analysis the effect on loss of contact, it is necessary electrical modeling system between the contact line and the pantograph according to the loss of contact. Therefore analytical model of a contact line and a pantograph is constructed to simulate the behaviour of loss of contact. The reliability of the modeling system is verified by simulation implementation on kinds of loss of contact.
High speed and large transfer capability of railroad has been an important issue in Korean since KTX opening at 2004. Improvement projects for railway electrification are progressed in the conventional line as well as high speed line because various operation plan is performed such as interaction between high speed line and conventional line and operation of tilting train etc. Especially, railway electrification has many advantages which are cost effective and eco-friendly. But it also has some problems such as construction costs and accidents due to electrification. Therefore this paper developed measuring index of electrification railway benefit. By comparing between diesel and electrical locomotive, the operations of before and after the electrification and measurements quantitative index such as energy efficiency, enlargement of transfer capability, environmental pollution and maintenance and efficiency of operation is presented. In the future, Overall benefit and cost of railway electrification will be analyzed.
Studied was a strategic plan for the Korean High-Speed Train system to penetrate the Chinese railway market in exchange of the technology of KHST. Firstly, taken was a glance at Chinese Government plans to extend total length of his railway lines and to construct the $Beijing\~Shanghai$ high-speed railway line. Then, disparity of railway technology in Korea and China was reviewed. From the review, SWOT Analysis were carried out to penetrate the foreign markets. Countermeasures to cope with SWOT were also considered. Strategical governmental supports and the establishment of the special organization to be charge of penetration of KHST into foreign markets were proposed. Finally, also proposed was the transfer of KHST technology to Chinese counterparts in exchange of tangible benefits for Korean side, The benefits may include (1) adoption of KHST as the type of rolling stock for the $Beijing\~Shanghai$ line, (2) guarantee of participation in the project and royalty for the KHST technology used for the future high-speed railway line construction. (3) prior written approval and partnership when making its way to third country, and (4) participation of Korean construction companies in Chinese railway construction project. etc. Adoption of KHST in China indeed gives chance to integrate the high-speed railway network after reunification of Korean peninsular, and enhance the economic ties between two countries.
The high-speed railway of catenary system, supplies a stable electric power supply to the train by satisfying the special conditions between pantograph and trolley wire, which operates more than 250km/h mutually sliding and feeding electric lines. According to Korean Railway Standard KRS PW 0026-13 (R), the standard for the grip strength of the dropper clamp in conventional line is established, but the high-speed railway line is not yet. When the grip strength of the dropper clamp is detached from the catenary line of the high-speed railway line, various problems may occur, such as damage to the pantograph due to the collision and arcing. In this paper, it is expected to be used as a basic data for establishing the durability criteria of the high-speed railway dropper clamp by verifying the dropper clamp on the Gyeong-bu and Honam high-speed line.
There are two methodologies to increase transport capacity of railway. One is to invest railroad equipment or vehicles, and the other is to improve operation efficiency through optimization. All of these is intended to increase transport capacity by improving the line capacity, So far, we treat the line capacity as the criteria for evaluating investment alternatives or for restricting train frequencies, and this criteria is calculated statical and experimental numerical formula. But, line capacity has special attribute that changes dynamically according to operational conditions, so there is a need of new line capacity estimation system. Korea Railroad Research Institute(KRRI) proposed a new line capacity estimation system based on the probability simulation method. In this research. we perform analysis of line capacity for the railway improvement alternatives, and to represent the results.
We as a civil investment enterprise have been constructing In-cheon International Airport Railway which is a transportation means to approach In-cheon International Airport. In this alignment. a section between the Seoul station and Ka-joa follows the existing Yong-san line at the center of Seoul city and traverses Seoul subway 2,5,6 lines. So we planned that the alignment would have the shallowest depth to lie under Kyung-eui line and above the airport railroad. The alignment is planned to construct an open-box structure only 3.6m apart from the subway line 5 tunnel structure and construct the open-box structure 0.7m apart from the subway line 2 box structure. In the line planning, we investigated both the security of the existing subway structures during and after construction and the stability and workability between newly structured tunnel structures with three dimensions numerical analysis methods. Also we raised the reliability of design verification which was achieved by specialty society's review on the planned construction method.
This experimental study is shows speed-up possibility for the conventional railway vehicle. We appraise derailment coefficient then increase the velocity of the kyungbu line, honam line, changhang line, kyungjeon line.
Railway safety is based on a risk analysis and safety assessment for the whole railway system as human, train, electric, signaling, operation, maintenance and etc. Therefore in this study, after investigating the accidents happened in electric railway on Choongang line for 5 years, from '97 to '01, a Data-Base was made through a cause and result analysis. In consideration of economic loss and human resources damage, a risk assessment for electric railway was also performed.
At present, Kyungbu high-speed railway is operated with 300km/h, Honam high-speed railway is being constructed with 350km/h, and the development for the overhead contact line system is to be conducted for the next-generation high-speed railway with the speed of 400km/h. It is necessary to set up the specification and criteria for the key parts such as dropper, termination clamp and tension insulator for the 400km/h railway line. In this paper, the specification and the criteria for dropper, termination clamp and tension insulator has been reviewed and proposed in order to secure long-term reliability and stability under the maximum speed of 400km/h. Also, the specification, criteria and international standards for 300km/h class and 350km/h class railway line system and the international standards related with the insulators have been reviewed, compared and analysed.
In this paper, comments on the needs of establishment of railway test line - capable of mid and long term performance evaluation of vehicle/infra/electricity/signal component/system - are described. Based on the previous studies, national/social/economic needs, the states of similar lines of foreign countries, concept of test line, and basic application plan are summarized. Especially, core things needed to the establishment of test line are commented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.