• Title/Summary/Keyword: Pumping station

Search Result 133, Processing Time 0.029 seconds

Optimal Design of Hydraulic Device at the Seobyun Pumping Station using Genetic Algorithm (유전자 알고리즘을 이용한 서변 가압장 수리구조물의 최적설계)

  • Jeong, Bong-Seok;Kim, Ju-In;Kim, Sang-Hyeon;Park, Nam-Sik
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.3
    • /
    • pp.289-298
    • /
    • 2000
  • In order to minimize the impact of water hammer In a pipeline, a determination of optimum position of hydraulic structures with best operation of pressure relief valve was explored at the Seobyun pumping station. Method of characteristics is used to simulate a surge impact originating from abrupt stop of pumping operation in a pipeline. Genetic algorithm shows a powerful capability in searching a global solution, especially for a nonlinear problem The application results suggests that the maximum positive pressure can be relaxed by decreasing the opening time of pressure relief valve, meanwhile the maximum negative pressure can be relaxed by increasing the opening time of pressure relief valve. This study shows that the integration of a genetic algorithm with a transient analysis technique such as method of characteristic can improve the design of hydraulic structure in a pipe network.

  • PDF

Removal of Malodorous Gases Emitted from a Wastewater Pumping Stations by Biological Methods (생물학적 방법에 의한 하수 중계펌프장의 악취제거)

  • 류희욱
    • Microbiology and Biotechnology Letters
    • /
    • v.32 no.3
    • /
    • pp.265-270
    • /
    • 2004
  • To select a promising technologies for removal of odorous gases emitted from a wastewater pump station, four methods such as activated carbon (A/C) adsorption, chemical absorption (acid and alkali scrubber), and two biofilters (polyurethane (PU) and worm cast) were investigated. The average odor removal efficiencies in the PU biofilter and A/C column was over 98%, but in a worm cast biofilter and chemical absorption were below 60-80%. The removal efficiency of PU biofilter was very stable (about 98-99%) in the range of retention times of 4-36s, and a maximum elimination capacity was $1.6${\times}$10^{ 7}$ $OUm^{-3}$$h^{-1}$ Deodorization costs for an activated carbon adsorption and a biofiltration method were investigated. With increasing odor intensity, the operating cost of the A/C column increased linearly, but the operating cost of the biofilteration increased slightly. The capital cost in a biofilter is about two times higher than that in an A/C column, but the operating cost is very lower than that of in A/C column. In conclusion, the biofiltration was evaluated one of the most promising technologies to control odor in a wastewater pump station.

Water Balance in a Paddy Field with Pumping Irrigation System (양수장 용수공급 논 지대의 물수지)

  • 정운태;이근후;이인영
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.1-7
    • /
    • 1998
  • To investigate the water balance in a paddy rice field with the pumping station for irrigation water supply, flow measurements and analysis on various components of water balance were carried out. The investigated area is 103.7 ha, and the irrigation water was supplied for 102 days during the total irrigation period starting from June 1. It was found that the consumption rate was increased as the growing stage was progressed. The variation of evapotranspiration rate was shown same tendency as the consumption rate, while no apparent tendency was found in infiltration rate upon different growing stages. And the ground water input to the area was predominant during the early stage of growing period, while ground water output from the study area was predominant at the end of the growing stage. The range of return flow rate, the ratio of total outflow to total inflow in every decad, was 57.6 to 85.7%. These values are slightly higher than reported values from the other investigation projects.

  • PDF

Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures (논문 - 수리시설물의 적정개보수 주기 및 비용 산정)

  • Lee, Joon-Gu;Kim, Myong-Won;Shin, Tae-Ho
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

Optimal Operation of Pumping System Connected with Reservoir Systems (저수지 시스템과 연계된 펌핑 시스템의 최적 운영)

  • Lee, Gwang-Man;Lee, U-Seok;Yu, Yang-Su
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.2
    • /
    • pp.107-118
    • /
    • 1997
  • The Upper Fenhe Reservoir System studied by KOWACO to supply water to Taiyuan City, capital of Shanxi Province in China, is a very complicated one. Many reservoirs will be connected serially and it will be operated as a multi-purpose and multi-criteria system because several objectives and appraisal functions are taken into account regarding system operation. For reservoirs in the system, the critical system operation objectives are to minimize water shortage and reservoir sediment. Furthermore the reservoir system will be jointed with a large-scale pumping system, namely Yellow River Diversion Project. The water development cost in the Yellow River Diversion Project is much higher than that of reservoir system, and around the year 2020 the diversion volume will be twice of the surface water available in the Upper Fenhe Basin. In this study, an optimization technique for connecting the system of reservoirs and pumping station was developed to solve a conjunctive low River Diversion Project. The developed scheme includes a suggestion on the combining methodology of real reservoir system and pumping system using imaginary reservoir concept for the Yellow River Diversion Project, and practical examples to the minimization problem of the Yellow River diversion satisfying other reservoir operation objectives.

  • PDF

Development of Evaluation Model of Pumping and Drainage Station Using Performance Degradation Factors (농업기반시설물 양·배수장의 성능저하 요인분석 및 성능평가 모델 개발)

  • Lee, Jonghyuk;Lee, Sangik;Jeong, Youngjoon;Lee, Jemyung;Yoon, Seongsoo;Park, Jinseon;Lee, Byeongjoon;Lee, Joongu;Choi, Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.4
    • /
    • pp.75-86
    • /
    • 2019
  • Recently, natural disasters due to abnormal climates are frequently outbreaking, and there is rapid increase of damage to aged agricultural infrastructure. As agricultural infrastructure facilities are in contact with water throughout the year and the number of them is significant, it is important to build a maintenance management system. Especially, the current maintenance management system of pumping and drainage stations among the agricultural facilities has the limit of lack of objectivity and management personnel. The purpose of this study is to develop a performance evaluation model using the factors related to performance degradation of pumping and drainage facilities and to predict the performance of the facilities in response to climate change. In this study, we focused on the pumping and drainage stations belonging to each climatic zone separated by the Korea geographical climatic classification system. The performance evaluation model was developed using three different statistical models of POLS, RE, and LASSO. As the result of analysis of statistical models, LASSO was selected for the performance evaluation model as it solved the multicollinearity problem between variables, and showed the smallest MSE. To predict the performance degradation due to climate change, the climate change response variables were classified into three categories: climate exposure, sensitivity, and adaptive capacity. The performance degradation prediction was performed at each facility using the developed performance evaluation model and the climate change response variables.

A Study on Return Flow Ratio of Irrigation for a Paddy Field in Pumping Station by Water Balance Method (물수지분석 기법에 의한 양수장 몽리구역내 농업용수 회귀율 연구)

  • Choo, Tai-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.3
    • /
    • pp.249-255
    • /
    • 2004
  • To investigate the return flow ratio of irrigation water, lots of observations were made during the irrigation periods in 2003 crop year. This Area is a portion of Dae-Am pumping station basin which is located in Changryung-gun, Gyeongnam province. A water balance analysis was performed for a paddy field in Dae-Am pumping station in the Nakdong river basin, which is constructed for irrigation water supply. Daily rainfall data in the this area were collected and irrigation water flow rate, drainage water flow rate, infiltration and evaportranspiration were measured in field area. Irrigation water flow rate and drainage water flow rate were continuously observed by water level logger(GTDL-L10) during the growing season. The infiltration and evaportranspiration were measured by cylindrical 300mm depletion meter and cylindrical 200mm infiltrometer, respectively. Total irrigation and drainage flows were 654.7mm and 281.2mm in 2003. Total infiltration and evaportranspiration were 36.0mm and 160.0mm respectively. The mean of the daily evaportranspiration rate was 4.3mmm/d. The prompt return flow and retard return flow ratio were 43.0% and 5.5%, respectively. Total return flow ratio was 48.5%. Therefore, it can be concluded that the amount of irrigation water was much higher than design standard or reference in this study. It means that this was caused by the inadequate water management practice in the area where water was oversupplied on farmers' request rather than following sound water management principles, and design standard should be changed in the future.

Nutrient Balance in the Paddy Fields Watershed with a Source of River Water (하천관개지역 광역논에서의 영양물질의 물질수지)

  • Lee, Jeong Beom;Lee, Jae Yong;Li, Si Hong;Jang, Jeong Ryeol;Jang, Ik Geun;Kim, Jin Soo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.5
    • /
    • pp.11-19
    • /
    • 2014
  • The objective of this research was to investigate concentration and load of nutrients such as total nitrogen (TN), nitrate nitrogen ($NO_3$-N) total phosphorous (TP), and phosphate phosphorous ($PO_4$-P) in a 23.4-ha paddy fields watershed with river water source. Water samples for irrigation water, drainage water, ponded water and groundwater were collected, and irrigation and drainage water were measured at 5~10 day intervals during normal days and at 2~6 hours intervals during three storm events. The amount of irrigation water in the study area was over 2,000 mm, which is almost identical to that in the area irrigated from a large reservoir but much more than that in the area irrigated from a pumping station. Mean flow-weighted concentrations of TN and TP in irrigation water were 2.8 and 0.15 mg/L, respectively, higher than those in the area irrigated from a large reservoir or a pumping station. The ratios of irrigation load to total inflow load for TN and TP were 88 %, and the ratios of surface outflow load to total outflow load for TN and TP were over 90 %, indicating that total nutrient load may be greatly affected by water management. The nutrient loads per area in the study area were estimated as TN 21.1 kg/ha and TP 1.1 kg/ha. Especially, the TP load per area in the study area was smaller than that in the area irrigated from a large reservoir or a pumping station. This may be because outflow load is not high likely due to sedimentation of particulate P and irrigation water load is high due to high TP concentration in irrigation water and high amount of irrigation water.

Stress and strain behavior investigation on a scale model geotextile tube for Saemangeum dike project

  • Kim, Hyeong-Joo;Lee, Kwang-Hyung;Jo, Sung-Kyeong;Jamin, Jay C.
    • Ocean Systems Engineering
    • /
    • v.4 no.4
    • /
    • pp.309-325
    • /
    • 2014
  • Geotextile tubes are basically a huge sack filled with sand or dredged soil. Geotextile tubes are made of permeable woven or non-woven synthetic fibers (i.e., polyester or PET and polypropylene or PP). The geotextile tubes' performances in strength, dewatering, retaining solid particles and stacked stability have been studied extensively in the past. However, only little research has been done in the observation of the deformation behavior of geotextile tubes. In this paper, a large-scale apparatus for geotextile tube experiment is introduced. The apparatus is equipped with a slurry mixing station, pumping and delivery station, an observation station and a data station. For this study the large-scale apparatus was utilized in the studies regarding the stresses on the geotextile and the deformation behavior of the geotextile tube. Model tests were conducted using a custom-made woven geotextile tubes. Load cells placed at the inner belly of the geotextile tube to monitor the total soil pressure. Strain gauges were also placed on the outer skin of the tube to measure the geotextile strain. The pressure and strain sensors are attached to a data logger that sends the collected data to a desktop computer. The experiment results showed that the maximum geotextile strain occurs at the sides of the tube and the soil pressure distribution varies at each geotextile tube section.

A Study on the Application of High Voltage Inverter System(6.6kV) at Large Pumping Station (대형펌프장 고압(6.6kV) 인버터 적용방안 연구)

  • Kim, Tea-Og;Kang, Kyong-Eun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1171-1172
    • /
    • 2011
  • 본 논문에서는 대형펌프장 펌프 소비동력을 절감하고 효율적인 펌프설비 운영을 하기위하여 펌프설비의 설계용량 보다 저유량을 공급시에 현재의 밸브 교축운전으로 인한 강제유량조절 운영방식과 펌프의 회전수를 낮추고 밸브에 발생되는 손실수두룰 최소화 할 수 있는 인버터시스템 운영방식을 비교하여 에너지절감 및 효율적인 운영방법을 연구분석 하였다.

  • PDF