• Title/Summary/Keyword: Rail pressure

Search Result 344, Processing Time 0.022 seconds

A Study on the Reinforcement Effect Analysis of Aging Agricultural Reservoir using Surface Stabilizer (표층안정재를 사용한 노후 농업용 저수지의 보강효과 분석에 관한 연구)

  • Kim, Jae-Hong;Kim, You-Seong;Cho, Dae-sung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.2
    • /
    • pp.13-21
    • /
    • 2020
  • In Korea, small reservoirs have been constructed for the supply of agricultural water, but most of them have been over 50 years from the year of construction. Aging agricultural reservoirs are being investigated for serious defects such as leaks and movements in slope, which are very vulnerable to safety. Accordingly, grouting methods are used to reinforce aging agricultural reservoirs in Korea. However, cement used as a grouting injection material consumes natural resources and generates a large amount of greenhouse gases during production. In addition, there is a problem that sufficient reinforcement is not made due to various factors such as the injection amount, the compounding ratio, the injection pressure, and etc. Therefore, due to these problems, the development of new materials and methods that can replace the grouting method and cement is required. In order to solve these problems, this study conducted an laboratory test on the surface stabilizer used to secure the stability of road and rail slopes. In addition, the program was analyzed and the reinforcing effect was examined when the surface stabilizer was used as reinforcement material for aging agricultural reservoir. As a result of the laboratory test, when the surface stabilizer is mixed, the increase of cohesion is possible up to 9% and there is no change in the friction angle. The results of the program analysis showed that the 1.0m reinforcement of slopes increased the factor of safety by 1.4 times, making it possible to reinforce the aging agricultural reservoir using surface stabilizers. And as a reinforcement method, it was analyzed that it is most appropriate to reinforce the slope and the bottom of slope simultaneously.

Tunneling in Severe Groundwater Inflow Condition (지하수 과다유입 조건하에서의 터널굴착)

  • Lee, Young-Nam;Kim, Dae-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.67-76
    • /
    • 2006
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

An analysis of the Behaviour of Uplift-Resisting Ground Anchors from Pull-out Tests (현장시험을 통한 부력앵커의 거동분석)

  • Lee, Cheolju;Jun, Sanghyun;Yoo, Namjae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • Engineering behaviour of uplift-resisting ground anchors constructed in weathered rocks has been investigated by carrying out a series of full scale pull-out tests. The anchor was to resist uplift forces (buoyancy) associated with high groundwater table acting on the basement of a rail way station. The study has included the ultimate pull-out capacity of the anchors and shear stress transfer mechanism at the anchor-ground interface. The pull-out tests were conducted by changing bonded lengths of the anchor (2~7 m) and diameter of drilled borehole (108~165 mm) to investigate their effects on the behaviour of the anchor. The measured results showed that the ultimate capacity of the anchors was increased with an increase in the bonded length, diameter of drilled borehole as expected. The ultimate capacity of the anchors deduced from the pull-out tests ranged from 392 to 1,569 kN, depending on the above-mentioned factors. This corresponds to the interface shear strength of about 227~505 kPa. Interface shear stresses deduced from the pull-out test showed that the larger the pull-out force, the larger the mobilisation of the interface shear strength. The failure mode of the anchors heavily depended on the bonded lengths of the anchors. When the bonded length was short (2~3 m), a cone-type failure was observed, whereas when the bonded length increased (5~7 m), failure developed at the grout-ground interface.

  • PDF

Probabilistic Braking Performance Analysis for Train Control System (열차제어시스템을 위한 확률적 제동성능분석)

  • Choi, Don Bum
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.319-326
    • /
    • 2018
  • The safety interval to prevent collision between trains in a train control system is based on the braking distance according to the emergency braking of the train. The evaluation of the braking performance is based on the longitudinal train dynamics or the commissioning test in the test track, but since the conditions such as the weakening of the adhesion coefficient between the wheel and rail can not all be considered, these conventional methods are not sufficient to design of the train control systems. Therefore, in this study, the Monte Carlo Method (MCM) which can consider various environments is used to analyze braking performance and limitations. The braking model is based on the air braking used in the emergency braking and is modeled to take into account the braking pressure, efficiency, friction coefficient, adhesion condition, and vehicle mass distribution. It is confirmed that braking performance can be improved by controlling the quality of braking device. In addition, the change of the braking performance was confirmed according to the vehicle constituting the train. The results of this study are expected to be used as basic information for designing safety clearance for the train control systems and as a basis for improving the braking performance of railway vehicles.