• 제목/요약/키워드: RFP(Request for Proposals)

검색결과 3건 처리시간 0.016초

공공정보화사업 제안요청서 품질분석 : 시스템 운영 개념을 중심으로 (Quality Analysis of the Request for Proposals of Public Information Systems Project : System Operational Concept)

  • 박상휘;김병초
    • 한국IT서비스학회지
    • /
    • 제18권2호
    • /
    • pp.37-54
    • /
    • 2019
  • The purpose of this study is to present an evaluation model to measure the clarification level of stakeholder requirements of public sector software projects in the Republic of Korea. We tried to grasp the quality of proposal request through evaluation model. It also examines the impact of the level of stakeholder requirements on the level of system requirements. To do this, we analyzed existing research models and related standards related to business requirements and stakeholder requirements, and constructed evaluation models for the system operation concept documents in the ISO/IEC/IEEE 29148. The system operation concept document is a document prepared by organizing the requirements of stakeholders in the organization and sharing the intention of the organization. The evaluation model proposed in this study focuses on evaluating whether the contents related to the system operation concept are faithfully written in the request for proposal. The evaluation items consisted of three items: 'organization status', 'desired changes', and 'operational constraints'. The sample extracted 217 RFPs in the national procurement system. As a result of the analysis, the evaluation model proved to be valid and the internal consistency was maintained. The level of system operation concept was very low, and it was also found to affect the quality of system requirements. It is more important to clearly write stakeholders' requirements than the functional requirements. we propose a news classification methods for sentiment analysis that is effective for bankruptcy prediction model.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

정보시스템 마스터플랜(ISMP) 수행 성과와 성공요인에 관한 사례연구 (A Case Study of the Performance and Success Factors of ISMP(Information Systems Master Plan))

  • 박소현;이국희;구본재;김민석
    • 경영정보학연구
    • /
    • 제14권1호
    • /
    • pp.85-103
    • /
    • 2012
  • ISMP는 정보시스템 구축 사업 제안요청서의 요구사항을 명확하게 작성하는 활동이다. 목표시스템 개념을 다소 피상적으로 기술하는 기존 제안요청서 작성 방식과는 달리, 관련 업무 및 정보기술 현황을 체계적으로 파악하고, 이용자 요구사항을 상세 분석하며, 제안요청서에 목표시스템의 기능 및 요건을 구체적으로 정의한다. 이처럼 제안요청서 명확성을 높임으로써 해당 사업의 규모 및 복잡도를 정확하게 산출할 수 있고, 여러 제안업체가 제시한 제안서를 공정하게 평가할 수 있다. 무엇보다 이 분야의 고질적 난제로 제기되는 문제, 즉, 갑과 을 사이의 오해와 갈등, 요구사항의 빈번한 변경, SW 개발자들의 과도한 업무 부담 등을 해결할 수 있다. 널리 보급된다면 장기적으로 SW 개발 생산성 및 IT 서비스 산업의 경쟁력 향상에 기여할 수 있다. 이 연구는 최초로 ISMP를 도입한 2개 시범사업을 대상으로 그 수행 내용, 수행 성과, 문제점 및 성공요인을 분석한 사례 연구이다. 실제 현장의 ISMP 수행 절차를 확인하고, 제안요청서의 요구사항을 어떻게 기술하는지를 살펴보았다. ISMP 제안요청서에 대한 만족도는 기존 제안요청서 방식에 비하여 발주기관과 수주업체에서 모두 높게 나타났다. ISMP에 대한 이해 및 수행 경험 부족으로 인하여 제안요청서 작성의 어려움, 업무 증가 부담 등과 같은 문제점도 발생하였지만, 전반적으로 목표시스템 범위 정립, 현업부서와 개발부서간 정보 공유 및 협력 증진, 발주기관과 수주업체 사이의 의사소통 원활, 요구사항 변경 감소 등 긍정적 효과가 발생하였다. 실무담당자 대상 실행연구(action research) 방식의 심층 인터뷰를 수행한 결과, ISMP 수행 성공요인으로서 ISMP 필요성에 대한 사전공감대 형성, CEO와 CIO의 지원에 의한 ISMP 수행 자원 확보, 요구사항 상세화 수준의 일관성있는 적용 등 3개 요인을 도출하였다. 이 사례연구 결과는 ISMP 도입을 계획하고 있는 발주기관과 IT서비스 업체에게 유용한 현장정보를 제공하며, IT서비스 경쟁력 분야 연구자들에게는 향후 연구방향에 대한 의미 있는 시사점을 제시할 것이다.

  • PDF