• Title/Summary/Keyword: Railway construction project management

Search Result 61, Processing Time 0.031 seconds

A Study on Developing the Outcome Management System of Construction and Transportation R&D Project (건설교통R&D 사업의 성과관리체계에 관한 연구)

  • Jung, Si-Kyo;Moon, Dae-Seop;Maeng, Hee-Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.967-973
    • /
    • 2009
  • Construction and Transportation R&D budget is increased every year. Therefore, outcome is important issue. Also, we must try for practical use of outcome. And we need strategy for practical use of outcome. This is research for the application of research and development outcome. Specially, this research studies about way for construction standard. And this proposes a institutional improvement. First, it catch a problem point with present condition analysis. Second, It executes a survey and analysis. Finally it presents some policy suggestion. This research solves two problems. This applies to the field of research and development outcome. Another this amend construction standard.

A Study on Establishment of Railway-Related Subsidiaries for Efficiency of Korean Railway Management (철도경영의 효율화를 위한 관련 자회사 설립에 관한 연구)

  • Kim, Kwang-Mo;Yang, Keul-Yul;Kim, Hae-Gon
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.277-284
    • /
    • 2003
  • To meet demand for large-scale new personnel caused by active railway investment projects such as high-speed line construction, electrification and double-tracking of the existing lines, we KNR need to establish a subsidiary firm for each field instead of personnel augmentation. The establishment of subsidiaries is expected to solve the problem of the current outsourcing services, reduce costs and in the long term, improve the efficiency of railway business. In addition, we also suggest, as a pilot project, setting up Korean Freight Inspection Company in charge of conducting light and heavy maintenance for freight cars.

  • PDF

Seoul Metro's railway project to Vietnam (서울메트로의 베트남 철도사업 프로젝트)

  • Son, Young-Jin;Chung, Su-Young;Lee, Jong-Seong;Choi, Si-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1458-1465
    • /
    • 2008
  • With 34 years of accumulated operating experience, Seoul Metro has launched a project aimed at exporting second-hand trains(used EMU cars) to Vietnam while seeking measures for diversifying its business such as the construction of the metropolitan railways both at home and abroad, and operating business as a way of fiscal consolidation and management improvement. Therefore, Seoul Metro has moved ahead with this plan considering that there's no legal constraints on durable period of rolling stocks in advanced countries where the vehicles have been used for 35 years or longer than 40 years through renovation such as safety inspection and comprehensive maintenance program, and the railway systems for the replacement are expected to reach 838 cars by 2015 with growth of 100 cars a year. Seoul Metro strives to create value for boosting revenues and recycling resources by sending used EMUs to Vietnam. Seoul Metro will also provide under-developed countries with cars at a low price as well as share the accumulated railway technical know-how so that it can promote the national image and obtain the pre-emptive effect of metro railways in Vietnam.

  • PDF

Railway Conflict Detection Design for KORAIL Command Center Intergration Signal Equipment Construction Project (철도청 사령실통합 신호설비 구축 프로젝트에서의 경합검지의 설계)

  • Lee Ju-Wang;Kim Bum-Sik;Bum Young-Hyun;Hong Hyo-Sik;Yoo Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1519-1525
    • /
    • 2004
  • 현재 사용되고 있는 열차운행관리 시스템(Railway Traffic Management System, RTMS)에서 경합 검지 및 해소업무는 역 및 선로의 정보(상태)연계 및 자동화의 미비로 인하여 착발선 결정, 착발시간 결정, 교행역, 대피역등에서 발생하는 경합 검지 및 해소(Railway Conflict Detection and Resolution)의 결정이 신속하게 이루어지지 못하고 있다. 본 논문은 국내외적으로 적용하고 있는 열차 경합 검지 방법을 조사 비교하여 가장 적절한 알고리즘을 개발, 구현하여 현재 진행중인 철도청 사령실 통합 신호설비 구축사업 프로젝트에 적용하고자 한다.

  • PDF

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

Present Status and Future Vision of EIA for Railroad Construction Projects (철도건설사업 환경영향평가의 현황과 과제)

  • Lee Hyun-Woo;Lee Young-Joon;Park Young Min;Yoon Mikyung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.296-302
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking 'environmentally sustainable transportation (EST)' projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents accumulated for last six years. The EIA for railroad construction projects .accounts for only $4.9\%$ of total project EIAs during 1998-2003. However, the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water quality, wast management, noise, etc. We also compared the characteristics of environmental impacts of railroad construction with those of vehicle road construction. The result shows that railroad construction usually requires 3${\~}$4 times longer tunnels and bridges for a given length than vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than $40\%$ of those in vehicle road construction. In order to develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly required.

  • PDF

Application of Blockchain Technology to Verify Reliability of Life Cycle BIM Model for Civil Engineering Project (블록체인기술을 활용한 토목공사 생애주기 BIM 모델의 신뢰성 확보 방안)

  • Lee, Jaehee;Moon, Hyounseok;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.116-124
    • /
    • 2021
  • As the utilization of the BIM model increases in the design and construction stages of a construction project, the utilization of BIM in the maintenance stage can also increase. In the maintenance stage, BIM objects created in the design and construction stages that have already been completed are used. Therefore, it is necessary to verify the reliability of whether the used BIM object is a certified model created in the design stage. In particular, the reliability of the BIM model becomes more important in a project such as railway facilities composed of various construction activities with civil engineering, architecture, electricity, signal, and track work. This study proposes a methodology of using blockchain technology as a way to secure the reliability of the BIM model used in the maintenance phase, and constructs the block structure and detailed process for applying the blockchain technology to BIM. In addition, by applying this process to the BIM model of an actual facility to generate a block, it was confirmed that the blockchain technology can be used as a tool to secure the reliability of the BIM model.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.