• 제목/요약/키워드: RIVER RESTORATION

검색결과 557건 처리시간 0.026초

Restoration Modeling Analysis for Abandoned Channels of the Mangyeong River

  • Kim, Jae-Hoon;Julien, Pierre Y.;Ji, Un;Kang, Joon-Gu
    • 한국환경과학회지
    • /
    • 제20권5호
    • /
    • pp.555-564
    • /
    • 2011
  • This study examines the potential restoration of abandoned channels of the Mangyeong River in South Korea. To analyze the morphological changes and equilibrium conditions, a flow duration analysis was performed to obtain the discharge of 255 m3/s with a recurrence interval of 1.5 year. It is a gravel-bed stream with a median bed diameter of 36 mm. The reach-averaged results using HEC-RAS showed that the top width is 244 m, the mean flow depth is 1.11 m, the width/depth ratio is very high at 277, the channel velocity is 1.18 m/s, and the Froude number is also high at 0.42. The hydraulic parameters vary in the vicinity of the three sills which control the bed elevation. The total sediment load is 6,500 tons per day and the equivalent sediment concentration is 240 mg/l. The Engelund-Hansen method was closer to the field measurements than any other method. The bed material coarser than 33 mm will not move. The methods of Julien-Wargadalam and Lacey gave an equilibrium channel width of 83 m and 77 m respectively, which demonstrates that the Mangyeong River is currently very wide and shallow. The planform geometry for the Mangyeong River is definitely straight with a sinuosity as low as 1.03. The thalweg and mean bed elevation profiles were analyzed using field measurements in 1976, 1993 and 2009. The measured profiles indicated that the channel has degraded about 2 m since 1976. The coarse gravel material and large width-depth ratio increase the stability of the bed material in this reach.

하천의 지형학적 인자와 식생종수의 관계 -한강수계를 중심으로- (Relationship between Stream Geomophological Factors and the Vegetation Abundance - With a Special Reference to the Han River System -)

  • 이광우;김태균;심우경
    • 한국조경학회지
    • /
    • 제30권3호
    • /
    • pp.73-85
    • /
    • 2002
  • The purpose of this study was to develop prediction models for plant species abundance by stream restoration. Generally the stream plant is affected by stream gemophology. So in this study, the relationship between the vegetation abundance and stream gemophology was developed by multiple regression analysis. The stream characteristics utilized in this study were longitudinal slope, transectional slope, micro-landforms through the longitudinal direction, riparian width and geometric mean diameter and biggest diameter of bed material, and cumulated coarse and fine sand weight portion. The Pyungchang River with mountainous watershed and the Kyungan stream and the Bokha stream in the agricultural region were selected and vegetation species abundance and stream characteristics were documented from the site at 2~3km intervals from the upper stream to the lower. The Models for predicting the vegetation abundance were developed by multiple regression analysis using SPSS statistics package. The linear relationship between the dependant(species abundance) and independant(stream characteristics) variables was tested by a graphical method. Longitudinal and transectional slope had a nonlinear relationship with species abundance. In the next step, the independance between the independant variables was tested and the correlation between independant and dependant variables was tested by the Pearson bivariate correlation test. The selected independant variables were transectional slope, riparian width, and cumulated fine sand weight portion. From the multiple regression analysis, the $R^2$for the Pyungchang river, Kyungan stream, Bokga stream were 0.651, 0.512 and 0.240 respectively. The natural stream configuration in the Pyungchang river had the best result and the lower $R^2$for Kyunan and Bokha stream were due to human impact which disturbed the natural ecosystem. The lowest $R^2$for the Bokha stream was due to the shifting sandy bed. If the stream bed is fugitive, the prediction model may not be valid. Using the multiple regression models, the vegetation abundance could be predicted with stream characteristics such as, transection slope, riaparian width, cumulated fine sand weigth portion, after stream restoration.

효율적인 하천관리를 위한 하천생태 특성을 고려한 유형 분류 - 낙동강수계를 대상으로 - (Stream Classification Based on the Ecological Characteristics for Effective Stream Management - In the Case of Nakdong River -)

  • 이유경;이상우
    • 한국환경복원기술학회지
    • /
    • 제15권5호
    • /
    • pp.103-114
    • /
    • 2012
  • The purpose of this research is classifying stream into different types depending on various factor from the perspective of stream corridor restoration and using it as basic data, which are used to consider efficient management and planning for the healthy stream according to the characteristic by types. In this study, 130 points of location of the Nakdong river basin which consist of various geographic factors have been chosen and hierarchical cluster analysis has been carried out in these points by using biological and physiochemical factors whose health can be considered to be predicted and evaluated. As a result of cluster analysis, there were three divided types. Type A whose biology and water quality are considered the best was the highest in forest area percentage so that it was classified into natural stream. Type B was classified into a rural region stream with a mixture of urban and agricultural region. Type C, with the most damaged water quality and biology health had the most urban region surface area and was named as urban region stream. Moreover, an overall restoration strategy according to characteristic by stream types was set. By the results of correlation analysis on factors, water quality showed a high correlation with biological properties and was affected by surrounding land usage. In evaluation of streams, it proves the need to consider not only other habitat's geographical and biological factors but also the water quality and land usage factors. There needs to be further research on stream ecosystem functionality factors and structural aspects by using a more objective and total evaluation result in selecting additional index and various other specific classification methods by stream types and its restoration strategies.

조종천에 재도입된 멸종위기어류 가는돌고기 Pseudopungtungia tenuicorpa (Pisces: Cyprinidae) 복원사업은 정말 실패하였는가? (Has the Restoration Project of Pseudopungtungia tenuicorpa (Pisces: Cyprinidae) in the Jojongcheon Stream, Hangang River Failed?)

  • 한미숙;최광식;고명훈
    • 한국어류학회지
    • /
    • 제32권3호
    • /
    • pp.182-190
    • /
    • 2020
  • 멸종위기어류 가는돌고기 Pseudopungtungia tenuicorpa 복원사업의 일환으로, 2011~2012년 한강의 조종천에 가는돌고기가 방류되었다. 이후 2014부터 2016년까지 방류지에서 가는돌고기가 채집되지 않아 복원사업은 실패한 것으로 평가되었다. 본 연구는 가는돌고기 복원사업이 정말 실패하였는가를 검증하기 위해 2017년부터 2019년까지 정밀조사를 실시하였다. 조사지점은 방류지점을 포함하여 6개 지점을 선정하였으며, 족대와 투망, 일각망, 스쿠버다이빙 등을 이용하여 어류를 채집하였다. 조사결과 방류지점을 포함한 약 0.5 km 구간에서 13개체가 채집되었다. 가는돌고기 서식지역은 수심 0.5~2 m의 큰돌과 암반으로 이루어진 느린 여울부였다. 채집된 가는 돌고기의 연령은 당년생(0+)부터 3년생 이상으로 구성되어 있었으며, 지속적으로 세대교번이 일어나고 있었다. 따라서 조종천에 재도입된 가는돌고기는 비록 많은 개체가 서식하지 않았으나 서식지에 정착하여 지속적으로 세대교번을 하고 있어, 가는돌고기 복원사업은 부분성공으로 평가되었다.

맹꽁이 서식지 복원공사 중 포획 및 이주과정에 대한 연구 -전주시 삼천 생태하천 복원사업을 대상으로- (The process of capture and translocation during habitat restoration construction of Kaloula borealis - A Case Study of Samcheon Ecological River Restoration, Jeonju City -)

  • 임현정;김종만;정문선
    • 한국환경복원기술학회지
    • /
    • 제24권2호
    • /
    • pp.103-114
    • /
    • 2021
  • The purpose of this study is to provide basic data for habitat restoration by implementing a series of processes of capturing and translocating Kaloula borealis and managing them in artificial breeding facilities. The study site in Samcheon, Jeonju-si, Jeollabuk-do was a waste landfill site in the past, and Kaloula borealis was found during the Samcheon Ecological River Restoration Project around March 2018. To restore the habitat, a plan was established to capture, translocate, artificially breed, and release Kaloula borealis at the site. The capture methods of adult Kaloula borealis were pitfall trap and drift fence, direct capture, and deep barrels. During 2018-2019, 86 adults of Kaloula borealis were captured and translocated to artificial breeding facilities. VIE-tagging was inserted under the skin for monitoring. For artificial breeding, Gryllus bimaculatus with oyster powder and vegetables were regularly supplied to feed Kaloula borealis. At the end of October 2020, 150 young Kaloula borealis raised in artificial breeding facilities were found not entering hibernation, so they were managed in a separate artificial breeding facility. Some young and adult Kaloula borealis currently hibernating will be scheduled to be continuously managed in artificial breeding facilities and released to the restored habitat in the spring of 2021.

저수로 물길 복원을 통한 서식처 공간 변화 연구 (A Case Study of the Habitat Changes due to the Restoration of Low-Flow Channel)

  • 최종근;최흥식;최병웅
    • Ecology and Resilient Infrastructure
    • /
    • 제6권1호
    • /
    • pp.58-68
    • /
    • 2019
  • 본 연구는 저수로 물길 복원 조성을 통한 복원이 어류 서식처에 미치는 영향을 파악하기 위하여 원주천을 대상으로 물리서식처 분석을 수행하였다. 대상 어종은 원주천 중 상류에 서식하는 우점종인 참갈겨니를 대상으로 하였다. 흐름 분석은 2차원 모형인 River2D 모형을 사용하였으며, 서식처 분석은 서식처 적합도 곡선을 이용하여 서식처의 양과 질을 산정하는 서식처 적합도 모형을 사용하였다. 먼저 저수로 복원을 위하여 대상 구간의 강턱유량을 통하여 저수로 물길을 확인하고, 이를 통해 수리학적으로 유리한 저수로 단면을 설계하였다. 또한, 저수로 구간에 거석, 여울/소 구조, 그리고 단면 확폭을 통하여 다양한 복원기법을 적용하였다. 그 결과 수리학적으로 유리한 저수로 물길 복원 조성의 경우 현상태의 하폭보다 감소하였기 때문에 서식처가 악화되는 것으로 나타났다. 그러나 다양한 복원 기법을 적용하였을 때 서식처는 약 11% 정도 향상되는 것으로 나타났다.

하상오염물 제거에 의한 수질개선효과 수치모델링 (Numerical Simulation of Water Quality Enhancement by Removal of Contaminated Bed Material)

  • 이남주
    • 상하수도학회지
    • /
    • 제25권3호
    • /
    • pp.349-357
    • /
    • 2011
  • This study has an objective to estimate effect on water-quality enhancement by removal of contaminated river-bed material using a two-dimensional numerical modeling in the Seonakdong River, the Pyunggang River and the Maekdo River. RMA2 and RMA4 models were used for flow and contaminant transport simulation, respectively. After the analysis of the effects of flow restoration plan for the Seonakdong River system made by Lee et al (2008), simulation have been performed about scenarios which contains operations of the Daejeo Gate, the Noksan Gate, the Makdo Gate (on planning), and the Noksan Pumping Station. Because there is no option for elution from bed sediment in the RMA4 model, a simple technique has been used for initial condition modification for elution. The analyses revealed that the effect on water quality improvement due to dredging of bed sediment seemed to be less than 10 % of the total effect. The most efficient measure for the water quality improvement of the river system was the linked operation of water-gates and pumping station.

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2011년도 학술발표회
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF