Korean government announced long-term railway safety investment plan for the safety improvement by 2020. But no research have been done about differential analysis on railroad safety investment and safety improvement. In this study, recent 10 year data on safety investments and accident data are analysed for the differential analysis. Three main safety investments are analysed on regard to accident rate and accident fatalities. Three safety measures include level crossing accident, platform fatalities, and track trespass fatalities. About 90% of railway accident fatalities are caused by these three kind of accidents. Differential analysis shows about 4 to 6 years delay after railroad safety investment and safety improvement. This result can be utilized for the decision making on safety measures and safety target. Which required long term approach.
Recently, advancements in railway system and IT have enabled automatic or driverless train. Futhermore, developed countries have been tried to develope unmaned operation system for railway system. To apply manless operation in railway system, development of simulator for manless operation is required. The advantage of the simulator is in that it makes it possible to analyze the systems behavior. In this paper, we define system requirements and functionalities, and establish the system scenarios to handle the various accidents/faults in manless operation environment. We expects the proposed system requirements and system scenarios will playa key role to establish the man less operation in advanced urban transit system.
In this paper, we propose context information communication system using RF module to prevent railway cross accident. Since the communication module transmits to the train with high bit rate, OFDM(Orthogonal frequency division multiplexing) modulation method that distributes high speed data and transmits multiple times is applied. And image information is transmitted to the train's transceiver device by using ISM band (2.4GHz frequency band) that is proper to mobile communication. By using this system, we can deal with urgent situations at the railway cross and prevent railway cross accidents in advance.
A route control in railway is one of the very important system to operate a train. An efficient train route control assures to increase train operation performance with a same railway system. The erroneous route control can accompany serious accidents which occur train collision or derailment which provokes death. A Route control carries out exactly lest the accident should take place. An interlocking table is widely used for the exact route control. The table has the problem of its exactness proving because it has been established by experts. In this paper, We tried to formalize a route control using mathematical logic. A route consists of symbolized tracks, signals, switch and crossing. It represents as a set, respectively. We proposed route setting control logic, converted the elements to set logics and construct route logics with the set logics of the elements. Finally we proposed a model which presents a prototype routes and we proved the proposed logics using the proposed method.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.11
/
pp.31-45
/
2017
According to the railway accident statistics in recent years, the frequency of accidents has been significantly reduced, due to the advance of related technologies and the establishment of safety information management systems. Nonetheless, accidents due to errors in the operation and maintenance phase and faults in safety design continue to occur. Therefore, to prevent accidents, guidelines for the safety design and manufacture of railway vehicles were established, and a request for the independent safety evaluation of safety designs was made. To respond to this, rail system developers must prepare safety cases as a safety activity product. One of the main items of these safety cases is the safety-related application conditions (SRAC) and, thus, the question of how to develop these SRAC is an important one. The SRAC studies reported so far focused only on the simplicity of the derivation procedure and the specific safety activities in the design phase. This method seems to have the advantage of quickly deriving SRAC items. However, there is a risk that some important safety-related items may be missing. As such, this paper proposes an improved method of developing the SRAC based on the idea of performing both the safety design and safety evaluation activities throughout the whole system lifecycle. In this way, it is possible to develop and manage the SRAC more systematically. Especially, considering the SRAC from the initial stage of the design can allow the safety requirements to be reflected to a greater extent. Also, an application case study on railway signaling systems shows that the method presented herein can prevent the omission of important safety-related items, due to the consideration of the SRAC throughout the system lifecycle.
Seoul Metro railway facilities' inspection and maintenance tasks cause failure analysis, but if there is trouble the diverse cause investigation and the systematic analysis and management among broken facilities, related facilities and components fell short and the conditions are different. And, excess and insufficiency, under inspection and maintenance, is being raised regardless of the introduction year and the operating environment including the number of use by applying the same facilities in the uniform inspection cycle. In this study, we will analysis systematically facility system information, failures, operational status, performance, fault and maintenance information resulting from the maintenance management of railway facilities and derive the relationship between associated equipment and its components. In addition, optimizing the inspection and the maintenance cycles of railway facilities, we will improve the reliability of operation. Considering the probability of risk, it is possible to predict the occurrence of accidents or faults and to minimize the frequency of breakdown by pre-inspection maintenance. Finally, This paper is to introduce the content of constructing the Seoul Metro RCM-based failure analysis system for railway facilities to support the optimal continuance of operation status of equipments and the securement of the safe operation of vehicles.
Proceedings of the Korean Society for Rock Mechanics Conference
/
2008.10a
/
pp.33-41
/
2008
The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.
The government of South Korea has made great efforts in the area of railway safety management by means of a railway safety law and an integrated railway safety plan established in 2004 after the Daegu subway fire accident. However, after certain railway incidents, a reactive railway safety management system has been implemented that has led to fatal accidents caused by the collision, derailment, and fire every year. Hence, this study is intended to propose a framework that integrates data from distributed detection devices into a real-time railway safety monitoring and control system for proactive safety management. Furthermore, we will provide a future development direction for safety performance monitoring indicators to determine whether the railway safety monitoring and control system works effectively. The proposed framework is expected to be a cornerstone for the real-time railway safety monitoring and control system to be implemented in the future.
Turnout is one of railroad track components. The turnout is used to change train routes to near other sections when keeping the train speed. There are many accidents in the section including the turnout. The number of accidents and errors is 363 for ten years in the section including the turnout and annual average is 36.3. To ensure safety of the turnout, it is necessary to install monitoring systems. By using the monitoring systems, it is able to accumulate related information, develop maintenance and take a step for accidents in advance. Hence, The number of accidents and errors is decreased in the section including the turnout. So, when new turnout is installed, it is needed to use monitoring systems. Therefore, combined turnout management system is needed in Korea. It is possible to perform efficient maintenance because real-time monitoring system by using sensors and data-base management system. In this paper, accidents in the section including domestic turnout are analyzed and foreign combined turnout management system is presented. Hence, articles for installing the combined turnout management system in Korea are proposed.
A goal of the Real-time railway safety supervision system is to improve the safety oversight efficiency and to prevent accidents by integrating existing distributed monitoring systems, train, signal, power and facilities. So, the system require better performance regarding real-time processing based on big data. The disk-based database that is used in existing railway control systems has a problem with real-time processing; memory-based databases haves a limitation in terms of big-data processing; and time series databases haves a limitation in terms of real-time processing. So, we need a new database architecture for simultaneous real-time processing based on big data. In this study, we review the existing railway monitoring systems and propose a new database architecture for a real-time railway safety supervision system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.