• Title/Summary/Keyword: Public Procurement Service

Search Result 81, Processing Time 0.028 seconds

Proposal for the Hourglass-based Public Adoption-Linked National R&D Project Performance Evaluation Framework (Hourglass 기반 공공도입연계형 국가연구개발사업 성과평가 프레임워크 제안: 빅데이터 기반 인공지능 도시계획 기술개발 사업 사례를 바탕으로)

  • SeungHa Lee;Daehwan Kim;Kwang Sik Jeong;Keon Chul Park
    • Journal of Internet Computing and Services
    • /
    • v.24 no.6
    • /
    • pp.31-39
    • /
    • 2023
  • The purpose of this study is to propose a scientific performance evaluation framework for measuring and managing the overall outcome of complex types of projects that are linked to public demand-based commercialization, such as information system projects and public procurement, in integrated national R&D projects. In the case of integrated national R&D projects that involve multiple research institutes to form a single final product, and in the case of demand-based demonstration and commercialization of the project results, the existing evaluation system that evaluates performance based on the short-term outputs of the detailed tasks comprising the R&D project has limitations in evaluating the mid- and long-term effects and practicality of the integrated research products. (Moreover, as the paradigm of national R&D projects is changing to a mission-oriented one that emphasizes efficiency, there is a need to change the performance evaluation of national R&D projects to focus on the effectiveness and practicality of the results.) In this study, we propose a performance evaluation framework from a structural perspective to evaluate the completeness of each national R&D project from a practical perspective, such as its effectiveness, beyond simple short-term output, by utilizing the Hourglass model. In particular, it presents an integrated performance evaluation framework that links the top-down and bottom-up approaches leading to Tool-System-Service-Effect according to the structure of R&D projects. By applying the proposed detailed evaluation indicators and performance evaluation frame to actual national R&D projects, the validity of the indicators and the effectiveness of the proposed performance evaluation frame were verified, and these results are expected to provide academic, policy, and industrial implications for the performance evaluation system of national R&D projects that emphasize efficiency in the future.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Development of an Verification System for Enhancing BIM Design Base on Usability (활용성을 고려한 BIM 설계 오류 검증시스템 개발)

  • Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

Proposal of Equations related to Settlement and Lateral Movement According to Embankment on Marine Sedimentary Ground (해성퇴적지반에서 성토로 인한 침하량과 측방유동량 산정식 제안)

  • Kim, Kyeong-Su;Chung, Dae-Seouk;Lee, Jong-Gil
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.191-202
    • /
    • 2010
  • In this study, the relationship between the settlements and the horizontal displacements according to embankment was analyzed at the marine sedimentary grounds for preparation of a site, and then the empirical equations of both the settlement and the horizontal displacement considering the embankment load and the thickness were proposed. To do this, the field and laboratory tests were performed at the improvement section where the pre-loading method was applied, and the field monitoring was performed using various sensors. Based on the results of the tests and monitoring, the ground deposits, soil characteristics and engineering properties were analyzed and the settlements and lateral movements were estimated by the Regression analysis. The ground deposits from the ground surface were composed of reclaimed soils, sedimentary soils and based rocks. The thickness of clay in the sedimentary soils layer was ranged from 3.9 m to 44.5 m. The embankment heights to improve the ground during pre-loading were constructed from 4.7 m to 7.8 m in each section. The settlements during embankment were ranged from 0.959 m to 2.217 m and the lateral movements were ranged from 0.048 m to 0.313 m. As the result of regression analysis, the equations of settlements and horizontal displacements according to embankments may be proposed as $s=0.02h^2+0.11h$ and ${\delta}=0.01e^{0.37h}$, respectively. The proposed empirical equations of the settlements and the horizontal displacements according to embankment on the marine sedimentary ground may be applied to the site where has a similar condition of study area.

Analysis of Confusion of Azalea Cultivars and Its Actual State of Use in Landscaping Businesses (조경업체에서의 철쭉재배품종의 혼선 및 이용실태 분석)

  • Choi, Jae-Jin;Park, Seok-Gon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.2
    • /
    • pp.86-90
    • /
    • 2014
  • This study was conducted to examine the state of confusion about those azalea cultivars(hereinafter, Azalea Cultivars) that are used among practicians in landscaping businesses(designers, constructors, and producers). Which Azalea Cultivars would be delivered when they were ordered to producers using the names of Azalea Cultivars notified by the Public Procurement Service. In addition, the situations of azalea cultivar planting designs in the planting design drawings of three apartments completed recently and whether the Azalea Cultivars on the design drawings were the same as those Azalea Cultivars that were actually planted were examined. When Azalea Cultivars were ordered using the notified names, three Azalea Cultivars; Beni, Three, and Daewang were delivered for the name Yeongsanhong and two Azalea Cultivars; Zasanhong and Hancheol were delivered for the name Zasanhong. Yeongsanhong was perceived as a common name of Beni, Three, and Daewang by producers. Therefore, this caused confusion between producers and purchasers. In the case of Zasanhong, as the traits of Zasanhong are similar to those of the cultivar Hancheol, the producers or purchasers might have been unable to clearly distinguish between the cultivars and thus two cultivars might have been delivered without being distinguished from each other. The names of Azalea Cultivars used in planting design drawings were the names notified by the notifying agencies or comprehensive and unclear names such as azalea and Yeongsanhong. Completely different Azalea Cultivars from those written in planting design drawings were planted in actual construction sites in many cases. These situations should have occurred because designers did not write accurate cultivar names in planting design drawings and constructors could not accurately perceive the classification characteristics of individual Azalea Cultivars but planted those Azalea Cultivars with similar flowers colors or those that could be easily bought to fit the conditions of construction sites.

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

Characteristics of Park Program Operation of Seoul Metropolitan Government (서울시의 공원 프로그램 운영 특성)

  • Cho, Yun Joo;Chae, Young;Wee, Man-Gyu;Jung, Sang Hak;Song, Hyeong Nam;Kim, Yun-Geum
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.2
    • /
    • pp.10-19
    • /
    • 2020
  • The park program can adeptly cope with the diversification of leisure needs in accordance with the changing times. The program also makes the relationship between the users and the park itself closer. For this reason, the Seoul Metropolitan Government has operated a variety of programs, beginning with the Botanical Class Program at the Namsan Outdoor Botanical Garden in 1997. The government additionally began to organize park programs by establishing the Park and Leisure Department and three Park Greenery Offices. However, research on park programs is mainly focused on park users. Therefore, this study intends to reveal the structure of the programs by studying the program operation. The specific purposes of this study are '1. Review the institutional characteristics that underlie the operation of the Park Program in Seoul by examining the relevant laws, the operation organizations, and the personnel composition, 2. Analyze the operation methods, such as procurement and the execution of the program, operation costs, and public-private cooperation methods, etc. 3. Analyze the composition and contents of the program from 2015 to 2017, and process and identify the relationship between the structure of the program operation and the program itself.' Summarizing the results obtained from the study, as far as the structure of the first program operation, the support laws were not systematic, but the operating organization was working to establish a system. The second characteristic of the operation is that most of the budget was funded by local governments, but the level of citizen involvement was low. Third, when we looked at the characteristics of the program, the number of programs increased, but they were focused on a specific theme and few programs actively used the park facilities. Based on the results, three tasks can be proposed. The first is that the 'Act on Parks and Green Spaces' should include the concepts and support for park programs. Second, there is a need to change from the ideas of the quantitative increase of programs to qualitative improvements. Lastly, it is necessary to reorganize the Green Seoul Bureau of the Seoul Metropolitan Government into a citizen-led and leisure-oriented organization to promote the park leisure culture. This study has significance, as it was conducted with a service provider, not a program user, unlike many previous park program-related studies. The results of this study will be able to contribute not only to the Seoul Metropolitan Government, but also to other local governments to suggest the direction of the management and the operation of the park for the consumer, and consequently, it will help prepare the long-term vision of parks as the closest leisure location for most citizens.

A Study for the Evaluation of Container Modules; The Technology of Korean Container Tree Production Model (한국형 컨테이너 조경수 생산기술로서 컨테이너 모듈의 성능 평가)

  • Jung, Yong-Jo;Lim, Byung-Eul;Oh, Jang-keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.59-67
    • /
    • 2016
  • In landscape design by public institutions, although the costs and species of landscape trees stipulated by the Korean Public Procurement Service(PPS) are generally adhered to, the PPS regulations about planting trees with well-developed rootlets are almost entirely neglected. This study aimed to evaluate the performance of buried container modules, which are a new technology and product in landscape production that is able to reduce the defect rate while complying with regulations. To this end, this study measured rootlet density, rootlet development length, rootlet survival rate on excavation, and impairments of tree growth for 3 months after root pruning, and compared these variables for the container modules with those for trees that underwent root pruning in bare ground, and those that were cultivated in a container above ground. The results were as follows: First, the rootlet density was 88% for the trees in container modules, which was very high. Trees that underwent standard root pruning in bare ground had a somewhat lower density of 64%. Meanwhile, the trees that were cultivated in pots above ground died, invalidating measurement. Second, in terms of rootlet development and rootlet survival rate, the trees in container modules showed a mean length of 10.4cm, and 100% survival rate, indicating that there was no rootlet damage caused by excavation. For the trees that only underwent root pruning in bare ground, the mean length was 25.6cm and the rootlet survival rate was only half that of the trees in container modules, at 56%, demonstrating considerable damage. Rootlet development did not occur at all in the trees grown in pots. Third, the trees in container modules and those that underwent root pruning in bare ground did not show any deaths during the root pruning process, or any impairments such as stunted leaf growth. Conversely, the trees grown in pots nearly all died, and severe impairments of tree growth were observed. As shown by the results above, when we evaluated the performance of buried container modules, they showed the most outstanding performance of the three models tested in this study. The container modules prevent defects by stimulating early rooting in environments that with poor conditions for growth, or in trees that are not suited to the summer environment Therefore, it is expected that they would be an optimal means by which to enable compliance with rules such as the regulation presented by the PPS.