• Title/Summary/Keyword: RESTORATION PROJECT

Search Result 418, Processing Time 0.041 seconds

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

An Analysis of Landscape Change Factors on Restoration Project of Ecological Ridgeline using Landscape Adjectives -Focused on Frontal View- (경관형용사를 활용한 생태축 복원사업의 경관변화요인 분석 - 정면경관을 대상으로-)

  • Lee, Woo-Sung;Park, Yeong Dae;Kwon, Tae-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.1
    • /
    • pp.97-115
    • /
    • 2017
  • The purpose of this study is to evaluate the preference and image on landscape of before and after the restoration in the four study areas where the restoration project of Baekdudaegan ecological ridgeline was carried out and to explore the change factors of image preference according to restoration project. The study areas were Beoljae, Ihwaryeong, Bijoryeong, and Yuksimnyeong and 248 questionnaires were used for analysis. As a result of the recognition analysis on restoration project of ecological ridgeline, the awareness of the project was low at 2.63, the satisfaction of the project was 3.42, and necessity of the project was 4.07. In terms of the preference analysis for landscape photographs, the all preferences of four sites were improved after the project than before. In the result of the landscape image evaluation, images such as 'lifeless', 'uniform' and 'ugly' were high before the project, however, images such as 'clean', 'tidy', and 'stable' were high after the project. As a result of analyzing the change factors of image preference according to the restoration project, adjectives such as 'beautiful-ugly' and 'open-closed' influenced the preference change in common. These findings can be utilized as the base data for the planning direction for the construction of new ecological ridgeline or the landscape conservation of existing ecological ridgeline.

Evaluation indicators for the restoration of degraded urban ecosystems and the analysis of restoration performance (훼손된 도시생태계 생태복원 평가지표 제시 및 복원성과 분석)

  • Sohn, Hee-Jung;Kim, Do-Hee;Kim, Na-Yeong;Hong, Jin-Pyo;Song, Young-Keun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.6
    • /
    • pp.97-114
    • /
    • 2019
  • This study aims to analyze the effect of urban ecosystem restoration projects by evaluating the short-term restoration performance of the project sites, from both qualitative and quantitative evaluations. In this study, for the qualitative evaluation, we derived the evaluation frame from previous studies and literature. For the quantitative evaluation, the changes in ecological connectivity after the restoration project were described using landscape permeability and network analysis. In addition, changes in habitat quality after the restoration project were evaluated by using InVEST Habitat Quality Model. These evaluations were applied to the three natural madang (ecological restoration) projects and two ecosystem conservation cooperation projects. As a result, three categories, 10 indicators, and 13 sub-indicators were derived from literature as the evaluation frame for this study. In the case of quantitative evaluation of restoration performance, habitat quality increased by 45% and ecological connectivity by 37% in natural-madang, and habitat quality by about 12% and ecological connectivity by about 19% in ecosystem conservation cooperation projects. This implies that the ecological restoration project can increase the ecological connectivity and the habitat quality of degraded sites even in a short period of time by improving the land-cover and land use. The results by applying the evaluation frame indicated that ecological and environmental factors and the ecological functions were improved by the restoration works, even though the magnitude of performances were diverse depending on the specific evaluation items, project type, and site characteristics. This study clarified that the success of ecological restoration project should be assessed by both of the short-term and long-term goals, which can be achieved by the maintenance and sustainable management, respectively.

A Study on Recognition of Land Acquisition for Ecology Restoration Project in Ecological and Landscape Conservation Area of Donggang River Basin. (동강유역 생태·경관보전지역 내 매수토지 생태복원사업 인식도 연구)

  • Li, Lan;Koo, Bon-Hak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.4
    • /
    • pp.15-28
    • /
    • 2017
  • A protected area means a space designated and protected by law from development pressure and environmental pressure. It is mainly designated to protect specific ecosystems, natural landscapes, and cultural resources from irrational development (or damage), and involves policies of the public sector such as central and local governments. The United Nations Educational, Scientific and Cultural Organization (UNESCO) has conducted conservation and restoration projects for preserving natural ecosystems and genetic resources. In order to conserve the ecosystem in the protected area, national and public organizations purchase private land and use it ecologically; in addition, ecological restoration project is carried out for the purpose of creating waterside ecological belt or preserving ecosystem. Land acquisition refers to the land where highly influenced by the water quality and need to restore, and purchased by negotiating with the landlord. Although the nation and public institution carried out ecosystem restoration project for partial purchase land in order to conserve ecosystem, it is below the expected effect due to lack of comprehensive management system and have some problems in restoration project and unification of management institutions. Land acquisition in Donggang River Basin Ecological Conservation area is initiated in 2005 for creating income of local residents and ecological restoration. However, the lack of overall management and awareness resulted in poor vegetation growth and poor response by local residents due to terrain exposure. As such, there is insufficient research on the current situation and systematic integrated management although the number of land acquisition is increasing year after year. Futhermore, overall recognition and follow-up monitoring of eco-restoration are still inadequate. Therefore, the survey on the awareness of the purchase land ecosystem restoration project is necessary for the efficient restoration project and establishment of the management strategy for land acquisition in the future. Therefore, in this study, we provide fundamental materials on further research projects by carrying out research on the awareness of ecological restoration projects in the Donggang River basin ecological preservation area.

A Study on the Analysis of Factors for Landscape Architect Scheme Modification for the Restoration Project of Cheonggyecheon (청계천복원사업의 조경설계안 변경 요인 분석)

  • Kim, Yu-Ri;Yang, Byoung-E
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.5
    • /
    • pp.16-28
    • /
    • 2007
  • In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.

A Study on Influential Factors of Conflict Management of Government Policies in Oil Spill Sites -Focusing on the restoration project for oil pollution in Taean-gun (유류피해지역의 정부정책에 대한 갈등관리 영향요인에 관한 연구 -태안군 유류피해복원 사업을 중심으로-)

  • Jang, Young-Soo
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.63-78
    • /
    • 2011
  • This study looked into conflicts of government policies for oil spill sites which are focusing on Taean-gun after the oil spill in Taean-gun and examined the effects on the conflicts. There are lots of conflicts on the on-going restoration project of fishing ground environment(fishing ground inspection, restoration program development, improvement in fishery biology ecosystem and fishery productivity). For example, these show diverse conflicts between business associates, project processes, business subjects, project participation, and the use of fishing ground. This study found out the first reason of dissatisfaction and conflicts is that there is a difference between groups in terms of political aims and perception. Secondly, lack of communication and cooperation between the center and the provinces, organizations in the provinces, the local government and fishing village cooperatives, fishermen in the fishing industry. Thirdly, the local government and the fishing village head don't show their leadership to improve project performance.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.6
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF