• 제목/요약/키워드: Public building site

검색결과 176건 처리시간 0.03초

공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 - (A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - )

  • 박준수;안용한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

BIM 기반 터널 출구부 직광영향검토 Dynamo 알고리즘 개발 (Development of Dynamo Algorithm Based on BIM for Direct Sunlight Impact Analysis of Tunnel Outlet)

  • 권바름;염춘호
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.41-51
    • /
    • 2022
  • BIM was introduced under the leadership of public institutions, and projects such as road, railway, and site creation, including BIM tasks, are currently being ordered. In addition, as the Ministry of Land, Infrastructure and Transport(MOLIT) is pushing for the full design of BIM, public institutions under its jurisdiction are also pushing for the full design of BIM. Full design of BIM means that all designs are done with BIM. Public institutions' BIM guidelines only require BIM deliverables, and there is a limited direction for the BIM design process to respond to traditional design approaches. Therefore, it is necessary to develop a BIM-based design process corresponding to the full design of BIM.

일제강점기 관찰부 이전(移轉) 후 관련건축물의 변화에 관한 연구 -수원과 충주를 중심으로- (Changes of Gyeonggi and Chungbuk Provincial Office Buildings after Relocation during Japanese Colonial Period -focusing on Suwon and Chungju-)

  • 최지해;한동수
    • 건축역사연구
    • /
    • 제30권4호
    • /
    • pp.7-16
    • /
    • 2021
  • This study examines changes and features of provincial office buildings in Suwon and Chungju after relocation during Japanese occupation. Gyeonggi and Chungbuk provincial offices(Gwanchalbu) were relocated by Japan. Gyeonggi Provincial Office in Suwon used HwaseongHaenggung buildings and moved to Seoul in 1910. After relocation, most of HwaseongHaenggung buildings used for Suwon Governmental hospital(JaHye Uiwon). Suwongun Office, Suwon public elementary school, Japanese Military and Suwon Police station also used HwaseongHaenggung buildings with the Hospital. At first, Japan remodeled local government buildings for their use. Most of HwaseongHaenggung buildings had been destroyed to build new buildings since 1920s. Chungbuk Provincial office in Chungju used DongHeon building which is Chungju local government building and relocated to Cheongju in 1908. DongHeon building changed to Chungju county office after relocation. This building was renovated. Chungju county office moved to other site, this building was used for Chungju county conference room. During Japanese colonial period, Suwon local government buildings were destroyed and replaced with new Japanese style buildings. Chungju local government buildings were also renovated or destroyed.

Three Mile Island: Medical and Public Health Aspects of a Radiation Accident

  • Linnemann Roger E.
    • Journal of Radiation Protection and Research
    • /
    • 제6권1호
    • /
    • pp.45-52
    • /
    • 1981
  • The March 1979 accident at Three Mile Island provided physicians specializing in radiation medicine an opportunity to observe the field under conditions never seen before. Since no, injuries occurred at the site or within the community, medical personnel were immediately involved in efforts to allay fear, provide accurate information, and replace labortory resources rendered ineffective by the release in the reactor building. Valuable insights concerning medical emergency planning are derived from the accident; suggestions are made for handling any future mishaps.

  • PDF

폐기물처리시설 입지선정에 따른 사례연구 (A Case Study for Site Selection of the Waste Treatment Facilities)

  • 이해승
    • 환경위생공학
    • /
    • 제19권1호
    • /
    • pp.24-36
    • /
    • 2004
  • This study is to investigate the present condition of waste disposal establishment and to analysis problems which could be produced at location selection formalities of waste disposal establishment. It proposed building methods of waste disposal establishment to lead spontaneous participation of local resident according to case analysis of waste disposal establishment. There are research results; i) Opposition of inhabitants was the majority of reason at the business abandonment or delay of waste disposal establishment. Therefore agreement formation course with local inhabitants is most important position. ii) Many estimate have been needed for waste disposal establishment, but support estimate of government was 30-50% that is really low compare with other environmental establishment. So that it need to increase of government estimate. iii) Location collection is carried out based on law and final collected location must be executed without delay of relation business as soon as possible. iv) Standard of location collection has to divide into small, middle and large size and to apply with same rule according to divided location. v) It must be change public subscription before and location selection after and maintain continuance of information offer to local inhabitants and offered information. vi) after building of waste disposal establishment for solving distrust of waste disposal establishment. It must be planed and carried on useful support countermeasure to local inhabitants in actuality.

일제의 필지 분할에 의한 동래부 객사 공간의 해체 과정 (The Process of Dissolution on the Lots-Subdivision at Gaeksa of Dongnae-bu by Japanese Imperialism)

  • 송혜영;서치상
    • 건축역사연구
    • /
    • 제22권3호
    • /
    • pp.27-36
    • /
    • 2013
  • The purpose of this study is to analyze the process of lots-subdivision within the block of Gaeksa at Dongnae-bu under the rule of Japanese Imperialism. Gaeksa of the old government office was the sanctuary that symbolized the sovereignty. Therefore it was naturally a main object of demolition and then the site was converted to other purpose. And Gaeksa was not only converted into the elementary school and the public market but the historic site also processed to break down for opening the road through Japanese Occupation of Korea. The main reasons of lots-subdivision were the transfer from state property to private ownership and the urban development project. Needless to say, the particular major reason was derived from the intention of Japanese Imperialism to destroy the traditional urban. As a result, Gaeksa can not be recognized the traces of today and contributes to the demolition of the remaining ancient building. Finally the deformed urban structure was left over from destroyed building.

시공사례 분석을 통한 모듈러 주택 원가절감 우선순위 항목 도출 (Priority Derivation of Modular House Cost Reduction Factors through Case Analysis)

  • 류국무;문예지;조병후
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2016
  • Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.

  • PDF

수주지열정 지열원 열펌프 시스템의 집단주거시설 적용을 위한 기반 기술 분석 (A Study on the SCW Ground Source Heat Pump System Technologies for Residential Cluster Homes)

  • 이광호;도성록;최종민
    • 한국지열·수열에너지학회논문집
    • /
    • 제15권3호
    • /
    • pp.14-20
    • /
    • 2019
  • In this study, the technologies and regulations for distributing standing column well(SCW) ground source heat pump systems to the residential cluster homes were investigated. They have only been installed in the public or commercial building having different load pattern and site structure compared with the residential cluster homes. Some of SCWs for the residential cluster homes should be installed under the basement due to a lack of site area. There are pressure differences between the SCWs installed under ground surface and basement. It is needed to develop the technology or devices to prevent overflow caused by pressure difference among the SCWs. In addition, heat balance algorithm between SCWs should be adopted to maximize the system efficiency. A heat pump having heating, cooling, hot water, heating-hot water, and cooling-hot water modes should be developed for adopting an individual air-conditioning system to the residential cluster homes.

중국 북경시 5성급 호텔 로비의 공간구성 특성에 관한 연구 - 1978년부터 2008년까지의 비즈니스호텔을 중심으로 - (A Study on the Architectural Characteristics of Lobby in the 5-Star Beijing Hotel in China - Focusing on the Business hotels from 1978 until 2008 -)

  • 가오용;김환식;이정수
    • 한국실내디자인학회논문집
    • /
    • 제19권5호
    • /
    • pp.156-164
    • /
    • 2010
  • This study examines for the making a deduction of architectural characteristics of high-rise business hotel's lower public space through analyzing the lobby space composition through Beijjng's 21 cases constructed from 1978 until 2008 in China. In the methods of analyzing process, We study the literatures, research reports and architectural drawings including the site survey. We hope to establish the principle in public space composition of Beijing's business hotels through analyzing the plan of these hotels. Finally, We find out the principles after researching as follows. Firstly, duration of business hotel construction was concentrated with the center of Beijing City especially central 5 Gu which will roll. To 1990's after that the high-rise hotel construction increased in order for the demand of the resort and the convention hotel to come to be many. The modem style was increased in hotel design of building's style. Secondly, the result which analyzes an 21 case study shows concourse style of public space composition is representative in lobby space of general 5 star business hotel in Beijing. And there are many upper composition style in sectional plan, modern style in lobby interior design. The third, the medium and small sized hotel have the plane which apply the public space efficiently.

공공교육시설 설계프로세스의 디지털 건축 디자인 도입 가능성에 관한 연구 -계획설계 단계에서 BIM의 데이터베이스(DB)이용 중심으로- (A Study on the Possibility of Introduction of Digital Architectural Design by Public Education Facilities of the Design Process - Focus on Use the Database of BIM -)

  • 성기용;조병성
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권4호
    • /
    • pp.5-12
    • /
    • 2012
  • In this study, a digital design process by utilizing the program's database functionality in BIM, public education facilities master plan presented an alternative model to the layout of the design process. First of all, public education facilities master plan design process with digital design process and how to use the database of BIM in the process for review of the possibility of. Secondly, public educational facility planning the placement as needed for the switch to digital design limits, and the basic plan design at various elementary school planning alternatives in a school building and the school site is required to investigate. Thirdly, as a way of using the database features of GDL BIM lnn and teachers on how to create a variable by setting up a number of different alternatives so that you can choose the architect thought to have to organize and visualize the possibility of quick. A quantitative way the basic plan design that repeats some of the measures that can be used for digital design change as a process of continuous research is needed.