• Title/Summary/Keyword: Railroad-tunnel

Search Result 232, Processing Time 0.027 seconds

Aerodynamic analysis for train operation without the effect of the passenger ear-discomfort in tunnel of new Seoul-Chunchon line (경춘선 1급 신설터널에서 열차승객의 이명감 없이 주행 가능한 열차속도에 대한 연구)

  • 김동현
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.495-502
    • /
    • 2000
  • For the tunnel design of the first class on new Seoul-Chunchon railway, we investigated for train speeds to run through tunnels without ear-discomfort of passenger in cabin by application of numerical analysis. Also we analyzed the effect of the wind speed induced by train in tunnel that is very harmful to the workers on railroad and the effect of the air-pressure fluctuations which get the fatigue to the tunnel lining and the car body.

  • PDF

A performance analysis in the mountains and tunnels of AT-PASS (Access Train -Portable Access Signal alarm System) of GPS type (GPS방식의 열차접근경보기의 지형에 따른 영향 분석)

  • Ohn Jung-Guen;Shim Jae-Bock;Kwon Ki Jin;Choi Yeng-Ha
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1266-1271
    • /
    • 2004
  • AT-PASS(Access Train-Portable Access Signal alarm System) which is used at railroad sideway has an important effect upon geography. Especially, it is used at railroad which is a particular condition, tunnel, curve sections and electric car line sections. Therefore, this paper investigated an affection though field test of railroad which is a particular condition.

  • PDF

A Case Study of Electronic-blasting, Railroad Tunnel to Pass under Existing Highway (기존 고속도로 하부 통과를 위한 철도터널 전자발파 시공사례)

  • Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.16-24
    • /
    • 2014
  • In this "Wonju~Jaecheon double-lanes railroad" project, a highway is located at about 13meter above a tunnel. Initially, rock-splitting method was used for the tunnel excavation in order to minimize the possible damage on the highway. The method, however, takes a long time for the tunnel excavation and that may cause other problems like large displacement of tunnel and subsidence of highway ground before the tunnel can be stabilized by supporters. Therefore, the application of electronic blasting method(eDdevII) was recommended to control the blast vibration below 1.0cm/sec as well as to prevent the subsidence of highway ground. The analysis of the influence of tunnel excavation on the highway showed that electric blasting method is permissible for the safe management of the highway. Based on that, the tunnel construction under a highway could be carried out quickly and safely without any damages on the highway.

A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel (여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구)

  • Yang, Joo-Kyoung;Kim, Hyo-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.5
    • /
    • pp.101-107
    • /
    • 2017
  • Over-break, which is excavated larger than planned line at tunnel excavation, is inevitable due to the nature of blasting. But regarding the bottom of the foundation, most of the domestic ordering organizations pay only 10 cm thick filled concrete when pouring concrete due to over-break. In accordance, the construction cost will increase greatly if all the depths of the designed over-break are filled only with concrete. When tunnel excavation occurs, concrete filling of 18 MPa(T = 100 mm) and 150 mm~237 mm auxiliary concrete layer and 240 mm concrete track(TCL) are applied to the upper part. The concrete is installed in an excessive amount of about 600 mm between the lower part of the rail and the tunnel rock bed. Therefore, in this study, it is necessary to analyze the concrete crack structure according to the depth of the existing tunnel and the modified tunnel section, and to evaluate the adequacy of the required thickness of the tunnel floor concrete for securing the crack stability of the concrete.

A design case study of the very wide 3-arch tunnel under Daejeon railroad station building (I) (대전역사 하부통과 3-arch 터널의 설계사례 연구 (I))

  • Chang, Seok-Bue;Moon, Sang-Jo;Kwon, Seung;Huh, Do-Hak;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.247-260
    • /
    • 2002
  • This paper presents the design case of the 3-arch tunnel under Daejeon railroad station building. The original construction method was the underpinning method supported by pipe-roof, but it was changed to the mined tunnelling method because of the complex construction condition and the safety problem. This 3-arch tunnel has a width of 28 meters and a height of 10 meters. Overburden is only 23m and the ground around the tunnel is a weathered rock. The allowable settlements for the station building and some railroads are very strict. Accordingly, various measurements for the tunnel stability and the settlement minimization was applied and they were reviewed by 2-D and 3-D numerical analysis.

  • PDF

A Case study on the construction of a long tunnel in the youngdong railroad (Mt. Dongbaek-Dokye) (영동선 동백산-도계간 장대터널 시공사례 연구)

  • Kim, Yong-Il;Yoon, Young-Hoon;Cho, Sang-Kook;Yang, Jong-Hwa;Lee, Nai-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.155-165
    • /
    • 2002
  • This paper presents a case study on the construction of a long tunnel named as "Solan tunnel", which connects between Mt. Dongbaek station and Dokye station in the Youngdong Railroad. The tunnel will be the longest tunnel with length of 16.4 km in Korea when completed. The tunnel site is located in a complex geological region with faults, cavities and coal measures. In construction of adit No. 2, geophysical investigation methods such as electrical resistivity method and GPR(Ground Penetration Radar) were used to detect faults, cavities and coal measures in advance with some success. The geophysical investigation results and in-situ boring data were used as feedback to improve tunnel reinforcement design. Also, the tube umbrellas of grouted steel pipes were found to have a good reinforcement and grouting effects in zones of faults, cavities. In zones of coal measures, swellex rockbolts with mortar grouting were verified as successful.

  • PDF

A Study on Effect of Vibration Reduction with Ballast Mat of Ballasted Track in Tunnel (터널내 자갈도상제도의 자갈도상매트 시공 후 진동 저감 효과에 대한 연구)

  • You, Chung-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.167-174
    • /
    • 2009
  • Due to the travelling of the train with high speed the period of maintenance activities of the ballasted track is coming to be short, and more from the residential area of the ballasted track tunnel circumference the civil appeal is increasing with railroad vibration problem. To reduce the vibration problem and a maintenance cost establishes the ballast mat in the tunnel within part segment. In this study, to estimate the vibration reduction effect of the ballast mat we have done a comparative analysis with the vibration field test by the transit train by at the ballasted track with ballast mat and the standard ballasted track without vibration protection in tunnel.

Safety of Train Passengers in a Tunnel

  • Kim, Dong-Jin;Moon, Dae-Seop;Moon, Seong-Am;Hwang, Young-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.16-21
    • /
    • 2007
  • Along with the opening of the high speed railroad in 2004, the number of long tunnels constructed is increasing and will be continued. In this respect, the fro inside the tunnels is a main cause of drastic damages to both facilities and lives of passengers on board, especially more severe consequences are expected if the fire occurs on a train in urban area. Even though, the threat to human lives due to the increasing number of tong tunnels and increasing train operation times inside such tunnels is getting bigger, the studies to measure safety of the tunnel and to enhance the safety of passengers have not been carried out enough in Korea. Therefore, in this paper, we will use the probabilistic method to predict the average number of deaths of passengers in case of fire on a train iii tunnel, and show the potential risk to passengers which can be a guide for safer design of tunnels to be constructed.

Development of a Simulator for Radio Propagation Path Loss in Tunnel at 18GHz (터널환경에서 18GHz 대역신호의 전파경로손실 예측 시뮬레이터 개발)

  • An, Tae-Ki;Kim, Back-Hyun;Nam, Myung-Woo;Lee, Young-Seock;Jeong, Sang-Guk;Oh, Myung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1796-1802
    • /
    • 2011
  • In this paper, the radio propagation path loss prediction simulator in tunnel was developed. It used a image theory method for analysing precise radio propagation path. And it can predict radio propagation path loss in straight and curved tunnels. The simulator can plot realtime radio propagation paths using various parameters which was input by user. And it can simulate from changing transmitter and receiver positions. The predicted path loss of simulator was compared with the measurements in Chunhyun tunnel and confirmed the validity.