Journal of the Korean Society for Aviation and Aeronautics
/
v.27
no.1
/
pp.20-25
/
2019
To prepare for the ever-increasing demand for air transport, airport operators should be well aware of the timing of the saturation of the facility and increase the capacity of the airport through extension or extension. The capacity of an airport is determined by the smallest value of the facilities that make up the airport, but it is generally customary to determine the capacity of the costly and time-consuming runway as a whole for the airport. For analyzing the capacity of the runway capacity, the study used the most accurate microscopic air traffic simulation, Simmod-PRO, to analyze the saturation time of three runways currently in Incheon International Airport's operation, and calculate the appropriate time for operation of the 4th runway. The study also calculate the relocation of Airport's high-speed exit taxiway for analyzing the increasing of capacity.
The runway visual range affected by fog and so on is one of the important indicators to determine whether aircraft can take off and land at the airport or not. In the case of airports where transportation airplanes are operated, major weather forecasts including the runway visual range for local area have been released and provided to aviation workers for recognizing that. This paper proposes a runway visual range estimation model with a deep neural network applied recently to various fields such as image processing, speech recognition, natural language processing, etc. It is developed and implemented for estimating a runway visual range of local airport with a deep neural network. It utilizes the past actual weather observation data of the applied airfield for constituting the learning of the neural network. It can show comparatively the accurate estimation result when it compares the results with the existing observation data. The proposed model can be used to generate weather information on the airfield for which no other forecasting function is available.
Among the phases of flight operations pilots feel much pressure in landing segment. There is a number of factors affecting landing safety while pilots reduce aircraft speeds and make a touchdown and stop completely. If runway length is sufficient for landing, there maybe is no problem. But it is not the case all the time. So it is necessary to confirm whether landing performance is within limits or not. Required landing distance is actual landing distance demonstrated by flight test pilot plus allowances for average airline pilots. FAR(Federal Aviation Regulations) AFM certification is based upon manual landing for dry and wet runway. Other runway conditions are not the certification basis. JAR dictates even contaminated/slippery runway is included by prescribed allowances. Automatic landing is not certification basis, so actual landing distances are provided. In this paper I would like to analyze distance allowances included in each type of runway condition. In addition there is no regulation about allowances for specific runway condition, I would suggest adequate allowances for that case.
Park, Jisuk;Yun, Seokjae;Lee, Youngjong;Baik, Hojong
Journal of Korean Society of Transportation
/
v.33
no.2
/
pp.214-222
/
2015
Jeju International Airport has become the most delayed airport in Korea, due to increased demand in air passengers and unexpected local weather condition. Observing the demands continuously grow for a decade, the airport is expected to be saturated in the near future. As a part of effort to prepare effective and timely measure for this expected situation, airport planners seeks the annual runway capacity, i.e., the appropriate number of flight operations in a given year with tolerable delay. In practice, the FAA formula is frequently adopted for the capacity estimation. The method, however, has intrinsic issues: 1) the hourly capacity imbedded in the formula is not clearly defined and thus the estimated value is vulnerable to be subjective judgement, and 2) the formula doesn't consider aircraft delay resulted from runway congestion. In this paper, we explain a novel method for estimating the daily runway capacity and then converting to the annual capacity taking into account the aircraft delay. In this paper, average delay of aircraft was measured using microscopic air traffic simulation model. Daily capacity of the runways were analyzed based on the simulation outputs and the method to assess the yearly capacity is introduced. Using a microscopic simulation model named TAAM, we measure the average aircraft delay at various levels of flight demand, and then estimate the practical daily runway capacity. The estimated daily and annual runway capacities of Jeju airport are about 460 operations a day which is equal to 169,000 operations year. The paper discusses how to verify the simulation model, and also suggests potential enhancement of the method.
Current Industrial and Technological Trends in Aerospace
/
v.7
no.2
/
pp.115-120
/
2009
Description in this paper is a system for new range measurement method between an aircraft and runway with circular mark in landing runway. The system includes an altimeter and a camera installed on the aircraft, and a circular mark placed on a landing runway. The camera installed on the aircraft must be oriented toward in front of the aircraft, and configured to detect the shape of the circular mark in image information form and a flight control computer configured to calculate the angle between the aircraft and the ground, the ground range between the aircraft and the circular mark, and the slant range between the aircraft and the circular mark with the altitude information measured by the altimeter. This system configured to control the automatic landing of the aircraft with this information.
Journal of the Korean Society for Aviation and Aeronautics
/
v.23
no.2
/
pp.1-6
/
2015
The RSA is intended to prevent the following five types of events from becoming an accident: landing overruns, landing undershoots, landing veer-offs, takeoff overruns and takeoff veer-offs. The improved models are based on evidence from worldwide accidents and incidents that occurred during the past 27 years. The analysis utilizes historical data from the specific airport and allows the user to take into consideration specific operational conditions to which movements are subject, as well as the actual or planned RSA conditions in terms of dimensions, configuration, type of terrain, and boundaries defined by existing obstacles. This paper shows how to apply the improved models for Risk Assessment of Runway Safety Areas (Airport cooperative research program(ACRP) Report 50) into an airport and the outcome differences between the old models based on ACRP report 3-Analysis of aircraft overrun and undershoots for runway safety areas and the new models from ACRP report 50 in the specific airport.
This paper illustrates how simulation modeling can be reduced of ground turbulence by the constructions in the vicinity of airport runway and reports on a cause of ground turbulence using two-dimensional CFD analysis. Interesting result is that the shape in cross-section show the higher ground turbulence than the height of the building. The predicted results confirmed reduction of wind-effect by doing that set up the building with a fence, terraced shape or gap and it can generate turbulence in embryo at this stage. We knows that cross-wind effect in the vicinity of airport runway is highly dependent on the shape of the buildings.
Journal of the Korean Society for Aviation and Aeronautics
/
v.20
no.3
/
pp.1-7
/
2012
Korea Aerospace Research Institute(KARI) has accomplished the planning study for setting up the mid-long term development plan of Goheung Aviation Test Center for the extensive use. In the future the aviation center will have a role of the complex center for the flight test, component test and R&D in Korea. KARI searches the legal requirements and informations for constructing the aviation test airfield in Goheung. Aviation law describes a lot of requirements to construct an airfield and the airfield also needs runway, equipments/facilities, obstacle limitation surfaces/distances, limitation altitudes and air space etc.. In this study the research results for the obstacle limitation Surface are mainly presented relating to the existing runway and the new large-scaled runway in Goheung.
International Journal of Internet, Broadcasting and Communication
/
v.16
no.1
/
pp.86-91
/
2024
In the field of artistic creation, the iterative development of AI-generated video software has pushed the boundaries of multimedia content creation and provided powerful creative tools for non-professionals. This paper extensively examines two leading AI-generated video software, PIKA Labs and RUNWAY, discussing their functions, performance differences, and application scopes in the video generation domain. Through detailed operational examples, a comparative analysis of their functionalities, as well as the advantages and limitations of each in generating video content, is presented. By comparison, it can be found that PIKA Labs and RUNWAY have excellent performance in stability and creativity. Therefore, the purpose of this study is to comprehensively elucidate the operating mechanisms of these two AI software, in order to intuitively demonstrate the advantages of each software. Simultaneously, this study provides valuable references for professionals and creators in the video production field, assisting them in selecting the most suitable tools for different scenarios, thereby advancing the application and development of AI-generated video software in multimedia content creation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.