• Title/Summary/Keyword: Qualification Test

Search Result 470, Processing Time 0.021 seconds

The Result in Quality Management Activity of Propellant and Compressed Gases during the Operation of KSLV-I (KSLV-I 운용에서의 추진제 및 고압가스 품질관리 활동 결과)

  • Jung, Young-Suk;Kang, Sun-Il;Oh, Seung-Hyub;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.10 no.2
    • /
    • pp.133-145
    • /
    • 2011
  • This paper is about the results in Qualification Management activity performed between the Autonomous Test(AT) season(August. 2008) of Launch Complex and the 2nd flight test season(June. 10, 2010) of KSLV-I. All cryogenic fluids(LOX, $LN_2$) and compressed gases(Air, $GN_2$, GHe) were qualified by qualification management activity during AT(Autonmous Test), QT(Qualification Test) season for LP(Launch Pad) and LVAB(Launch Vehicle Assembly Building) and FT(Flight Test) season of KLSV-I. As the results, total 428 times of check analysis and 111 times of full analysis were performed.

A Study on the Effects of National Technical Qualification System Innovation on Companies' Decision on Employment: Focused on Course-base Qualification (국가기술자격제도의 혁신이 기업의 고용결정에 미치는 영향에 관한 연구: 과정평가형 자격을 중심으로)

  • Jang, Seok-Keun;Bong, Kang Ho;Park, Jaemin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.11
    • /
    • pp.278-286
    • /
    • 2018
  • The existing test-based qualification system does not sufficiently reflect the demand for skills in industries and there exist concerns regarding its efficacy. In response, an innovative national technical qualification system, which uses a course-based qualification system, has been introduced to supplement the test-type qualification system. This study investigates the impact of the national technical qualification system on companies' decisions concerning employment by analyzing survey data from companies that employed persons who obtained course-based qualifications. Analysis results found the degree of company demand for skills had a positive impact on overall employment decisions. Especially, it was highly likely for those companies that experienced loss due to the lack of technology in the past to decide continued employment and expansion of employment. This suggests that it is necessary to design the national technical qualification system in response to the demand for technological skills of each industry in the future.

A Study on Test Working of Signalling System (신호시스템 시운전 시험 연구)

  • 정의진;황종규;이종우
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.157-163
    • /
    • 2000
  • Testing evaluation is a part of process for design, production, evaluation, operation and abolition, and is the process of certifying system performance. The main purpose of testing evaluation is to reduce the risk factor under the determining process. Testing process has the three step such as design qualification, integration and validation test in factory, system integration and commissioning test. Design Qualification is to verify errors on the design process. Integration and validation test in factory is for the H/W and S/W of an equipment and is to verify interface of subsystem, communication protocol and main functions. System integration and commissioning test is a functional test to adjust successful installation of equipment. According to the testing process, briefly consideration for test item, test method and test contents about signalling system is carried out.

  • PDF

A Study on Improvement Plan of Evaluation Method in National Technical Qualification Exam focus on Information Processing Fields based on NCS (NCS 기반 정보처리 분야 국가기술자격 실기시험 평가방법에 관한 연구)

  • Cho, Yong-dae;Moon, Hee-kwon;Yoo, Ju-yeon;So, Kee-ho;Park, Kye-young;Lee, Seok-cheol
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.6
    • /
    • pp.1277-1282
    • /
    • 2015
  • This paper describes a research for improvement official approval of information processing in national technical qualification. In this paper, we analysis the contents of current exams and propose the new evaluation method of practical exam in information processing fields through grafting new trends of ICT and ability unit, fulfillment criteria in national competency standards(NCS). Also, we have verified the effect of exam through the pilot test. In the future, we will apply the new exams after the revision of guidelines for marking questions by expert group in its duty fields basis on this research

A Study on the Improvements of Qualification Items for Electronic Commerce Manager (전자상거래관리사 출제기준에 대한 개선방안 연구)

  • Cho, Se-Hyung;Lee, Jae-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.2
    • /
    • pp.47-74
    • /
    • 2007
  • This research purpose to improve the qualification items for electronic commerce manager. Former qualification system for the electronic commerce manager was executed 11 times from year 2000 to 2005. To improve the standard for test questions and contents of qualification items, we reviewed literatures about job analysis for electronic commerce manager, electronic commerce curriculum, e-Business market and other countries' similar qualification systems and items. We also analysed the job related knowledge, skill, and abilities using job analysis by DACUM method, subject matter experts interview and workshop committee for development and validation of qualification items. Based on the results of job analysis and DACUM workshop, we derived a job model for electronic commerce manager and then validated it through field survey and additional expert review. Finally we developed and suggested an alternated qualification items using matrix analysis between categorized job knowledge and job tasks.

  • PDF

Reliability Qualification Test of a Unmanned Control Robot System for an Excavator (굴삭기용 무인조종로봇 신뢰성 보증 시험에 대한 연구)

  • Back, Seung Jun;Son, Young Kap;Kim, Jun Hee;Lee, Jong Cheol
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.4
    • /
    • pp.397-403
    • /
    • 2015
  • This paper proposes the development of a method for assessing the system reliability of an unmanned control robot system for an excavator. It then shows the results of the reliability qualification test based on the proposed method. The robot system functions to ensure the safety of the workers who control excavators in dangerous working environments, and the system reliability was calculated by integrating the reliabilities of the system components. Thus, test equipment for the three key units of the robot system were constructed and used in accelerated life testing. From the life testing results, guaranteed mean time between failures for the chosen confidence level was estimated, and the reliability qualification testing method of the robot system using small sample sizes was proposed.

A Study on Ka band Qualification Model Multiplexers for Communication, Ocean and Meteorological Satellite (COMS) Payload (통신해양기상위성 Ka 대역 인증모델 밀티플렉서에 대한 연구)

  • Eom, Man-Seok;An, Gi-Beom;Yun, So-Hyeon;Gwak, Chang-Su;Yeom, In-Bok
    • Journal of Satellite, Information and Communications
    • /
    • v.1 no.2
    • /
    • pp.63-70
    • /
    • 2006
  • This paper presents the results of Ka band qualification model multiplexers for COMS Payload to be launched in 2008. These are the input and output multiplexers of the satellite transponder to use available frequency resources effectively and the diplexer of the satellite antenna to use the same reflector for both transmitting and receiving frequency bands, respectively. The input multiplexer with four frequency channels has four(4) independent channel filters which consist of an 8-pole elliptic band-pass filter for high frequency selectivity and a 2-pole equalizer for group delay equalization. For low insertion loss, mass and volume reduction, manifold type os employed for output multiplexer. E-plane T-junction is used for either splitting or combining a frequency band into two sub-bands. Asymmetric inductive irises are used to tune the receiving filter easily. The electrical performance and environmental test such as vibration test, mechanical shock test, thermal vacuum test and EMC test are performed and the results of all qualification model multiplexers are compliant to the requirement of each multiplexer. Followed by this qualification, the flight model equipment will be developed.

  • PDF

An NCS-based Evaluation Method of National Technical Qualification Examination in Electronics Fields (NCS 기반 전자분야 국가기술자격 실기시험 평가방법)

  • Lee, Seok-cheol;Seo, Jeongwook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.659-660
    • /
    • 2016
  • This paper presents an improved evaluation method, based on National Competency Standards (NCS), of National Technical Qualification (NTQ) examination in Electronics Fields such as Craftsman Computer, Industrial Engineer Computer Maintenance Control, Engineer Computer System Application, Engineer Computer, Engineer Embedded) to reflect practical vocational abilities and raise values of NTQ certificates. To evaluate each NTQ examination, we carefully chose corresponding NCS competency units for practical performance test, written subjective test, and mixed test through the advisory committee with industry, education, and qualification experts. In addition, we verified useful effects of the NCS-based evaluation method by performing and analyzing the simulated tests. We used both single and mixed problems in practical performance test and new problems about system design and implementation based on various working scenarios in written subjective test.

  • PDF

Seismic qualification using the updated finite element model of structures

  • Sinha, Jyoti K.;Rao, A. Rama;Sinha, R.K.
    • Structural Engineering and Mechanics
    • /
    • v.19 no.1
    • /
    • pp.97-106
    • /
    • 2005
  • The standard practice is to seismically qualify the safety related equipment and structural components used in the nuclear power plants. Among several qualification approaches the qualification by the analysis using finite element (FE) method is the most common approach used in practice. However the predictions by the FE model for a structure is known to show significant deviations from the dynamic behaviour of 'as installed' structure in many cases. Considering such limitation, few researchers have advocated re-qualification of such structures after installation at site to enhance the confidence in qualification vis-$\grave{a}$-vis plant safety. For such an exercise the validation of FE model with experimental modal data is important. A validated FE model can be obtained by the Model Updating methods in conjugation with the in-situ experimental modal data. Such a model can then be used for qualification. Seismic analysis using the updated FE model and its advantage has been presented through an example of an in-core component - a perforated horizontal tube of a nuclear reactor.

Analysis on Activation Energy Measurement and Application of Nuclear Equipment Non-metallic Materials (원전기기 비금속재료의 활성화에너지 측정 및 적용성 분석)

  • Bhang, Keug-Jin;Hong, Jun-Hee
    • Journal of Power System Engineering
    • /
    • v.20 no.4
    • /
    • pp.38-43
    • /
    • 2016
  • Safety-related equipments of Nuclear Power Plants(NPP) have to perform environmental qualification test in accordance with IEEE-323 standards. However, non-metallic materials replace new one regularly instead of the test because they are considered as consumable parts. In this study, the seven kinds of non-metallic materials are selected and their activation energy was experimentally evaluated with uncertainty analysis by using thermogravimetric analyzer(TGA). In order to obtain activation energy of non-metallic materials, mass difference, temperature raising rate and conversion rate on the specimen are analyzed. It is postulated that the three experiment conditions are important to get a reliable activation energy. This postulate was experimentally confirmed using Arrhenius equation and Flynn-Wall-Ozawa analysis.