• Title/Summary/Keyword: Pumping Rate

Search Result 377, Processing Time 0.031 seconds

Laboratory Simulation of Formation, prevention and breaking of Water-in-oil Emulsion (수분함유 기름 에멀젼의 형성경향, 생성방해 및 파괴에 관한 실험적 예측)

  • 강성현;오재룡
    • 한국해양학회지
    • /
    • v.26 no.4
    • /
    • pp.324-331
    • /
    • 1991
  • Laboratory experiments were undertaken in mixing chamber to study the water-in-oil emulsion formation tendency, stability and formation rate of 16 crude oils. Arabian, Iran, Dubai, Isthmus and Daekyung crudes showed high emulsion formation tendency and had water contents of 80-90%. Emulsions of crude oils of middle East were very stable, while Isthmus and Daekyung sudes formed unstable emulsion. Emulsion formation tendency rate, and stability showed significant correlations with asphaltene content of crude oil. To evaluate the possibility of preventing mousse formation, inhibition ability of several dispersants and demulsifier was tested. They inhibited mousse formation at 0.1-0.2% concentrations (v/v). Emulsion inhibition by chemical treatment delayed the time of formation, but did not decrease water content. Demulsifying ability of dispersants and demulsifier was tested because biscous emulsion causes formidable problems in skimming, pumping and recovery operation. British demulsifier Alcohol 0 showed excellent emulsion breaking efficiency at 0.1% of emulsion Vol..

  • PDF

A study on the peristaltic waveform of valveless PZT pump using disk type multi PZTs (다수 개 디스크 PZT 를 이용한 밸브리스 압전펌프의 연동구동 파형에 관한 연구)

  • Ham Y.B.;Park J.H.;Yun D.H.;Kim H.S.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1824-1827
    • /
    • 2005
  • For application to micro fluid control systems such as ${\mu}TAS$ (Micro Total Analysis Systems) and DDS (Drug Delivery Systems), it is very significant to handle precise and minute flow rates with low pressure pulsation. In this study, a novel valveless piezoelectric pump using peristaltic motion with three disk type PZT actuators is presented. The newly devised pump with an effective size of $70mm{\times}60mm{\times}55mm$ has three actuator layers connected in series from inlet to outlet. The PZT actuator has a maximum displacement of 240 ${\mu}m$ and a maximum force of 1.6 N. When the driving voltage for PZT actuators is sequentially applied with a certain phase shift, the pumping is performed by peristaltic motion of liquid volume. The working fluid is shut off without the driving voltage. Three methods for sequential driving are proposed and experimentally investigated. First and second methods utilize an intermittent sinusoidal waveform with phase shift of $90{\circ}\;and\;120^{\circ}$, respectively. Third method uses a rectangular waveform with phase shift of $90^{\circ}$. A controller with multi-phase shifter is designed and fabricated. Then, frequency and voltage-flow rate characteristics and load pressure-flow rate characteristics are experimentally investigated to verify the validity of the developed pump.

  • PDF

Evaluation of Reverse Electrodialysis System with Various Compositions of Natural Resources (다양한 농도 공급원의 조합을 통한 역전기투석 장치의 성능 평가)

  • Kwon, Kilsung;Park, Byung Ho;Kim, Dukhan;Kim, Daejoong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.6
    • /
    • pp.513-518
    • /
    • 2015
  • Salinity gradient power (SGP) has attracted significant attention because of its high potential. In this study, we evaluate reverse electrodialysis (RED) with various compositions of available resources. The polarization curve (I-V characteristics) shows linear behavior, and therefore the power density curve has a parabolic shape. We measure the power density with varying compartment thicknesses and inlet flow rates. The gross power density increases with decreasing compartment thickness and increasing flow rate. The net power density, which is the gross power density minus the pumping power, has a maximum value at a compartment thickness of 0.2 mm and an inlet flow rate of 22.5 mL/min. The power density in RED is also evaluated with compositions of desalination brines, seawater, river water, wastewater, and brackish water. A maximum power density of $1.75W/m^2$ is obtained when brine discharged from forward osmosis (FO) and river water are used as the concentrated and the diluted solutions, respectively.

A Study on Hydrogeologic, Hydrodispersive Characterization and Groundwater Contamination Assessment of an H-site (H 연구지역의 수리지질-수리분산특성과 지하수 오염가능성 평가연구)

  • Hahn, Jeongsang
    • Economic and Environmental Geology
    • /
    • v.27 no.3
    • /
    • pp.295-311
    • /
    • 1994
  • A comprehensive in-situ tests are performed to define the hydrogeologic and hydrodispersive characteristics such as hydraulic conductivities, longitudinal dispersivity, and average linear velocities as well as conducting flow-net analysis at the study area. The results show that the study area is very heterogeneous so that hydraulic conductivities range from $6.45{\times}10^{-7}$ to $1.15{\times}10^{-5}m/s$ with average linear velocities of 0.34~0.62m/day. Whole groundwater in upper-most aquifer is discharging into the sea with specific discharge rate of $7.2{\times}10^{-3}$ to $1.3{\times}10^{-2}m/day$. The longitudinal dispersivity of the aquifer is estimated about 4.8m through In-situ injection phase test. The area is highly vulnerable to potential contaminant sources due to it's high value of DRASTIC index ranging from 139 to 155 and also under water table condition with very shallow groundwater level. To delineate contaminant plumes of toxic NaOH and carcinogenic benzene when these substances are assumed to be leaked through existing TSDF at the study area by unexpected accidents or spill, Aquifer Simulation Model (ASM) including Flow and Transport Model is used. Te simulated results reveal that the size of NaOH plume after 5 years continuous leak is about $250{\times}100m$ and benzene after 10 years, $490{\times}100m$. When the groundwater is abstracted about 50 days, which is maximum continuously sustained no-precipitation period during 30 years, with pumping rate of $100m^3/day$, THWELL program shows that the groundwater is adversly affected by sea water intrusion.

  • PDF

A Study on the Practical Operation of a Farm-scale Two-phase Anaerobic Digester for the Treatment of Swine Manure (돼지분뇨 처리를 위한 Farm-scale Two-phase Anaerobic Digester의 실증운영에 관한 연구)

  • 백인규;이상락;안정제;권윤정;맹원재
    • Journal of Animal Environmental Science
    • /
    • v.6 no.2
    • /
    • pp.73-81
    • /
    • 2000
  • A two-phase anaerobic digestion system for the treatment of swine waste was constructed in a commercial hog farm. The digester system was composed of 4 major units; slurry storage pit, acidogenic digester, methanogenic digester and sedimentation pit. A biogas boiler unit was also attached to maintain the digester temperature of 37$^{\circ}C$. Substrate lading was made with 2hr-interval by pumping about 2.1$m^3$ of slurry type swine waste from the slurry pit into the acidogenic digester, which corresponds to hydraulic retention time of 4 days for the acidogenic digester and of 11 days for the methanogenic digester. Digester temperature were well maintained as the set temperature of 37$^{\circ}C$ in the methanogenic digester, while the temperature in the acidogenic digester showed around 34$^{\circ}C$. pH also showed a steady-state results of 7.3 in the acidogenic digester and of 7.6 in the methanogenic digester during the operation period. Average biogas production rate was 0.66$m^3$/$m^3$ digester volume. Reduction rate of total solid and volatile solid were 42.8% and 5.8%, respectively. Total nitrogen and ammonia nitrogen were not reduced during the anaerobic fermentation, however, most of VFAs seemed to be converted to the biogas,. These fermentation performance data may suggest that he newly developed a two-phase anaerobic digester for the swine waste treatment worked so successfully.

  • PDF

Stress field interference of hydraulic fractures in layered formation

  • Zhu, Haiyan;Zhang, Xudong;Guo, Jianchun;Xu, Yaqin;Chen, Li;Yuan, Shuhang;Wang, Yonghui;Huang, Jingya
    • Geomechanics and Engineering
    • /
    • v.9 no.5
    • /
    • pp.645-667
    • /
    • 2015
  • Single treatment and staged treatments in vertical wells are widely applied in sandstone and mudstone thin interbedded (SMTI) reservoir to stimulate the reservoir. The keys and difficulties of stimulating this category of formations are to avoid hydraulic fracture propagating through the interface between shale and sand as well as control the fracture height. In this paper, the cohesive zone method was utilized to build the 3-dimensional fracture dynamic propagation model in shale and sand interbedded formation based on the cohesive damage element. Staged treatments and single treatment were simulated by single fracture propagation model and double fractures propagation model respectively. Study on the changes of fracture vicinity stress field during propagation is to compare and analyze the parameters which influence the interfacial induced stresses between two different fracturing methods. As a result, we can prejudge how difficult it is that the fracture propagates along its height direction. The induced stress increases as the pumping rate increasing and it changes as a parabolic function of the fluid viscosity. The optimized pump rate is $4.8m^3/min$ and fluid viscosity is $0.1Pa{\cdot}s$ to avoid the over extending of hydraulic fracture in height direction. The simulation outcomes were applied in the field to optimize the treatment parameters and the staged treatments was suggested to get a better production than single treatment.

A Study on Typical Rates of Water-use for Primary School, Middle School and High School Facilities (초.중.고등학교 시설의 급수 사용량에 대한 연구)

  • Kim, Kyu-Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.12
    • /
    • pp.802-807
    • /
    • 2008
  • A Study on Typical Rates of Water-use for School Facilities has been carried out in this work. Water supply system is given much weight in school facilities. Therefore, it set up a basis efficiency using of water sources to calculate typical rates of water use. The results are summarized as follows; 1) On the whole, typical rates of water-use was founded out 15 L/stu. d in pirmary school, 10 L/stu. d in middle school and 30 L/stu. d in high school smaller than the existing it. It was rate of water-use change as season and Max. Rates of water-use was July. 2) I deem that school hours are 5 hour's in primary school, 7 hour's in middle school and 8 hour's in high school. It the concept of 1 hour that is lesson time 40 minutes and resting time 10 minutes in primary school, lesson time 45 minutes and resting time 10 minutes in middle school and lesson time 50 minutes and resting time 10 minutes in high school. 3) It is desired that we calculate the volume of pump and water tank throughout this concept and the size of water tank should be 1.5 times with taking peak load into consideration by this study on typical rate of water-use. 4) The amount of using water increases in gradually and I consider the life cycle of facilities is more than 10 years. As a result, I can forecast that the size will be insufficiency but I deem that if we devise a plan about parallel pumping on water tank space, we can cope with it. Also, it is expected that we can cut back the transport energy by controlling pump volume.

A Study on Typical Rates of Water-use for Primary School, Middle School and High School Facilities (초.중.고등학교 시설의 급수 사용량에 대한 연구)

  • Kim, Kyu-Saeng
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.510-515
    • /
    • 2007
  • A Study on Typical Rates of Water-use for School Facilities has been carried out in this work. Water supply system is given much weight in school facilities. Therefore, it set up a basis efficiency using of water sources to calculate typical rates of water use. The results are summarized as follows ; 1) On the whole, typical rates of water-use was founded out 15 L / stu. d in pirmary school, 10 L / stu. d in middle school and 30L / stu. d in high school smaller than the existing it. It was rate of water-use change as season and Max. Rates of water-use was July. 2) I deem that school hours are 5 hour's in primary school, 7 hour's in middle school and 8 hour's in high school. It the concept of 1 hour that is lesson time 40 minutes and resting time 10 minutes in primary school, lesson time 45 minutes and resting time 10 minutes in middle school and lesson time 50 minutes and resting time 10 minutes in high school. 3) It is desired that we calculate the volume of pump and water tank throughout this concept and the size of water tank should be 1.5 times with taking pick load into consideration by this study on typical rate of water-use. 4) The amount of using water increases in gradually and I consider the life cycle of facilities is more than 10 years. As a result, I can forecast that the size will be insufficiency but I deem that if we devise a plan about parallel pumping on water tank space, we can cope with it. Also, it is expected that we can cut back the transport energy by controlling pump volume.

  • PDF

Influence of Body Size and Ambient Temperature on the Uptake Rate of Cd, Se, and Zn in the California Mussel, Mytilus californianus (개체 크기와 온도가 홍합(Mytilus californianus)의 금속 흡수율에 미치는 영향)

  • Lee Jung-Suk;Lee Byeong-Gweon;Lee In-Tae
    • Korean Journal of Environmental Biology
    • /
    • v.22 no.3
    • /
    • pp.438-445
    • /
    • 2004
  • A radiotracer study was conducted to evaluate the influence of body size and temperature on the uptake rates of Cd, Se and Zn in the California mussel, Mytilus californianus. Uptake rates of Cd, Se and Zn were determined simultaneously with clearance of the mussels with 3 different size classes (0.07, 0.24 and 0.73 g flesh dry weight $individual^{-1})$ and at 4 different temperatures (3, 8, 13 and $21^\circ{C})$. The weight-specific uptake rates of 3 elements significantly decreased with body size, but increased with temperature. Simultaneously measured clearance rates of mussels were closely associated with metal uptake rates. The significant association of clearance rates and metal uptake rates of mussels emphasizes the importance of functional role of water pumping activity in the metal uptake process in filter-feeding organisms.

Groundwater Recharge and Discharge in the Urban-rural Composite Area (도농복합지역 지하수 함양과 배출에 대한 연구)

  • Lee, Byung-Sun;Hong, Sung-Woo;Kang, Hee-Jun;Lee, Ji-Seong;Yun, Seong-Taek;Nam, Kyoung-Phile
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.2
    • /
    • pp.37-46
    • /
    • 2012
  • This study was conducted to identify groundwater recharge and discharge amounts of a representative urban-rural composite area located in Yongin city, Kyounggi-do, Korea. Groundwater recharge would be affected by mainly two processes in the study area: rainfall and leakage from public water pipelines including water-supply and sewage system. Groundwater recharge rate was estimated to be 13.5% by applying annual groundwater level data from two National Groundwater Monitoring Stations to the master regression curve method. Subsequently, the recharge amounts were determined to be $13,253{\times}10^3m^3/yr$. Leakage amounts from water-supply and sewage system were estimated to be $3,218{\times}10^3$ and $5,696{\times}10^3m^3/yr$, respectively. On the whole, a total of the recharge amounts was $22,167{\times}10^3m^3/yr$, of which 60% covers rainfall recharge and 40% pipeline leakage. Groundwater discharge occurred through three processes in the composite area: baseflow, well pumping, and discharge from urban infrastructure including groundwater infiltration into sewage pipeline and artificial extraction of groundwater to protect underground facilities from submergence. Discharge amounts by baseflow flowing to the Kiheung agricultural reservoir and well pumping were estimated to be $382{\times}10^3$ and $1,323{\times}10^3m^3/yr$, respectively. Occurrence of groundwater infiltration into sewage pipeline was rarely identified. Groundwater extraction amounts from the Bundang subway line as an underground facility were identified as $714{\times}10^3m^3/yr$. Overall, a total of the discharge amounts was determined to be $2,419{\times}10^3m^3/yr$, which was contributed by 29% of artificial discharge. Even though groundwater budget of the composite area was identified to be a surplus, it should be managed for a sound groundwater environment by changing deteriorated pipelines and controlling artificial discharge amounts.